AS BUILT DRAWING

PT. DAYA MITRA TELEKOMUNIKASI

GF MONOPOLE 25M
SITE NAME : DMT MM KOLAM MAKALE
PROJECT ID : ( MLE150 )
SITE ID : 17TS06Z0472
SULMAPUA
PT. DAYA MITRA TELEKOMUNIKASI
TAHUN 2017
DRAWING LIST NOTES / REMARK

NO DRAWING TITLE NO DRAWING SKALA REMARK


1 COVER LIST 00 NTS
2 DRAWING LIST 01 NTS ACKNOWLEDGE BY
3 SITE MAP 02 NTS PT. DAYA MITRA TELEKOMUNIKASI

4 SITE LAYOUT 03 NTS


5 TAMPAK DEPAN & SAMPING 04 NTS JUHERMAN
PM MCP RO SULMAPUA
6 POTONGAN LAYOUT 05 NTS PROJECT NAME

7 DETAIL PONDASI TOWER 06 NTS


8 PROPHOSED ATHENA PALACEMENT 07 NTS PEMBANGUNAN BTS
9 LAYOUT KONTUR 08 NTS
10 LAYOUT GROUNDING 09 NTS CONTRACTOR
PT. ASA BERKAT BERSAMA
11 SKEMA GROUNDING 10 NTS
12 DETAIL POLE TOWER 25M 11 NTS
13 DETAIL POLE TOWER 25M 12 NTS PROJECT MANAGER

14 DETAIL POLE TOWER 25M 13 NTS DRAWN BY CHECKED BY VERIFIED BY REGIONAL

15 DETAIL POLE TOWER 25M 14 NTS


16 DETAIL TANGGA KNOCK DOWN 15 NTS
17 DETAIL POLE KWH METER 16 NTS DATE : DATE : DATE :

DRAWING TITLE
18 DETAIL BOX KWH 17 NTS
19 WIRING DIAGRAM KWH 18 NTS AS BUILT DRAWING
20 DENAH & POTONGAN BTS OUTDOOR 19 NTS
21 DENAH & POTONGAN PONDASI OUTDOOR 20 NTS DRAWING SUBTITLE

22 DENAH & PENULANGAN PELAT BTS OUTDOOR 21 NTS DRAWING LIST


23 FO LAYOUT 22 NTS
24 TAMPAK & POTONGAN PAGAR TYPE E 23 NTS SITE ID SITE NAME
BO X 257
25 PAGARTYPE E & DETAIL 24 NTS SCALE
NO
REVISION
DATE SIGN

26 PINTU PAGAR & DETAIL TYPE E 25 NTS 1


2
NO REGISTER
01
N
NOTES / REMARK

W E

ACKNOWLEDGE BY
S PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA
3m

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL


4m

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

SITE MAP
SITE MAP
NTS SITE ID SITE NAME
BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
02
B

NOTES / REMARK
3000
KOLOM PRAKTIS15/15 1425 1425 KOLOM PRAKTIS15/15
TUL 4Ø 12 & Ø8-150 150 1100 1500 100150 TUL 4Ø 12 & Ø8-150

150

100150
ACKNOWLEDGE BY

MONOPOLE 25M PT. DAYA MITRA TELEKOMUNIKASI

1050

PROPOSED BTS OUTDOOR


1925

1925
JUHERMAN
PM MCP RO SULMAPUA

2400
PROJECT NAME

4000
PEMBANGUNAN BTS

Pole ACPDB
4000

GRAVEL CONTRACTOR
2650

ELEV + 0.20
PT. ASA BERKAT BERSAMA
1925

1925
600
A A
PROJECT MANAGER
900

PANEL MULTI

600
PINTU MASUK ( PINTU GESER)
DRAWN BY CHECKED BY VERIFIED BY REGIONAL
150

150
300
150 1150 1850 150
KOLOM PRAKTIS15/15 1175 1675 KOLOM PRAKTIS15/20
TUL 4Ø 12 & Ø8-150 3000 TUL 4Ø 12 & Ø8-150
DATE : DATE : DATE :

RABAT RABAT DRAWING TITLE

8m
AS BUILT DRAWING

DRAWING SUBTITLE

3000 SITE LAYOUT


SITE ID SITE NAME

LAYOUT BO X 257
SCALE REVISION
NTS NO DATE SIGN
1
2
NO REGISTER
03
MONOPOLE 25M
MONOPOLE 25M

NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

BTS Outdoor
DRAWN BY CHECKED BY VERIFIED BY REGIONAL
Panel Multi
Pole Panel Multi
Kawat duri
Kawat Berduri
Pintu geser
Pagar Type E

