TIME SHEET FOR WORK ON SITE

PCP JOB REFERENCE : KX3S


CUSTOMER’ , S REFERENCE : 132/33KV SUBSTATION BICCUVOLU,AP TRANSCO
CUSTOMER : AP TRANSCO
SITE : 132/33KV SUBSTATION BICCUVOLU,AP TRANSCO
ENGINEER ‘S NAME: SRIKANTH MONTH :OCTOBER
JOB UNDERTAKEN : PENDING POINTS

DATE WORKING TIME OVERTI Bay Activity Performed


ME No &
Name
FROM TO H FR TO H
O O O
U M U
R RS
S
01/11/17 Reported in 400/220kv velthur sub-station and
discussed with customer about pending
points,taken ip list and network name from abb
engineer and modified data base as for the abb
list
02/11/17 09:00:00 18:00:00 Communication established between abb
network and Alstom panels with proper
dressing .

03/11/17 09:00:00 18:00:00 9 All DI’s checked up to bcu by shorting in tb for


B407,410 and given icd files to abb engineer
04/11/17 09:00:00 18:00:00 9 Modified icd files of d60 and give to abb
engineer and cooridinated with abb engineer
and communication established from abb scada
to p444,p141,p141
05/11/17 09:00:00 18:00:00 9 sunday
06/11/17 09:00:00 18:00:00 9 Coordinated with abb engineer to make
communication between c264,d60 to scada
07/11/17 09:00:00 18:00:00 9 Coordinated with abb engineer and made
communication between c264 and scada
08/11/17 09:00:00 18:00:00 9 Coordinated with abb engineer and made
communication between D60 and scada
09/11/17 09:00:00 18:00:00 9 Auto recloser checked in 410 bay and all
remote operations checked from bcu
10/11/17 09:00:00 18:00:00 9 Auto recloser checked for B407 and protection
signals tested for B410
11/11/17 09:00:00 18:00:00 9 Metering and synchro check checked for bay
410&407 and checked protection signals for
B407,P444
12/11/17 09:00:00 18:00:00 9 sunday
13/11/17 09:00:00 18:00:00 9 Waiting for witness and tested line 1&line 2

Page 1 of 2
auto recloser with withness
14/11/17 09:00:00 18:00:00 9
15/11/17 09:00:00 18:00:00 9 Coordinated with abb for Line to tie (main1
,main2)auto recloser testing internally
16/11/17 09:00:00 18:00:00 9 P444,D60 protection signal tested with witness

17/11/17 09:00:00 18:00:00 9

TO & FRO FARE FROM


ACCOMODATION
THE
DAILY
RATE
IS
MATERIAL SUPPLIED:

SIGNATURE DATE SIGNATURE

ENGINEER ‘S NAME : SRIKANTH CUSTOMER ‘S NAME: PARAMDHAMAIAH

DESIGNATION: SAS ENGINEER

DESIGNATION: ASSISTANT DIVISIONAL

GE T&D India Limited. ENGINEER

CUSTOMER: A.P TRANSCO

Page 2 of 2

You might also like