Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017

Letda Sujono Intersection Jalan Tol Surveyor : Rahmat


Grid : Jalan Tol - Jalan Padang - Rel
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
BM 0,832 20,832 20,000
0+000 a 2,402 20,832 18,430 As Fly Over Tol
b 1,395 20,832 19,437
0+020 a 2,110 20,832 18,722
b 1,375 20,832 19,457
0+041 a 1,764 20,832 19,068
b 1,340 20,832 19,492
TP1 1,420 1,203 21,049 19,629
L1 a 2,290 21,049 18,759 Simpang Pintu Masuk Tol
b 1,482 21,049 19,567
L2 a 2,515 21,049 18,534
b 1,940 21,049 19,109
L3 a 2,510 21,049 18,539
b 2,140 21,049 18,909
R1 a 3,065 21,049 17,984 Simpang Pintu Masuk Tol
b 1,304 21,049 19,745
0+100 a 2,462 21,049 18,587
b 1,501 21,049 19,548
TP2 2,108 1,475 21,682 19,574
0+150 a 2,645 21,682 19,037
b 1,945 21,682 19,737
0+200 a 2,503 21,682 19,179
b 1,877 21,682 19,805
0+250 a 2,405 21,682 19,277
b 1,795 21,682 19,887
0+300 a 2,185 21,682 19,497
b 1,955 21,682 19,727
TP3 1,725 1,835 21,572 19,847
0+350 a 2,105 21,572 19,467
b 1,595 21,572 19,977
TP4 1,500 1,565 21,507 20,007
0+400 a 1,882 21,507 19,625
b 1,485 21,507 20,022
0+440 a 1,215 21,507 20,292 Simpang Jalan Padang
b 1,165 21,507 20,342
0+450 a 1,918 21,507 19,589
b 1,432 21,507 20,075
0+500 a 1,902 21,507 19,605
b 1,469 21,507 20,038
TP5 1,480 1,275 21,712 20,232
0+550 a 1,938 21,712 19,774
b 1,655 21,712 20,057
0+600 a 1,992 21,712 19,720
b 1,449 21,712 20,263
0+650 a 1,912 21,712 19,800 Simpang Jalan Bersama
b 1,535 21,712 20,177
TP6 1,828 1,340 22,200 20,372
0+700 a 2,630 22,200 19,570
b 1,848 22,200 20,352
0+750 a 2,120 22,200 20,080
b 1,754 22,200 20,446
0+800 a 2,210 22,200 19,990
b 1,780 22,200 20,420
0+850 a 1,950 22,200 20,250
b 1,665 22,200 20,535
TP7 1,473 1,412 22,261 20,788
0+900 a 1,938 22,261 20,323
b 1,676 22,261 20,585
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Jalan Padang - Rel
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
L1 a 1,880 22,261 20,381 Simpang Jalan Pertiwi
b 1,556 22,261 20,705
R1 a 2,310 22,261 19,951
b 1,655 22,261 20,606
0+950 a 1,805 22,261 20,456
b 1,342 22,261 20,919
1+000 a 1,612 22,261 20,649
b 1,475 22,261 20,786
TP8 1,774 1,210 22,825 21,051
L1 a 2,092 22,825 20,733 Simpang Jalan Tirto Sari
b 1,824 22,825 21,001
R1 a 2,382 22,825 20,443
b 1,754 22,825 21,071
1+020 a 2,048 22,825 20,777
b 1,988 22,825 20,837
1+050 a 2,322 22,825 20,503