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING
Pole ACPDB

DRAWING SUBTITLE

TAMPAK DEPAN & SAMPING

SITE ID SITE NAME


BO X 257
4106 5379 SCALE REVISION
NO DATE SIGN
1
TAMPAK DEPAN TAMPAK SAMPING 2
NTS NO REGISTER
NTS
04
MONOPOLE 25M
MONOPOLE 25M

NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :


500

DRAWING TITLE

500 AS BUILT DRAWING

DRAWING SUBTITLE
3400

3400

POTONGAN LAYOUT
SITE ID SITE NAME
BO X 257
SCALE REVISION
3000 NO DATE SIGN
4000
1
2
POTONGAN A-A POTONGAN B-B NO REGISTER
NTS NTS
05
NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PILE PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER
POTONGAN PONDASI
DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

DETAIL PONDASI TOWER


SITE ID SITE NAME
BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
06
MATERIAL CRITERIA :
ALL DIMENSION ON MM
NOTES / REMARK
ALL STRUCTURE GALVANIZED
PIPE STANDARD : ASTM A53
BOLD STANDARD : ASTM A325
CAMOUFLAGE MAT : FIBER COMPOSIT
TYPE CAMFL : RF TRANSPARANT
ACKNOWLEDGE BY
LOAD ANTENNA : PT. DAYA MITRA TELEKOMUNIKASI

UNIT SECTOR ELVEVASI (m)


3x ANTENA RF 23.75
JUHERMAN
3x ANTENA RF 21.00 PM MCP RO SULMAPUA
3x ANTENA RRU 18.00 PROJECT NAME
3x ANTENA RRU 17.50
3x ANTENA MW 0.6 19.00
PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

PROPHOSED ANTHENA PALACEMENT

SITE ID SITE NAME


BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
07
NOTES / REMARK

3.00 m ACKNOWLEDGE BY

4-4 B 5-5 B 6-6 B PT. DAYA MITRA TELEKOMUNIKASI


Elv + 1.00 Elv + 1.00
3-3 A 3-3 A

± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00 ± 0.00


Elv ± 0.00 Elv ± 0.00
JUHERMAN
PM MCP RO SULMAPUA
± 0.00 ± 0.00 ± 0.00 Elv - 1.00 0.00 1.00 2.00 3.00 Elv - 1.00 0.00 1.00 2.00 3.00 4.00
PROJECT NAME

SECTION 1 - 1 SECTION 4 - 4

PEMBANGUNAN BTS
Elv + 1.00

Elv + 1.00
± 0.00 ± 0.00 ± 0.00
2-2 A 4.00 m
2-2 A
Elv ± 0.00 CONTRACTOR
± 0.00 ± 0.00 ± 0.00
Elv ± 0.00
PT. ASA BERKAT BERSAMA
± 0.00 ± 0.00 ± 0.00 Elv - 1.00 0.00 1.00 2.00 3.00

Elv - 1.00 0.00 1.00 2.00 3.00 4.00

SECTION 2 - 2
SECTION 5 - 5
PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL


Elv + 1.00

Elv + 1.00
± 0.00 ± 0.00 ± 0.00
Elv ± 0.00

1-1 A
± 0.00 ± 0.00 ± 0.00 1-1 A
Elv - 1.00 0.00 1.00 2.00 3.00
Elv ± 0.00
± 0.00 ± 0.00 ± 0.00

Elv - 1.00 0.00 1.00 2.00 3.00 4.00

DATE : DATE : DATE :


SECTION 3 - 3
4-4 B 5-5 B 6-6 B
DRAWING TITLE
SECTION 6 - 6

AS BUILT DRAWING

DRAWING SUBTITLE

LAYOUT COUNTUR
SITE ID SITE NAME
LAYOUT COUNTUR SECTION COUNTUR BO X 257
Skala 1:100 SCALE REVISION
Skala 1:100
NO DATE SIGN
1
2
NO REGISTER
08
NOTES / REMARK
COPPER ROD (CP 4) COPPER ROD (CP 3)
Ø5/8" (CADWELD) Ø5/8" (CADWELD)

RING PARAMETER BC 50mm2

ACKNOWLEDGE BY
BCC 50mm2 BC 50mm2
PT. DAYA MITRA TELEKOMUNIKASI
Pole RRU Pole ACPDB
BC 50mm2 CONNECTOR
BIMETALIC
RING PARAMETER BC 50mm2

