DATA BAHAN MASUK

No. Tanggal Masuk Jenis Bahan Jumlah Satuan Keterangan


1 7/31/2017 Kasau 24 btg
2 7/31/2017 Papan Mal 100 kpg
3 8/1/2017 Kasau 71 btg
4 8/1/2017 Pasir 6 m³
5 8/2/2017 Batu 4 m³
6 8/2/2017 Semen Gresik 70 zak
7 8/2/2017 Wiremesh 8 741.48 kg
8 8/2/2017 Besi Tulangan Ø16 643.824 Kg
9 8/2/2017 Besi Tulangan Ø12 255.744 Kg
10 8/2/2017 Besi Tulangan Ø10 74.04 Kg
11 8/2/2017 triplex 1 kpg
12 8/3/2017 Cerucuk 100 btg
13 8/3/2017 Papan Mal 50 kpg
14 8/13/2017 Pipa PVC 4" 120 btg
15 8/13/2017 Pipa PVC 3" 170 btg
16 8/13/2017 Pipa PVC 2" 440 btg
17 8/13/2017 Pipa PVC 1" 150 btg
18 8/13/2017 Plat Besi 5" 3 kpg
19 8/13/2017 Angkur panjang 1m 4 btg
20 8/13/2017 Pipa Medium Las Flange 12 bh
21 8/13/2017 Bend All Flange 6 bh
22 8/13/2017 Gate Volve 2 bh
23 8/13/2017 Butterfly Velue 5 bh
24 8/13/2017 Tee La SGP 1 bh
25 8/13/2017 Baut u/ Butterfly 5/8 34 bh
26 8/13/2017 Baut u/ Gate 5/8 16 bh
27 8/13/2017 Baut 5/8 40 bh
28 8/17/2017 Papan Mal 40 Kpg
29 8/17/2017 Kasau 20 btg
30.45
Beton lantai dan
60.9 dinding campuran
28.62 37.66 zak
4.16 3.18 Pasir
9.54 4.96 Batu
643.824 12.01974 14.31 Beton lantai lantai
255.744 21.7512 kerja
74.04 0.15 3.16 zak
741.48 0.05 0.94 Pasir
0.43 Batu
74.592
Total Satuan
12.02 Semen 54.84 zak
2.06 Pasir 6.43 m³
Batu 5.39 m³
2.003289
0.256922
DATA ITEM PEKERJAAN BAK AIR PT.HKI
No. JENIS ITEM JUMLAH KELEBIHAN KEKURANGAN
1 Bekisting Sirip Bak 16 pasang - -
2 Pembesian Sirip Bak 8 bh (1 pasang) - -
4 bh (2pasang) - -
3 Cakar Ayam untuk Mal dinding 15 bh - -
4 Cakar Ayam untuk Lantai 54 bh - -
5 Bekisting dinding dalam & Luar 1,5 m = 8 bh - -
3,25 m = 4 bh - -
3,75 m = 3 bh - -
6 Molen 1 bh - -
7 Tong air 1m³ 2 bh - -
8 Pemasangan Pipa 4" 111 btg - -
9 Pemasangan Pipa 3" 170 btg
10 Pemasangan Pipa 2" 233 btg
11 Pemasangan Pipa 1" 18 btg
12
K AIR PT.HKI
DARI PERSENTASE KETERANGAN

Pinjam
Pinjam
120 btg 93% 444
170 btg 100% 680
440 btg 53% 904
150 btg 12% 2028 101.4

120 111
170 170
440 233
150 18
880 532
Total Pemasangan PIPA 60%

234.96 169.44
Total Galian Tanah 72%

Total Galian Anton 2118 m


2129.4
31941000 5323500

348
No. Tanggal Nama Barang Pengeluaran Keterangan
1 8/26/2017 Bumbu masak dan peralatan dapur 100,000
2 8/26/2017 Obat Salep Bakar 50,000
3 8/26/2017 Bensin Motor 50,000
4 8/26/2017 Uang Anton Sihotang 1,500,000
5 8/26/2017 Ayam 90,000 Hutang
6 8/27/2017 Sayur 40,000
7 8/27/2017 Uang Bak yu 1,400,000
8 8/27/2017 Kopi 3kg x 40000 120,000
9 8/27/2017 Gula 5kg x 18000 90,000
10 8/27/2017 Rokok U Bold 1 Slop 115,000 Operator excavator
11 8/27/2017 Cumi 1 kg x 55000 55,000
12 8/27/2017 Bensin Motor 30,000
13 8/28/2017 Gas Elpiji 40,000
14 8/28/2017 Sabun Mama lemon 20,000
15 8/28/2017 Sayuran 48,000
16 8/28/2017 Pentol Bakso 50,000
17 8/28/2017 Ongkos Bayu & Pak teh 100,000
3898000 4000000
102000