b 1,782 22,825 21,043
1+100 a 1,682 22,825 21,143
b 1,540 22,825 21,285
TP9 2,270 0,852 24,243 21,973
1+132 a 3,488 24,243 20,755 Intersection Rel
b 2,958 24,243 21,285
c 1,952 24,243 22,291
1+150 a 3,044 24,243 21,199
b 2,852 24,243 21,391
c 1,915 24,243 22,328
1+200 a 3,550 24,243 20,693
b 3,095 24,243 21,148
c 2,115 24,243 22,128
TP10 1,968 2,100 24,111 22,143
1+250 a 3,622 24,111 20,489
b 3,082 24,111 21,029
c 1,913 24,111 22,198
1+314 a 4,708 24,111 19,403
b 4,262 24,111 19,849
1+350 a 4,252 24,111 19,859
b 3,592 24,111 20,519
1+400 a 4,002 24,111 20,109
b 3,012 24,111 21,099
TP11 2,122 2,058 24,175 22,053
1+450 a 4,202 24,175 19,973
b 3,544 24,175 20,631
1+500 a 4,012 24,175 20,163
b 3,598 24,175 20,577
1+550 a 4,068 24,175 20,107
b 3,516 24,175 20,659
1+600 a 4,012 24,175 20,163
b 3,558 24,175 20,617
1+650 a 4,280 24,175 19,895
b 3,715 24,175 20,460
TP12 1,402 1,918 23,659 22,257
1+700 a 3,386 23,659 20,273
b 2,818 23,659 20,841
1+750 a 3,652 23,659 20,007
b 3,042 23,659 20,617
1+800 a 3,614 23,659 20,045
b 3,058 23,659 20,601
1+848 a 3,930 23,659 19,729 Ujung Saluran Terbuka
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Jalan Padang - Rel
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
b 3,430 23,659 20,229
TP13 0,738 1,420 22,977 22,239
L1 a 4,028 22,977 18,949
b 3,296 22,977 19,681
1+900 b 3,138 22,977 19,839 Awal Saluran Tertutup
TP14 1,238 3,138 21,077 19,839
1+950 b 1,378 21,077 19,699
2+000 b 1,518 21,077 19,559
2+050 b 1,784 21,077 19,293
2+100 b 1,822 21,077 19,255
TP15 1,522 1,822 20,777 19,255
2+150 b 1,526 20,777 19,251
2+200 b 1,546 20,777 19,231
2+250 b 1,648 20,777 19,129
2+300 b 1,622 20,777 19,155
TP16 b 1,534 1,622 20,689 19,155
2+350 b 1,448 20,689 19,241
2+400 b 1,562 20,689 19,127
2+450 b 1,548 20,689 19,141
2+500 b 1,520 20,689 19,169
TP17 1,492 1,520 20,661 19,169
R1 a 3,082 20,661 17,579 Saluran sebelum Titi
b 1,630 20,661 19,031
R2 a 4,280 20,661 16,381 Saluran sesudah Titi
b 0,712 20,661 19,949
L1 2+550 a 2,188 20,661 18,473
b 1,090 20,661 19,571
TP18 1,397 0,220 21,838 20,441
TP19 1,332 4,297 18,873 17,541
2+580 a 2,686 18,873 16,187 Ujung Saluran Tepi Sungai
b 1,092 18,873 17,781
1 3,804 18,873 15,069 Tepi dasar sungai
2+630 2 4,480 18,873 14,393 As Dasar sungai
3 18,873 0,000
4 1,318 18,873 17,555 Tepi atas sungai
5 3,435 18,873 15,438 Muka air sungai