PROPOSED BTS OUTDOOR


AAC 50mm2 JUHERMAN
CONNECTOR EGB PM MCP RO SULMAPUA
BIMETALIC
RECT. EMERSON ACA
PROJECT NAME

RING PARAMETER BC 50mm2


Monopole 25m
PEMBANGUNAN BTS
TRAY
Pedestal
CONNECTOR AAC 50mm2
BIMETALIC AAC 50mm2
SPLITZEN
CONTRACTOR
BC 50mm2 AAC 50mm2
Lower BAR STELL LEADDER PT. ASA BERKAT BERSAMA

BC 50mm2
INSULATOR
Upper BAR
KWH PANEL

PROJECT MANAGER
AAC 50mm2
ALUMANIUM BUS BAR
Cooper Plate AND BOLT IS WELDED
BOLT DRAWN BY CHECKED BY VERIFIED BY REGIONAL

INTEGRASI DARI KAKI


TOWER BCC 50mm2

CONNECTOR
BIMETALIC DATE : DATE : DATE :

DRAWING TITLE
BC 50mm2 SMEARED WITH STELL
RING PARAMETER BC 50mm2 GLUE EPOXY PC7 BEFORE
TIGHTENED TO NINSULATOR

WELDED
AS BUILT DRAWING

SMEARED W/STELL GLUE DRAWING SUBTITLE


PC7 AFTER TIGHTENED
COPPER ROD (CP 1)
Ø5/8" (CADWELD) ALUMANIUM BUS
COPPER ROD (CP 2)
Ø5/8" (CADWELD) BOLT
t=10MM
ISULATOR
LAYOUT GROUNDING
STEL LADDER
SITE ID SITE NAME
BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
09
ANTENNA GSM
NOTES / REMARK

GSM & MW
Grounding Kit

Upper Busbar
Busbar Atas
Feeders
ACKNOWLEDGE BY

VERTICAL TRAY
PT. DAYA MITRA TELEKOMUNIKASI
The thread of all fixing bolts on the AREA BTS OUTDOOR
busbar must be destroyed after installation.
GSM & MW
Ulir pada semua baut yang terpasang pada Grounding Kit GSM & MW
busbar harus dihancurkan setelah instalasi. Grounding Kit
JUHERMAN
PM MCP RO SULMAPUA
BCC 50mm (dikoneksi ke BTS Outdoor) PROJECT NAME
Lower Busbar
Busbar bawah
BCC 50mm2
HORIZONTAL TRAY BCC 50mm (dikoneksi ke panel ACPDB) PEMBANGUNAN BTS

The thread of all fixing bolts on the CONTRACTOR


BCC 50mm2 busbar must be destroyed after installation. PT. ASA BERKAT BERSAMA
EGB
Ulir pada semua baut yang terpasang pada
busbar harus dihancurkan setelah instalasi.

Kabel Seling/ AAC 50mm2


Alumunium 50 mm2
PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL


SPLITZEN

Connector Bimetallic
AAC 50mm2 Connector Bimetallic
KWH Connector Bimetallic

DATE : DATE : DATE :


AAC 50mm2 BC 50mm2
BC 50mm2 DRAWING TITLE
BCC 50mm2 BC 50mm2 BC 50mm2
BCC 50mm2
BC 50mm2 2
Copper Rod 5/8" L=3m
2
Copper Rod 5/8" L=3m AS BUILT DRAWING
mm 0m
m
50 5
BC BC
BC DRAWING SUBTITLE
C 5
Kaki Tower 0m
BCC 50mm2 m2

BC 50mm2
BC 50mm2

BCC 50mm2
SKEMA GROUNDING
Copper Rod 5/8" L=3m BC 50mm2 Copper Rod 5/8" L=3m

SITE ID SITE NAME


BO X 257
Cooper Plate
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
10
NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

DETAIL POLE TOWER 25M


SITE ID SITE NAME
BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
11
NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

DETAIL POLE TOWER 25M


SITE ID SITE NAME
BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
12
NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

DETAIL POLE TOWER 25M


SITE ID SITE NAME
BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
13
NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

DETAIL POLE TOWER 25M


SITE ID SITE NAME
BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
14
NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

