Boiler Startup
• Startup and shutdown steps differ 1. Power the burner switch and prove the pilot and main flames.
depending on whether the system is 2. Check to see that the boiler vent and drain between the main stop valve(s) and the non-
hot or cold return valve are open. This is done to bleed any air from the system.
3. If installed, open the equalizing valve around the main steam-stop valves.
• In both conditions, manually test the
safety valve for proper operation
4. Open the main steam-stop valve(s).
5. When the pressure reaches 10 to 15 psig, close the boiler vent.
• In a warm system, when the pressure 6. Test the low-water cutoff by securing the boiler feed and let the boiler steam off naturally to
reaches 10 to 15 psig, close the see if the switch cuts power to the burner at the proper low level. If it does not, break power
boiler vent to the burner immediately and take corrective action. With a positive result, reopen the boiler
feed valve.
7. Open the non-return valve when the steam pressure reaches 75 to 85 percent of the system-
line pressure.
8. Manually test the safety valve for proper operation and reseating.
9. Bring up the boiler pressure slowly during low fire, allowing the non-return valve to
automatically cut the boiler into the live system.
10. Close the drain between the main stop valve(s) and the non-return valve.
11. Verify that all automatic controls are operating properly.
Boiler Shutdown
Next month’s Tip Sheet will detail boiler startup and shutdown procedures in a cold system.