Built Up Rates
Built Up Rates
a) Material Cost
b) Labour Cost
I) 2 Skilled Worker @ RM 80.00 / day RM 160.00 /day
ii) 1 General Worker @ RM 50.00 / day RM 50.00 /day
RM 210.00 /day
Productivity = 40 m2/day
RM
RM
c) Wastage
10% of item (a - b) RM
RM
TOTAL RM
Say RM
17.50 /M2
3.20 /M2
5.25 /M2
25.95 /M2
2.60 /M2
28.55 /M2
4.28 /M2
32.83 /M2
31.00 /M2