PRIDE GROUP

Industrial Engineering Department


Performance Review Sheet
New Yorker
FBS-131 Floor: FKGL-1
MC Cycle time (sec)
Process name M/C
Qty 1 2 3 4 5 6 7 8 9 10 Min Max Diff

All parts loading Manual 1 16 14 16 14 17 15 14 12 14 16 12 17 5 42%


STS Fold Tack Sleeve Opening (5 tacks)x2
~Double F+Mark Sleeve for fold tack (3 S/N/L/S 79 77 76 81 79 80 83 76 78 82 76 83 7 9%
point) x2 Tack Sleeve Opening (5 tacks)x2
STS Fold
~Double F+Mark Sleeve for fold tack (3 S/N/L/S 82 84 83 85 86 87 84 83 79 81 79 87 8 10%
point) x2 Tack Sleeve Opening (5 tacks)x2
STS Fold
~Double F+Mark Sleeve for fold tack (3 S/N/L/S 5 87 89 86 84 87 91 84 86 83 86 83 91 8 10%
point) x3 Tack Sleeve Opening (5 tacks)x2
STS Fold
~Double F+Mark Sleeve for fold tack (3 S/N/L/S 76 74 72 74 78 76 77 73 79 82 72 82 10 14%
point) x4 Tack Sleeve Opening (5 tacks)x2
STS Fold
~Double F+Mark Sleeve for fold tack (3 S/N/L/S 77 74 79 81 83 78 76 79 82 81 74 83 9 12%
point) x5 1st Shoulder with Shoulder
O/L Attach
O/L 1 16 19 18 15 17 19 16 18 16 19 15 19 4 27%
tape
STS Attach Care Label x3 S/N/L/S 1 17 16 19 15 16 18 15 15 16 17 15 19 4 27%
O/L Piping Neck (Folder)~Flat O/L 1 18 17 19 18 21 17 20 16 15 17 15 21 6 40%
FTLK Piping Back Tape (Coverband)
FTLK(FB) 1 18 19 21 20 22 19 20 21 22 19 18 22 4 22%
+scissoring
STS Close Back Tape (Coverband) with
S/N/L/S 1 19 21 20 20 18 22 21 21 19 22 18 22 4 22%
Fold ends
FTLK(CB
FTLK Top stitch Neck (Front) 1 17 16 18 21 23 19 20 17 22 21 16 23 7 44%
)
STS Attach 2nd Shoulder (Point Tack) S/N/L/S 1 15 14 16 15 14 13 17 14 13 15 13 17 4 31%
O/L Attach 2nd Shoulder after Point Tack
O/L 24%
with Mobilon tape 1 21 23 23 22 24 21 26 24 25 23 21 26 5
Trimming Shoulders Manual #DIV/0!
STS Backtack Neck (Chap Tack) S/N/L/S 28%
1 19 21 18 22 19 23 20 22 18 22 18 23 5
Mark at the center back Manual #DIV/0!
STS Attach Main Label Chap (Fold)
S/N/L/S 1 21 22 20 19 23 24 19 18 17 21 17 24 7 41%
+Trimming
O/L Attach Sleeve O/L 42 38 39 36 41 37 39 42 41 38 36 42 6 17%
2
O/L Attach Sleeve O/L 38 39 44 41 42 39 38 41 44 43 38 44 6 16%
O/L Close Side Seam Short Sleeve O/L 52 55 49 56 55 51 58 49 48 54 48 58 10 21%
O/L Close Side Seam Short Sleeve O/L 3 56 53 54 56 52 58 51 52 54 58 51 58 7 14%
O/L Close Side Seam Short Sleeve O/L 51 56 52 55 54 52 53 59 61 58 51 61 10 20%
STS Backtack Bottom Hem 2 tack(Khara
S/N/L/S 1 21 18 22 19 19 23 18 17 19 21 17 23 6 35%
tack)
STS Backtack Sleeve/Arm hole (4 tacks) S/N/L/S 18 19 21 20 22 19 20 21 22 19 18 22 4 22%
2
STS Backtack Sleeve/Arm hole (4 tacks) S/N/L/S 19 21 20 20 18 22 21 21 19 22 18 22 4 22%
Turnover Body Manual 27%
1 16 19 18 15 17 19 16 18 16 19 15 19 4
Remove Sticker x4 Manual
Total Man 25

300
243
250 223 220
208 202 200 202
200 179 177 186 176 176 180
150
100
50
0
Date: 01/01/2016
Line: J
Avg Cycle Avg Cycle TOTAL
total Pitchtime Capacity CAPACITY Balance
time (sec) time (Min)

148 14.8 14.8 0.25 243 243 243

791 79.1 1.32 46

834 83.4 1.39 43

863 86.3 16.124104 1.44 42 223 223

761 76.1 1.27 47

790 79 1.32 46

173 17.3 17.3 0.29 208 208 208


164 16.4 16.4 0.27 220 220 220
178 17.8 17.8 0.30 202 202 202

201 20.1 20.1 0.34 179 179 179

203 20.3 20.3 0.34 177 177 177

194 19.4 19.4 0.32 186 186 186

146 14.6 14.6 0.24 247 247 200

232 23.2 23.2 0.39 155 155 202

204 20.4 20.4 0.34 176 176 176

204 20.4 20.4 0.34 176 176 176


393 39.3 0.66 92
20.04202 180 180
409 40.9 0.68 88
527 52.7 0.88 68
544 54.4 18.015906 0.91 66 200 200
551 55.1 0.92 65
197 19.7 19.7 0.33 183 183 183
201 20.1 0.34 179
20.2 178 178
203 20.3 0.34 177

173 17.3 17.3 0.29 208 208 208

max 23.20 Min capacity = 176


min 14.60

200 208
183 178