ABE International Business College Training Plan

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

ABE International Business College

Lucena City
TRAINING PLAN
Qualification: Computer System Servicing NCII

Date
Trainee’s Training Training Activity/ Mode of Facilities/ Tools Assessment
Staff Venue and
Requirement Task Training and Equipment Arrangement
Time
CORE COMPETENCIES
Install and configure computer systems
1. Assemble computer 1.1 OH&S Policies Industry- Daria Par-  Computer Open IT  Hands-on Feb
Hardware and procedures. Based Hughes System  Direct 2,
1.2 Materials, tools Training  Anti-static observation 2018
and equipment in wrist strap  Practical 8:00
accordance.  Set of screw demonstratio 5:00
1.3 Assemble driver n
computer  Cutter
hardware.  Allen
1.4 Configuration of wrench(0.5-
BIOS 0.25 inch)
 Flashlight
 Sharp
pointed
tweezers
 Cable tie
 Personal
Protective
equipment(P
PE)

Date Developed: 2/26/2018 Document No.


Training Plan for Computer System Page 1 of 3
Servicing NCII Developed by: Jennifer Roxas- Issued by: ABE International Business
Magbanlac College
2. Install operating 2.1 Install Operating Industry- Gear  Operating Globe  Hands-on Feb
System and drivers System. Based Arrellano system Telecom Inc.  Direct 3,
for peripherals 2.2 Install and Training II installer observation 2018
Devices configure  Printer,  Practical 8:00
peripherals / scanner, demonstratio 5:00
devices. mouse, n
2.3 Updating drivers keyboard,
and peripherals webcam and
2.4 Undertake on- other
going checks to peripherals
ensure quality of  Drivers
work  Utility
software
 Notebook and
pen
3. Install the computer 3.1 Install application Industry- Daria Par-  Productivity Open IT  Hands-on Feb
Application software Based Hughes tools  Direct 4,
software 3.2 Carry out Training  Utility observation 2018
variation to software  Practical 8:00
application  Internet demonstratio 5:00
software connection n
installation  Manual
3.3 Access and install  Computer
software updates system
4. Conduct testing 4.1 Test Industry- Gear  Multi-Tester Globe  Hands-on Feb
and documentation devices/system Based Arrellano  Cable tester Telecom Inc.  Direct 5,
and/or Training II  Manual observation 2018
installation  Notebook  Practical 8:00
4.2 Conduct stress and pen demonstratio 5:00
test  Computer n

Date Developed: 2/26/2018 Document No.


Training Plan for Computer System Page 2 of 3
Servicing NCII Developed by: Jennifer Roxas- Issued by: ABE International Business
Magbanlac College
4.3 Follow 5s and 3rs system
according to  Mirror Flash
environmental light
policies
4.4 Prepare and
forward
documentation
Prepared by: Jennifer Roxas-Magbanlac Noted by:
Signature Over Printed Name
Signature Over Printed Name
Facilitator Head of Office

Date Date

Date Developed: 2/26/2018 Document No.


Training Plan for Computer System Page 3 of 3
Servicing NCII Developed by: Jennifer Roxas- Issued by: ABE International Business
Magbanlac College

You might also like