Diukur : Dihitung : Disetujui :

(……………………...…...……..) (……………………...…...……..) (……………………...…...……..)


Elevasi Deviasi
Stationing Jarak Kumulatif Kemiringa
Dasar (m)
n
0+000 20.00 20.00 18,430 ### As Fly Over Tol 0.0146
0+020 21.00 41.00 18,722 ### - 0.29 0.0165
0+041 59.00 100.00 19,068 ### - 0.35 (0.0082)
0+100 50.00 150.00 18,587 ### - (0.48) 0.0090
0+150 50.00 200.00 19,037 ### - 0.45 0.0028
0+200 50.00 250.00 19,179 ### - 0.14 0.0020
0+250 50.00 300.00 19,277 ### - 0.10 0.0044
0+300 50.00 350.00 19,497 ### - 0.22 (0.0006)
0+350 50.00 400.00 19,467 ### - (0.03) 0.0032
0+400 50.00 450.00 19,625 ### - 0.16 (0.0007)
0+450 50.00 500.00 19,589 ### - (0.04) 0.0003
0+500 50.00 550.00 19,605 ### - 0.02 0.0034
0+550 50.00 600.00 19,774 ### - 0.17 (0.0011)
0+600 50.00 650.00 19,720 ### - (0.05) 0.0016
0+650 50.00 700.00 19,800 ### Simpang Jalan Bersama 0.08 (0.0046)
0+700 50.00 750.00 19,570 ### - (0.23) 0.0102
0+750 50.00 800.00 20,080 ### - 0.51 (0.0018)
0+800 50.00 850.00 19,990 ### - (0.09) 0.0052
0+850 50.00 900.00 20,250 ### - 0.26 0.0015
0+900 50.00 950.00 20,323 ### - 0.07 0.0027
0+950 50.00 1,000.00 20,456 ### - 0.13 0.0039
1+000 20.00 1,020.00 20,649 ### - 0.19 0.0064
1+020 30.00 1,050.00 20,777 ### - 0.13 (0.0091)
1+050 50.00 1,100.00 20,503 ### - (0.27) 0.0128
1+100 32.00 1,132.00 21,143 ### - 0.64 (0.0121)
1+132 18.00 1,150.00 20,755 ### Intersection Rel (0.39) 0.0247
1+150 50.00 1,200.00 21,199 ### - 0.44 (0.0101)
1+200 50.00 1,250.00 20,693 ### - (0.51) (0.0041)
1+250 64.00 1,314.00 20,489 ### - (0.20) (0.0170)
1+314 36.00 1,350.00 19,403 ### - (1.09) 0.0127
1+350 50.00 1,400.00 19,859 ### - 0.46 0.0050
1+400 50.00 1,450.00 20,109 ### - 0.25 (0.0027)
1+450 50.00 1,500.00 19,973 ### - (0.14) 0.0038
1+500 50.00 1,550.00 20,163 ### - 0.19 (0.0011)
1+550 50.00 1,600.00 20,107 ### - (0.06) 0.0011
1+600 50.00 1,650.00 20,163 ### - 0.06 (0.0054)
1+650 50.00 1,700.00 19,895 ### - (0.27) 0.0076
1+700 50.00 1,750.00 20,273 ### - 0.38 (0.0053)
1+750 50.00 1,800.00 20,007 ### - (0.27) 0.0008
1+800 48.00 1,848.00 20,045 ### - 0.04 (0.0066)
1+848 52.00 1,900.00 19,729 ### Ujung Saluran Terbuka (0.32) 0.0021
1+900 50.00 1,950.00 19,839 ### Awal Saluran Tertutup 0.11 (0.0028)
1+950 50.00 2,000.00 19,699 ### - (0.14) (0.0028)
2+000 50.00 2,050.00 19,559 ### - (0.14) (0.0053)
2+050 50.00 2,100.00 19,293 ### - (0.27) (0.0008)
2+100 50.00 2,150.00 19,255 ### - (0.04) (0.0001)
2+150 50.00 2,200.00 19,251 ### - (0.00) (0.0004)
2+200 50.00 2,250.00 19,231 ### - (0.02) (0.0020)
2+250 50.00 2,300.00 19,129 ### - (0.10) 0.0005
2+300 50.00 2,350.00 19,155 ### - 0.03 0.0017
2+350 50.00 2,400.00 19,241 ### - 0.09 (0.0023)
2+400 50.00 2,450.00 19,127 ### - (0.11) 0.0003
2+450 50.00 2,500.00 19,141 ### - 0.01 0.0006
2+500 50.00 2,550.00 19,169 ### - 0.03 (0.0139)
2+550 30.00 2,580.00 18,473 ### - (0.70) (0.0762)
2+580 50.00 2,630.00 16,187 ### Ujung Saluran Tepi Sungai (2.29) (0.0359)
2+630 50.00 2,680.00 14,393 ### As Dasar sungai (1.79) (0.2879)
2+680
naik
naik
turun
naik
naik
naik
naik
turun
naik
turun
naik
naik
turun
naik
turun
naik
turun
naik
naik
naik
naik
naik
turun
naik
turun
naik
turun
turun
turun
naik
naik
turun
naik
turun
naik
turun
naik
turun
naik
turun
naik
turun
turun
turun
turun
turun
turun
turun
naik
naik
turun
naik
naik
turun
turun
turun
turun
14,000
15,000
16,000
17,000
18,000
19,000
20,000
21,000
22,000

0+000
0+020
0+041
0+100 Simpang jalan tol

0+150
0+200
0+250
0+300
0+350
0+400
0+450
Simp. jalan padang
0+500
0+550
0+600
0+650 Simp. jalan bersama
0+700
0+750
0+800
0+850
0+900 Simp. jalan pertiwi
0+950
1+000
1+020
1+050
1+100
1+132 Intersection Rel
1+150
JALAN TOL - JALAN P
LO
0+950
1+000
1+020
1+050
1+100
1+132 Intersection Rel
1+150
1+200
1+250
1+314

LONG SECTION
1+350
1+400
1+450
1+500

JALAN TOL - JALAN PADANG - REL - SUNGAI PERCUT


1+550
1+600
1+650
1+700
1+750
1+800
1+848
1+900
1+950
Awal Sal. tertutup
2+000
2+050
2+100
2+150
2+200
2+250
2+300
2+350
2+400
2+150
2+200
2+250
2+300
2+350
2+400
2+450
2+500 Ujung Sal. tertutup

