Professional Documents
Culture Documents
Excavation Area 46.65 30.51 1423.29 SQM PCC 2.5 2 5 1.9 1.7 3.23 Metal Filling 40 63
Excavation Area 46.65 30.51 1423.29 SQM PCC 2.5 2 5 1.9 1.7 3.23 Metal Filling 40 63
Excavation Area 46.65 30.51 1423.29 SQM PCC 2.5 2 5 1.9 1.7 3.23 Metal Filling 40 63
29 sqm
PCC = 2.5*2 = 5
= 1.9*1.7 = 3.23