DAY TO DAY ACTIVITY / DAILY REPORT

BUILDING MANAGEMENT - ENGINEERING YAYASAN BUDDHA TZUCHI INDON


Property Management - Engineeri
1 Leader Ary Setiadi
Head Count : 3 orang
2 Technician Agus Sutrisno
Periode : Februari 2017 Sahrel
HVAC TEAM

LOCATION JOB CATEGORY STATUS


REQUESTOR
NO. DATE & DAY JOB ORDER NO. DESCRIPTION
DIVISION Project / Prev. Corr. Work On Bulan
Tower Floor Monitor ing Finish
Improv. Maint. Maint. Order Progess Lalu

1 Rabu,1-02-2017 AC.0217001 Pemasangan Unit outdoor Ac ruang mesin lift otis DA'AI ROOF HVAC √ √
2 AC.0217002 stok opname gudang BM AULA BASEMANT HENDI √ √
3 Kamis,2-02-2017 AC.0217003 Preventive AC Split ruang mesin lift otis 1 DA'AI ROOF HVAC √ √
4 AC.0217004 stok opname gudang BM AULA BASEMANT HENDI √ √
5 Jum'at,3-02-2017 AC.0217005 Preventive unit fcu 1.6 AULA 1 HVAC √ √
6 AC.0217006 Preventive unit fcu 1.7 AULA 1 HVAC √ √
7 AC.0217007 Preventive unit fcu 1.8 AULA 1 HVAC √ √
8 AC.0217008 Preventive unit fcu 1.9 AULA 1 HVAC √ √
9 AC.0217009 Preventive unit fcu 1.10 AULA 1 HVAC √ √
10 AC.0217010 Preventive unit fcu 1.11 AULA 1 HVAC √ √
11 Senin,6-02-2017 AC.0217011 Repair AC mess DA'AI D03 DA'AI BASEMANT HVAC √
Selasa,7-02-2017 AC.0217011 Lanjut Repair AC mess DA'AI D03 DA'AI BASEMANT HVAC √
12 Rabu,8-02-2017 AC.0217012 Preventive unit AHU 5.1 (sisi gan'en) AULA 5 HVAC √ √
13 AC.0217013 Preventive unit AHU 5.2 (sisi da'ai) AULA 5 HVAC √ √
14 AC.0217014 Preventive unit AHU 6.1 (sisi gan'en) AULA 6 HVAC √ √
15 AC.0217015 Preventive unit AHU 6.2 (sisi da'ai) AULA 6 HVAC √ √
16 Kamis,9-02-2017 AC.0217016 Pengecekan dan test running AHU lantai 5 & 6 AULA AULA 5&6 HVAC √ √
17 AC.0217017 Penggantian V-Belt AHU zone A AULA 5 HVAC √ √
18 AC.0217018 Perapihan ruang genset GENSET GENSET UTILITY √ √
19 Jum'at,10-02-2017 AC.0217019 Strainer AHU lantai 5 dan 6 AHU AULA AULA 5&6 HVAC √ √
20 Minggu,12-02-2017 AC.0217020 Monitoring Acara Pemberkahan akhir tahun AULA 4 OPERASIONAL √ √
21 AC.0217021 Pengecekan return AHU aula (supply 22 c dan return 24 c) AULA 4 HVAC √ √
22 Senin,13-02-2017 AC.0217022 Perbaikan drain unit fcu control room (pembuatan drain baru) DA'AI 3 JHON √ √
23 Kamis,16-02-2017 AC.0217023 Pemasangan unit outdoor dan pipa AC di ruang VIP 2 Gan'en GAN'EN 2 JHON √
Jum'at,17-02-2017 AC.0217023 Flushing indoor dan test running unit AC split GAN'EN 2 JHON √
24 Senin,20-02-2017 AC.0217024 Preventive unit fcu ruang kaligrafi (panas) GAN'EN 1 ELTRI √ √
25 Selasa,21-02-2017 AC.0217025 Perbaikan isolasi glasswall rusak unit AHU AULA 2 JHON √ √
A TZUCHI INDONESIA
ement - Engineering

REMARKS
Pending
JOB ORDER CHART YAYASAN BUDDHA TZUCHI INDONESIA
BUILDING MANAGEMENT - ENGINEERING Property Management - Engineering
1 Leader Ary Setiadi
Head Count : 3 orang
2 Technician Agus Sutrisno
Periode : Februari 2017 Amirudin
HVAC TEAM

No CATEGORY JUMLAH STATUS JOB


DATA CATEGORY JOB

1 PREVENTIVE 14
2 CORRECTIVE 11
3 PROJECT 0 PREVENTIVE; 14; 40.00%
SELESAI; 35; 100.00%
4 WORK ORDER 9
5 MONITORING 1 CORRECTIVE; 11; 31.43%
MONITORING; 1; 2.86%
TOTAL 35 WORK ORDER; 9; 25.71%

No STATUS JUMLAH

1 BULAN LALU 0
3 POSTPONE 0
2 SELESAI 35
4 ON PROGRESS 0 DATA JOB BY DIV.
TOTAL 35

No By Div. JUMLAH

1 Elecrical 0
2 Ellectronic 0
3 Mechanical 0
4 HVAC 0
5 Civil 0
6 Utility 0
7 Operational 0
8 Other 0
TOTAL 0
List Peralatan kerja Divisi HVAC
Bulan Februari 2017 DIVISI : HVAC
Kondisi Alat
No Nama Tool Merk Jumlah Satuan
Lengkap Hilang Rusak
1 Vacum AC √ 1 SET
2 Jet Cleaner √ 1 SET
3 Analyzer √ 1 SET
4 Tang Ampere √ 1 SET
5 Plastik Service AC √ 1 PCS
6 Plering √ 1 SET
7 Cutting Pipe Tembaga √ 1 PCS
8 Kanebo √ 1 PCS
9 Gergaji Besi √ 1 PCS
10 Kunci Inggris √ 1 PCS
11 Kunci Ring- Pas √ 1 SET
12 Kunci L √ 1 SET
13 Kunci Pipa √ 1 PCS
C
DIVISI : HVAC

Keterangan

Selang Bocor
Pressure Gauge rusak

Rusak
Tidak lengkap

kunci 12 dan 13 hilang


Look ??