2+550
2+580
2+630 Dasar Sungai
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Sungai Percut
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
BM 0,832 20,832 20,000
0+000 a 2,402 20,832 18,430 As Fly Over Tol
b 1,395 20,832 19,437
0+020 a 2,110 20,832 18,722
b 1,375 20,832 19,457
0+041 a 1,764 20,832 19,068
b 1,340 20,832 19,492
TP1 1,420 1,203 21,049 19,629
L1 a 2,290 21,049 18,759 Simpang Pintu Masuk Tol
b 1,482 21,049 19,567
L2 a 2,515 21,049 18,534
b 1,940 21,049 19,109
L3 a 2,510 21,049 18,539
b 2,140 21,049 18,909
R1 a 3,065 21,049 17,984 Simpang Pintu Masuk Tol
b 1,304 21,049 19,745
0+100 a 2,462 21,049 18,587
b 1,501 21,049 19,548
TP2 2,108 1,475 21,682 19,574
0+150 a 2,645 21,682 19,037
b 1,945 21,682 19,737
0+200 a 2,503 21,682 19,179
b 1,877 21,682 19,805
0+250 a 2,405 21,682 19,277
b 1,795 21,682 19,887
0+300 a 2,185 21,682 19,497
b 1,955 21,682 19,727
TP3 1,725 1,835 21,572 19,847
0+350 a 2,105 21,572 19,467
b 1,595 21,572 19,977
TP4 1,925 1,565 21,932 20,007 Simpang Jalan Padang
0+450 a 2,360 21,932 19,572
b 1,725 21,932 20,207
L1 a 2,782 21,932 19,150
b 2,128 21,932 19,804
L2 a 2,845 21,932 19,087 Simpang TVRI
b 2,282 21,932 19,650
R2 a 2,764 21,932 19,168
b 2,502 21,932 19,430
R1 a 2,730 21,932 19,202 Simpang TVRI
b 2,247 21,932 19,685
0+500 a 2,782 21,932 19,150
b 2,414 21,932 19,518
0+550 a 2,725 21,932 19,207
b 2,295 21,932 19,637
TP5 1,348 2,024 21,256 19,908
0+600 a 2,070 21,256 19,186
b 1,674 21,256 19,582
0+650 a 2,308 21,256 18,948
b 2,002 21,256 19,254
0+700 a 2,422 21,256 18,834
b 2,055 21,256 19,201
TP6 1,630 1,560 21,326 19,696
0+750 a 2,532 21,326 18,794
b 2,080 21,326 19,246
0+800 a 2,435 21,326 18,891
b 2,007 21,326 19,319
0+850 a 2,640 21,326 18,686
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Sungai Percut
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
b 2,238 21,326 19,088
TP7 1,510 1,675 21,161 19,651
0+900 a 2,360 21,161 18,801
b 1,785 21,161 19,376
0+950 a 2,605 21,161 18,556
b 1,945 21,161 19,216
1+000 a 2,364 21,161 18,797
b 1,908 21,161 19,253
1+050 a 2,350 21,161 18,811
b 1,480 21,161 19,681
1+100 a 2,240 21,161 18,921
b 1,790 21,161 19,371
TP8 1,550 1,295 21,416 19,866