ALTERNATIVE TANGGA KNOCK DOWN

SITE ID SITE NAME


BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
15
NOTES / REMARK

1000
ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
NP0 PROJECT NAME

KWH METER
PLN
PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING
100

100
DRAWING SUBTITLE
400

400
DETAIL POLE KWH
200

200
SITE ID SITE NAME
BO X 257
SCALE REVISION
300 DETAIL POLE KWH METER 300 NO DATE SIGN
500 500 1
2
NO REGISTER
Scale : NTS
16
NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

DETAIL BOX KWH


SITE ID SITE NAME
BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
17
NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

WIRING DIAGRAM KWH


SITE ID SITE NAME
BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
18
NOTES / REMARK

LUBANG

ACKNOWLEDGE BY
Tray + 1.10 PT. DAYA MITRA TELEKOMUNIKASI
Horizontal
300mm
+ 0.75
JUHERMAN
Busbar + 0.60 PM MCP RO SULMAPUA

+ 0.40 PROJECT NAME

+ 0.20 Tanah urug dipadatkan

± 0.00 PEMBANGUNAN BTS


Tanah urug Pondasi Batu Kali 1:5
Pasir Urug CONTRACTOR
PT. ASA BERKAT BERSAMA

POT A-A POT B-B PROJECT MANAGER

A DRAWN BY CHECKED BY VERIFIED BY REGIONAL


± 0.00

Pole ACPDB
+ 0.60

+ 0.75
+ 0.40 DATE : DATE : DATE :

DRAWING TITLE
B B
+ 0.20
AS BUILT DRAWING

DRAWING SUBTITLE

DENAH & POTONGAN


BTS OUTDOOR
SITE ID SITE NAME
BO X 257
A SCALE
NO
REVISION
DATE SIGN
1
DENAH PONDASI NO REGISTER
2

19
+ 1.100

NOTES / REMARK
+ 0.75 + 0.75
+ 0.60

+ 0.40

+ 0.20 Tanah urug dipadatkan


ACKNOWLEDGE BY
± 0.00
PT. DAYA MITRA TELEKOMUNIKASI
Tanah urug Pondasi Batu Kali 1:5
Pasir Urug
JUHERMAN
PM MCP RO SULMAPUA
PROJECT NAME

PEMBANGUNAN BTS

POT A-A POT B-B CONTRACTOR


PT. ASA BERKAT BERSAMA

A PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

B B DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

DENAH & POTONGAN PONDASI


BTS OUTDOOR
A
SITE ID SITE NAME
BO X 257

DENAH PONDASI SCALE


NO
REVISION
DATE SIGN
1
2
NO REGISTER
20
4Ø12

Ø12-200 + 1.100
Ø12-200 2Ø12 NOTES / REMARK

Ø12-200 Ø12-200 + 0.75 Ø12-200

+ 0.60

+ 0.40
ACKNOWLEDGE BY
+ 0.20 Tanah urug dipadatkan PT. DAYA MITRA TELEKOMUNIKASI
± 0.00

Tanah urug Pondasi Batu Kali 1:5 JUHERMAN


PM MCP RO SULMAPUA
Pasir Urug
PROJECT NAME

PEMBANGUNAN BTS

CONTRACTOR
PT. ASA BERKAT BERSAMA

POT 1 - 1 POT ll - ll
I PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

Ø12-200

Ø12-200

II II
DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING
Ø12-200

Ø12-200

DRAWING SUBTITLE

DENAH & POTONGAN PENULANGAN


PLAT BTS OUTDOOR
SITE ID SITE NAME
DENAH TULANGAN BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
21
NOTES / REMARK

ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI

JUHERMAN
PM MCP RO SULMAPUA

500
PROJECT NAME

PEMBANGUNAN BTS
NP0

KWH METER
CONTRACTOR
PLN

PT. ASA BERKAT BERSAMA

PROJECT MANAGER

DRAWN BY CHECKED BY VERIFIED BY REGIONAL

Busbar
DATE : DATE : DATE :

DRAWING TITLE

AS BUILT DRAWING

DRAWING SUBTITLE

FO LAYOUT MAKRO
FO LAYOUT MAKRO
SITE ID SITE NAME
BO X 257
SCALE REVISION
NO DATE SIGN
1
2
NO REGISTER
22
200 1450 200 NOTES / REMARK

GIP Ø2"

