PROJECT: FIELD ERECTION OF 15000 BBLs TANK (IK-

2545) F O R M S

Job Safety Analysis Doc. Level IV Doc. Version: 00

Asphalt Layer Application


Doc. No.: HSE-FRM-43 W.e.f: 20-3-2012
JSA Date: 10-06-2012 JSA NO:
Assessment Team: Yasin Rind, M.Waqas Farooq, Ahmad Bilal, Fazal Hussain

PTW NO. PPE's Required: Safety Helmet, Safety Shoes, Leather Gloves, Safety Goggles and Mask

Step

No: Hazard Description &


Description of Task Step Controls Measures Residual Risk Controls
Effect

Awareness & avoidance of potential contact with


Wear all personal protective equipment (hand gloves,
asphalt.
long boots and coverall).
Contact with body parts Display Safety Signs.
Deployment of trained manpower and tools as required.
(Burns) Conduction of tool box
Use heat resistant PPEs. Proper access should be
meeting before commencement of job.
provided.

1 Transportation of Asphalt

Display Safety Signs.


Proper Barricading of Area. Conduction of tool box meeting before
Fire Hazard Deployment of trained manpower and tools as required. commencement of job.
Fire Extinguisher shall be present in area. Continuous monitoring of flammable
contents with LEL meter.

Awareness & avoidance of potential contact with


asphalt.
Display Safety Signs.
Deployment of trained manpower and tools as required.
Injury due to mishandling MSDS available.
2 Application of Asphalt Use heat resistant PPEs.Wear all personal protective
(Burns) Conduction of tool box meeting before
equipment (hand gloves, long boots and coverall).
commencement of job. Provision of water for
emergency eye wash or showering.

Controlled and Confidential @ IKAN Engineering Services (Pvt.) Limited Page 1 Of 4


PROJECT: FIELD ERECTION OF 15000 BBLs TANK (IK-
2545) F O R M S

Job Safety Analysis Doc. Level IV Doc. Version: 00

Asphalt Layer Application


Doc. No.: HSE-FRM-43 W.e.f: 20-3-2012
JSA Date: 10-06-2012 JSA NO:
Assessment Team: Yasin Rind, M.Waqas Farooq, Ahmad Bilal, Fazal Hussain

PTW NO. PPE's Required: Safety Helmet, Safety Shoes, Leather Gloves, Safety Goggles and Mask

Step

No: Hazard Description &


Description of Task Step Controls Measures Residual Risk Controls
Effect

Sufficient amount of cold water Vigilant supervision shall


shall be ensured at site. be ensured.
De-hydration Heat Stroke
Shaded Resting areas shall be More rest time
provided at site. Provision of ORS

Application of Asphalt

Display Safety Signs.


Proper Barricading of Area. Conduction of tool box meeting before
Fire Hazard Deployment of trained manpower and tools as required. commencement of job.
Fire Extinguisher shall be present in area. Continuous monitoring of flammable
contents with LEL meter.

Prepared By: Reviewed By: Approved By:

Controlled and Confidential @ IKAN Engineering Services (Pvt.) Limited Page 2 Of 4


R M S

Doc. Version: 00

W.e.f: 20-3-2012

Risk Controls

e of potential contact with

Conduction of tool box


ncement of job.

box meeting before

nitoring of flammable
r.

e of potential contact with

ox meeting before
Provision of water for
r showering.

Controlled and Confidential @ IKAN Engineering Services (Pvt.) Limited Page 3 Of 4


R M S

Doc. Version: 00

W.e.f: 20-3-2012

Risk Controls

ll

box meeting before

nitoring of flammable
r.

Controlled and Confidential @ IKAN Engineering Services (Pvt.) Limited Page 4 Of 4