1+150 a 2,525 21,416 18,891
b 1,920 21,416 19,496
1+200 a 2,792 21,416 18,624
b 1,975 21,416 19,441
1+250 a 2,675 21,416 18,741
b 2,087 21,416 19,329
1+300 a 2,786 21,416 18,630
b 1,986 21,416 19,430
TP9 1,155 1,805 20,766 19,611
1+350 a 2,190 20,766 18,576
b 1,585 20,766 19,181
1+400 a 2,420 20,766 18,346
b 1,638 20,766 19,128
1+450 a 2,485 20,766 18,281
b 1,920 20,766 18,846
1+500 a 2,595 20,766 18,171
b 1,850 20,766 18,916
TP10 1,665 1,607 20,824 19,159
1+550 a 2,575 20,824 18,249
b 1,974 20,824 18,850
1+600 a 2,734 20,824 18,090
b 2,084 20,824 18,740
1+650 a 2,902 20,824 17,922
b 2,134 20,824 18,690
TP11 1,592 1,662 20,754 19,162
1+650 a 2,825 20,754 17,929
b 2,060 20,754 18,694
1+700 a 2,998 20,754 17,756
b 1,708 20,754 19,046
1+750 a 2,990 20,754 17,764
b 1,845 20,754 18,909
1+783 a 3,200 20,754 17,554 Simpang Jalan Bantaran Sungai
b 1,632 20,754 19,122
TP12 2,304 0,728 22,330 20,026
TP13 2,745 4,078 20,997 18,252
R1 a 3,735 20,997 17,262 Ujung Saluran sebelum sungai
b 2,224 20,997 18,773
L1 1+808 a 3,718 20,997 17,279 Dasar Sungai Titi Sewa
b 2,993 20,997 18,004
c 3,605 20,997 17,392
L2 a 3,692 20,997 17,305
b 3,078 20,997 17,919
X1 a 2,936 20,997 18,061 Ujung Saluran sesudah sungai
b 2,022 20,997 18,975
1+850 a 2,732 20,997 18,265
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Sungai Percut
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
b 1,928 20,997 19,069
TP14 1,552 1,448 21,101 19,549
1+900 a 2,900 21,101 18,201
b 2,122 21,101 18,979
1+950 a 2,763 21,101 18,338
b 1,991 21,101 19,110
2+000 a 2,270 21,101 18,831
b 1,563 21,101 19,538
TP15 1,025 1,405 20,721 19,696
2+050 a 2,055 20,721 18,666
b 1,438 20,721 19,283
2+100 a 2,170 20,721 18,551
b 1,675 20,721 19,046
2+150 a 2,022 20,721 18,699 Akhir saluran yang ada
b 1,747 20,721 18,974
2+200 a 1,972 20,721 18,749
b 1,413 20,721 19,308
2+225 a 1,180 20,721 19,541 Sebelum Masjid
b 20,721 0,000
TP17 2,392 0,614 22,499 20,107
TP18 0,072 0,568 22,003 21,931
TP19 1,558 3,314 20,247 18,689
TP20 1,382 4,066 17,563 16,181
2+250 a 1,766 17,563 15,797 Tepi atas sungai
b 3,568 17,563 13,995 Tinggi muka air
2+300 c 4,782 17,563 12,781 Dasar Sungai Percut
d 2,098 17,563 15,465 Tepi atas sungai