1500
L.40.40.4 ACKNOWLEDGE BY

Barbed wire
PT. DAYA MITRA TELEKOMUNIKASI
5 lines +
Double Cross Line

JUHERMAN
PM MCP RO SULMAPUA
TAMPAK ATAS WELD
PROJECT NAME
SKALA 1 : 25

PIPE Ø2"
+ 3.00
PEMBANGUNAN BTS
L.40.40.4
WELD
ANCHORE TO FENCE COLUMN
800

KAWAT HARMONIKA CONTRACTOR


PT. ASA BERKAT BERSAMA
GIP Ø2"

+ 2.20
DETAIL 1
NTS PROJECT MANAGER

Barbed wire
DRAWN BY CHECKED BY VERIFIED BY REGIONAL
1500 5 lines +
Double Cross Line
KAWAT HARMONIKA GIP Ø2"

800
2000

DETAIL 1 DATE : DATE : DATE :

DRAWING TITLE

KAWAT HARMONIKA
KOLOM BETON
150/150
AS BUILT DRAWING
2000

DRAWING SUBTITLE
BRC pipe Ø2"
door wheel Ø4" ± 0.00 PINTU PAGAR & DETAIL TYPE E

50
L50x50x5, anchore each 1.00m
Concrete 1:3:5 Concrete 1:3:5 1450
SITE ID SITE NAME
A BO X 257
door wheel Ø4"
L50x50x5, anchore each 1.00m SCALE REVISION
NO DATE SIGN

POTONGAN A PINTU GESER 1


2
SKALA 1 : 25 SKALA 1 : 50 NO REGISTER
23
Standart Post Pipe 2" t 2mm
2400 2400 Hot Dip Galvanized

Bolt & Nuts ∅ 8 mm Bolt & Nuts ∅ 10 mm


Barbed wireb 5 lines + Kawat Harmonika 50
GIP ∅2" 50 x 50 Galvanized
Double Cross Line
Plate Connector t 6mm
+3.00
VI VIII
Hot Dip Galvanized

25
40
800

80
III NOTES / REMARK
500 500 500
V rail top L 40x40x4mm

+2.20
BM chainlink ∅3mm
KOLOM PRAKTIS
DYNA BOLT 1xM8
Plat bar 4x30x2000mm mesh 50x50 mm LIGHTGalvanized
150X150mm TWISTED-TWISTED
Hot Dip Galvanized
BOLT M8mm VII sni 07-6503-2001

II
DYNA BOLT 1xM8 BOLT M8mm
Detail a
2000

ACKNOWLEDGE BY

300
L.40.40.4mm

PT. DAYA MITRA TELEKOMUNIKASI

300
PLAT STRIP 3x30mm
I DYNA BOLT 1xM8
IV
DYNA BOLT 2xM8
PIPA ∅2"

+0.20 1
200 350 200

BOLT M8mm
Pas. DINDING 1/2 Bt Pas. DINDING 1/2 Bt
±0.00 standard post ∅ 2" T.2 mm

50
30 10
PLAT 30x3mm
JUHERMAN
PAS ROLAG BATA PAS ROLAG BATA
plate 4 x30 mm
30 BOLT M10
PM MCP RO SULMAPUA

40
50
-0.550 bolts & Nuts ∅8 mm
PROJECT NAME

30
500
lantai kerja 120 PLATE T=8mm
BM chainlink ∅ 3 mm WELDED TO PIPE
urugan pasir 50mm
TYPICAL SIDE VIEW mesh 50 x 50 mm LIGHTGalvanized
twisted-twisted PLAT STRIP 30x3mm
SKALA 1 : 50 sni 07-6503- 2001
PEMBANGUNAN BTS
DETAIL VII DETAIL V
KOLOM PRAKTIS SKALA 1 : 5 SKALA 1 : 5
150X150
DYNA BOLT M8 KOLOM PRAKTIS
150X150
DYNA BOLT M8
CONTRACTOR
L.40.40.4mm

KAWAT HARMONIKA L.40.40.4mm L.40.40.4mm PT. ASA BERKAT BERSAMA


22

LIGHTGALV. ∅3mm PLAT 8mm WELDED


MESH 50x50mm KAWAT HARMONIKA BOLT M8
110
67

TWISTED-TWISTED LIGHTGALV. ∅3mm


MESH 50x50mm PIPE ∅2"
22

TWISTED-TWISTED
10 30 30 KAWAT HARMONIKA
65 40 50 BOLT M10
base plate t=10mm PLAT STRIP 30x3mm
dyna bolt 2xm10