Diukur : Dihitung : Disetujui :

(……………………...…...……..) (……………………...…...……..) (……………………...…...……..)


Elevasi Deviasi
Stationing Jarak Kumulatif Kemiringa
Dasar (m)
n
0+000 20.00 20.00 18,430 ### As Fly Over Tol 0.014600
0+020 21.00 41.00 18,722 ### - 0.29 0.016476
0+041 59.00 100.00 19,068 ### - 0.35 (0.008153)
0+100 50.00 150.00 18,587 ### - (0.48) 0.009000
0+150 50.00 200.00 19,037 ### - 0.45 0.002840
0+200 50.00 250.00 19,179 ### - 0.14 0.001960
0+250 50.00 300.00 19,277 ### - 0.10 0.004400
0+300 50.00 350.00 19,497 ### - 0.22 (0.000600)
0+350 50.00 400.00 19,467 ### - (0.03) 0.003160
0+400 50.00 450.00 19,625 ### - 0.16 (0.001060)
0+450 50.00 500.00 19,572 ### - (0.05) (0.008440)
0+500 50.00 550.00 19,150 ### - (0.42) 0.001140
0+550 50.00 600.00 19,207 ### - 0.06 (0.000420)
0+600 50.00 650.00 19,186 ### - (0.02) (0.004760)
0+650 50.00 700.00 18,948 ### - (0.24) (0.002280)
0+700 50.00 750.00 18,834 ### - (0.11) (0.000800)
0+750 50.00 800.00 18,794 ### - (0.04) 0.001940
0+800 50.00 850.00 18,891 ### - 0.10 (0.004100)
0+850 50.00 900.00 18,686 ### - (0.21) 0.002300
0+900 50.00 950.00 18,801 ### - 0.12 (0.004900)
0+950 50.00 1,000.00 18,556 ### - (0.25) 0.004820
1+000 50.00 1,050.00 18,797 ### - 0.24 0.000280
1+050 50.00 1,100.00 18,811 ### - 0.01 0.002200
1+100 50.00 1,150.00 18,921 ### - 0.11 (0.000600)
1+150 50.00 1,200.00 18,891 ### - (0.03) (0.005340)
1+200 50.00 1,250.00 18,624 ### - (0.27) 0.002340
1+250 50.00 1,300.00 18,741 ### - 0.12 (0.002220)
1+300 50.00 1,350.00 18,630 ### - (0.11) (0.001080)
1+350 50.00 1,400.00 18,576 ### - (0.05) (0.004600)
1+400 50.00 1,450.00 18,346 ### - (0.23) (0.001300)
1+450 50.00 1,500.00 18,281 ### - (0.07) (0.002200)
1+500 50.00 1,550.00 18,171 ### - (0.11) 0.001560
1+550 50.00 1,600.00 18,249 ### - 0.08 (0.003180)
1+600 50.00 1,650.00 18,090 ### - (0.16) (0.003360)
1+650 50.00 1,700.00 17,922 ### - (0.17) (0.003320)
1+700 50.00 1,750.00 17,756 ### - (0.17) 0.000160
1+750 50.00 1,800.00 17,764 ### - 0.01 (0.004200)
1+800 8.00 1,808.00 17,554 ### Simpang Jalan Bantaran Sunga (0.21) (0.034375)
1+808 42.00 1,850.00 17,279 ### Dasar Sungai Titi Sewa (0.28) 0.023476
1+850 50.00 1,900.00 18,265 ### - 0.99 (0.001280)
1+900 50.00 1,950.00 18,201 ### - (0.06) 0.002740
1+950 50.00 2,000.00 18,338 ### - 0.14 0.009860
2+000 50.00 2,050.00 18,831 ### - 0.49 (0.003300)
2+050 50.00 2,100.00 18,666 ### - (0.17) (0.002300)
2+100 50.00 2,150.00 18,551 ### - (0.12) 0.002960
2+150 50.00 2,200.00 18,699 ### Akhir saluran yang ada 0.15 0.001000
2+200 25.00 2,225.00 18,749 ### - 0.05 0.031680
2+225 25.00 2,250.00 19,541 ### Sebelum Masjid 0.79 (0.270400)
2+250 50.00 2,300.00 15,797 ### Tepi atas sungai (3.74) (0.315940)
2+300 50.00 2,350.00 12,781 ### Dasar Sungai Percut (3.02) (0.255620)
2+350
naik
naik
turun
naik
naik
naik
naik
turun
naik
turun
turun
naik
turun
turun
turun
turun
naik
turun
naik
turun
naik
naik
naik
turun
turun
naik
turun
turun
turun
turun
turun
naik
turun
turun
turun
naik
turun
turun
naik
turun
naik
naik
turun
turun
naik
naik
naik
turun
turun
turun
12,000
13,000
14,000
15,000
16,000
17,000
18,000
19,000
20,000
21,000