15

50
50
40
PROJECT MANAGER

120
PLAT STRIP 30x3mm

15
KAWAT HARMONIKA
BOLT M10 BOLT M10
dynabolt m8 LIGHTGALV. ∅3mm
L.40.40.4
MESH 50x50mm
+ PLAT STRIP 30x3mm
TWISTED-TWISTED
DYNA BOLT M8 PLAT t=8mm
KAWAT HARMONIKA
LIGHTGALV. ∅3mm KAWAT HARMONIKA DRAWN BY CHECKED BY VERIFIED BY REGIONAL
MESH 50x50mm LIGHTGALV. ∅3mm L.40.40.4mm
TWISTED-TWISTED MESH 50x50mm
bolt &nut m8 TWISTED-TWISTED
PLAT STRIP 30x3mm
L.40.40.4
15

KOLOM PRAKTIS + PLAT STRIP 30x3mm PIPA ∅2"


50

150X150mm KAWAT HARMONIKA


15

LIGHTGALV. ∅3mm

DETAIL II DETAIL III MESH 50x50mm


50

50

TWISTED-TWISTED
ROLAG
SKALA 1 : 5 SKALA 1 : 5 PLATE T=8mm L.40.40.4mm
BOLT M10

DYNABOLT M10 PLATE 30x3mm DATE : DATE : DATE :

50 40
±0.00
30 50 30
10
DRAWING TITLE
BOLT M10
BOLT M8mm
DOP
Galvanized
7 Lines Barb Wire
AS BUILT DRAWING
50

LIGHTGalvanized
0
17

7
45°

DETAIL I 22 DETAIL IV DRAWING SUBTITLE


SKALA 1 : 5 SKALA 1 : 5
800

PAGAR TYPE E & DETAIL


200
75 200

GIP Ø2"

SITE ID SITE NAME


+2.20
Siku 40.40.4 + plat
BO X 257
strip t=3 mm diripet tiap 30 cm
SCALE REVISION
Kawat harmonika NO DATE SIGN
50 x 50
1
2
DETAIL VI DETAIL VIII NO REGISTER
SKALA 1 : 5 SKALA 1 : 5
24
50
+3.00

0
17
2400 2400
Barbed wire Kawat Harmonika
5 lines +
Double Cross Line
GIP Ø2" 50 x 50 NOTES / REMARK

45°
7
22
2
800

GIP Ø2"

+2.20

800
200
ACKNOWLEDGE BY
PT. DAYA MITRA TELEKOMUNIKASI
2000

GIP Ø2" KAWAT HARMONIKA

200
JUHERMAN
PM MCP RO SULMAPUA

75
+2.20 PROJECT NAME

Siku 40.40.4 + plat


A B
strip t=3 mm diripet tiap 30 cm

TYPICAL SIDE VIEW PEMBANGUNAN BTS


SKALA 1 : 100 3 Kawat harmonika
50 x 50
DETAIL 2
SKALA : 20
1 CONTRACTOR
Sand Layer PT. ASA BERKAT BERSAMA
4 4 D12 Gravel Layer

INSIDE CONCRETE PIPA 1"


Pasir +0,20
FOUNDATION WITH WELDED

300
Kerikil
4 D12 ± 0.00
HOLD FASTINGS & D16 L=40mm Ø8-150
50

0.00 PROJECT MANAGER

100
Ø8-150
PIPA 1"

300

100
PIPA 1" Ø10-150

450
DRAWN BY CHECKED BY VERIFIED BY REGIONAL

100
A A

200
100
PLAT STRIP 30x3

SIKU 40.40.4
200
ROOLAG BATA 500
DI BAUT / DI RIPET TIAP 30 cm
550

KAWAT HARMONIKA 50x50 200


4 D12
DATE : DATE : DATE :
POTONGAN A
DRAWING TITLE
DETAIL 3 POTONGAN B SKALA 1 : 50
Ø8-150 SKALA 1 : 50
NTS
Ø10-150
AS BUILT DRAWING
500 500

DRAWING SUBTITLE
200

KAWAT HARMONIKA 50x50


Ø100-150
500

500
DI BAUT / DI RIPET TIAP 30 cm
KOLOM

SIKU 40.40.4
Ø100-150 TAMPAK &POTONGAN PAGAR TYPE E
PLAT STRIP 30x3

KOLOM
500
50

SITE ID SITE NAME

POTONGAN A-A POTONGAN A-A AT CORNER BO X 257


DETAIL 4 SKALA 1 : 50 SKALA 1 : 50 SCALE REVISION
DETAIL 1 NTS
NO DATE SIGN
SKALA : 20
1
2
NO REGISTER
25