0+000

0+020

0+041
Simpang jalan tol
0+100

0+150

0+200

0+250

0+300

0+350

0+400

0+450

0+500 Simp. jalan TVRI

0+550

0+600

0+650

0+700

0+750

0+800

0+850

0+900

0+950

1+000

1+050

1+100
JALAN TOL - SUNGA
LO
0+850

0+900

0+950

1+000

1+050

1+100

1+150

1+200

LONG SECTION
1+250

1+300

1+350

1+400

JALAN TOL - SUNGAI TITI SEWA - SUNGAI PERCUT


1+450

1+500

1+550

1+600

1+650

1+700

1+750

1+800

1+808
Sungai titi sewa

1+850

1+900

1+950

2+000

2+050

2+100
Akhir Sal yg ada
2+150
1+900

1+950

2+000

2+050

2+100
Akhir Sal yg ada
2+150

2+200

2+225

2+250

2+300 Dasar Sungai


Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Titi Sewa - Perumahan
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
BM 0,832 20,832 20,000
0+000 a 2,402 20,832 18,430 As Fly Over Tol
b 1,395 20,832 19,437
0+020 a 2,110 20,832 18,722
b 1,375 20,832 19,457
0+041 a 1,764 20,832 19,068
b 1,340 20,832 19,492
TP1 1,420 1,203 21,049 19,629
L1 a 2,290 21,049 18,759 Simpang Pintu Masuk Tol
b 1,482 21,049 19,567
L2 a 2,515 21,049 18,534
b 1,940 21,049 19,109
L3 a 2,510 21,049 18,539
b 2,140 21,049 18,909
R1 a 3,065 21,049 17,984 Simpang Pintu Masuk Tol
b 1,304 21,049 19,745
0+100 a 2,462 21,049 18,587
b 1,501 21,049 19,548
TP2 2,108 1,475 21,682 19,574
0+150 a 2,645 21,682 19,037
b 1,945 21,682 19,737
0+200 a 2,503 21,682 19,179
b 1,877 21,682 19,805
0+250 a 2,405 21,682 19,277
b 1,795 21,682 19,887
0+300 a 2,185 21,682 19,497
b 1,955 21,682 19,727
TP3 1,725 1,835 21,572 19,847
0+350 a 2,105 21,572 19,467
b 1,595 21,572 19,977
TP4 1,925 1,565 21,932 20,007 Simpang Jalan Padang
0+450 a 2,360 21,932 19,572
b 1,725 21,932 20,207
L1 a 2,782 21,932 19,150
b 2,128 21,932 19,804
L2 a 2,845 21,932 19,087 Simpang TVRI
b 2,282 21,932 19,650
R2 a 2,764 21,932 19,168
b 2,502 21,932 19,430
R1 a 2,730 21,932 19,202 Simpang TVRI
b 2,247 21,932 19,685
0+500 a 2,782 21,932 19,150
b 2,414 21,932 19,518
0+550 a 2,725 21,932 19,207
b 2,295 21,932 19,637
TP5 1,348 2,024 21,256 19,908
0+600 a 2,070 21,256 19,186
b 1,674 21,256 19,582
0+650 a 2,308 21,256 18,948
b 2,002 21,256 19,254
0+700 a 2,422 21,256 18,834
b 2,055 21,256 19,201
TP6 1,630 1,560 21,326 19,696
0+750 a 2,532 21,326 18,794
b 2,080 21,326 19,246
0+800 a 2,435 21,326 18,891
b 2,007 21,326 19,319
0+850 a 2,640 21,326 18,686
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Titi Sewa - Perumahan
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
b 2,238 21,326 19,088
TP7 1,510 1,675 21,161 19,651
0+900 a 2,360 21,161 18,801
b 1,785 21,161 19,376
0+950 a 2,605 21,161 18,556
b 1,945 21,161 19,216
1+000 a 2,364 21,161 18,797
b 1,908 21,161 19,253
1+050 a 2,350 21,161 18,811
b 1,480 21,161 19,681
1+100 a 2,240 21,161 18,921
b 1,790 21,161 19,371
TP8 1,550 1,295 21,416 19,866
1+150 a 2,525 21,416 18,891
b 1,920 21,416 19,496
1+200 a 2,792 21,416 18,624
b 1,975 21,416 19,441
1+250 a 2,675 21,416 18,741
b 2,087 21,416 19,329
1+300 a 21,416 0,000
b 21,416 0,000
TP9 1,155 1,805 20,766 19,611
1+350 a 2,190 20,766 18,576
b 1,585 20,766 19,181
1+400 a 2,420 20,766 18,346
b 1,638 20,766 19,128
1+450 a 2,485 20,766 18,281
b 1,920 20,766 18,846
1+500 a 2,595 20,766 18,171
b 1,850 20,766 18,916
TP10 1,665 1,607 20,824 19,159
1+550 a 2,575 20,824 18,249
b 1,974 20,824 18,850
1+600 a 2,734 20,824 18,090
b 2,084 20,824 18,740
1+650 a 2,902 20,824 17,922
b 2,134 20,824 18,690
TP11 1,592 1,662 20,754 19,162
1+650 a 2,825 20,754 17,929
b 2,060 20,754 18,694
1+700 a 2,998 20,754 17,756
b 1,708 20,754 19,046
1+750 a 2,990 20,754 17,764
b 1,845 20,754 18,909
1+783 a 3,200 20,754 17,554 Simpang Jalan Bantaran Sungai
b 1,632 20,754 19,122
TP12 0,468 0,728 20,494 20,026 Simpang Titi Sewa
TP13 1,298 1,822 19,970 18,672
1+800 a 3,002 19,970 16,968
b 2,414 19,970 17,556
TP14 1,324 1,664 19,630 18,306
TP15 1,378 1,396 19,612 18,234
2+200 a 3,354 19,612 16,258
b 2,264 19,612 17,348
TP16 1,412 1,898 19,126 17,714
2+400 a 3,288 19,126 15,838
b 2,312 19,126 16,814
TP17 1,302 1,372 19,056 17,754
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Titi Sewa - Perumahan
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
TP18 1,756 1,912 18,900 17,144
3+100 a 4,148 18,900 14,752 Ujung Saluran
b 2,336 18,900 16,564

Diukur : Dihitung : Disetujui :

(……………………...…...……..) (……………………...…...……..) (……………………...…...……..)


Elevasi Deviasi
Stationing Jarak Kumulatif Kemiringa
Dasar (cm)
n
0+000 20.00 20.00 18,430 ### As Fly Over Tol 0.014600
0+020 21.00 41.00 18,722 ### - 0.29 0.016476
0+041 59.00 100.00 19,068 ### - 0.35 (0.008153)
0+100 50.00 150.00 18,587 ### - (0.48) 0.009000
0+150 50.00 200.00 19,037 ### - 0.45 0.002840
0+200 50.00 250.00 19,179 ### - 0.14 0.001960
0+250 50.00 300.00 19,277 ### - 0.10 0.004400
0+300 50.00 350.00 19,497 ### - 0.22 (0.000600)
0+350 50.00 400.00 19,467 ### - (0.03) 0.003160
0+400 50.00 450.00 19,625 ### - 0.16 (0.001060)
0+450 50.00 500.00 19,572 ### - (0.05) (0.008440)
0+500 50.00 550.00 19,150 ### - (0.42) 0.001140
0+550 50.00 600.00 19,207 ### - 0.06 (0.000420)
0+600 50.00 650.00 19,186 ### - (0.02) (0.004760)
0+650 50.00 700.00 18,948 ### - (0.24) (0.002280)
0+700 50.00 750.00 18,834 ### - (0.11) (0.000800)
0+750 50.00 800.00 18,794 ### - (0.04) 0.001940
0+800 50.00 850.00 18,891 ### - 0.10 (0.004100)
0+850 50.00 900.00 18,686 ### - (0.21) 0.002300
0+900 50.00 950.00 18,801 ### - 0.12 (0.004900)
0+950 50.00 1,000.00 18,556 ### - (0.25) 0.004820
1+000 50.00 1,050.00 18,797 ### - 0.24 0.000280
1+050 50.00 1,100.00 18,811 ### - 0.01 0.002200
1+100 50.00 1,150.00 18,921 ### - 0.11 (0.000600)
1+150 50.00 1,200.00 18,891 ### - (0.03) (0.005340)
1+200 50.00 1,250.00 18,624 ### - (0.27) 0.002340
1+250 50.00 1,300.00 18,741 ### - 0.12 (0.002220)
1+300 50.00 1,350.00 18,630 ### - (0.11) (0.001080)
1+350 50.00 1,400.00 18,576 ### - (0.05) (0.004600)
1+400 50.00 1,450.00 18,346 ### - (0.23) (0.001300)
1+450 50.00 1,500.00 18,281 ### - (0.07) (0.002200)
1+500 50.00 1,550.00 18,171 ### - (0.11) 0.001560
1+550 50.00 1,600.00 18,249 ### - 0.08 (0.003180)
1+600 50.00 1,650.00 18,090 ### - (0.16) (0.003360)
1+650 50.00 1,700.00 17,922 ### - (0.17) (0.003320)
1+700 50.00 1,750.00 17,756 ### - (0.17) 0.000160
1+750 33.00 1,783.00 17,764 ### - 0.01 (0.006364)
1+783 50.00 1,833.00 17,554 ### Simpang Jalan Bantaran Sunga (0.21) (0.011720)
1+800 50.00 1,883.00 16,968 ### - (0.59) (0.014200)
2+200 200.00 2,083.00 16,258 ### - (0.71) (0.002100)
2+400 700.00 2,783.00 15,838 ### - (0.42) (0.001551)
3+100 100.00 2,883.00 14,752 ### Ujung Saluran (1.09) (0.147520)
3+200
naik
naik
turun
naik
naik
naik
naik
turun
naik
turun
turun
naik
turun
turun
turun
turun
naik
turun
naik
turun
naik
naik
naik
turun
turun
naik
turun
turun
turun
turun
turun
naik
turun
turun
turun
naik
turun
turun
turun
turun
turun
turun
14,000
15,000
16,000
17,000
18,000
19,000
20,000

0+000

0+020

0+041
Simpang jalan tol
0+100

0+150

0+200

0+250

0+300

0+350

0+400

0+450

0+500 Simp. jalan TVRI

0+550

0+600

0+650

0+700

0+750

0+800

0+850

0+900
LO
JALAN TOL - SUNG
0+700

0+750

0+800

0+850

0+900

0+950

1+000

LONG SECTION
1+050

1+100

1+150

JALAN TOL - SUNGAI TITI SEWA - PERUMAHAN


1+200

1+250

1+300

1+350

1+400

1+450

1+500

1+550

1+600

1+650

1+700

1+750

1+783
1+650

1+700

1+750

1+783
Sungai titi sewa
1+800

2+200

2+400
Ujung Saluran
3+100
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Sei Kera
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
BM 1,358 21,358 20,000
0+000 a 2,932 21,358 18,426 As Fly Over Tol
b 1,924 21,358 19,434
0+050 a 2,236 21,358 19,122
b 1,472 21,358 19,886
R1 a 2,034 21,358 19,324 Simpang Pintu Masuk Tol
b 1,630 21,358 19,728
R2 a 2,288 21,358 19,070
b 1,538 21,358 19,820
L1 a 2,572 21,358 18,786 Simpang Pintu Masuk Tol
b 2,012 21,358 19,346
L2 a 2,358 21,358 19,000
b 2,082 21,358 19,276
TP1 1,942 1,184 22,116 20,174
0+100 a 3,198 22,116 18,918
b 2,530 22,116 19,586
0+150 a 2,594 22,116 19,522
b 2,178 22,116 19,938
0+200 a 2,468 22,116 19,648
b 2,148 22,116 19,968
TP2 1,900 1,952 22,064 20,164
0+250 a 2,602 22,064 19,462
b 2,125 22,064 19,939
0+300 a 2,756 22,064 19,308
b 1,817 22,064 20,247
0+350 a 2,445 22,064 19,619
b 1,847 22,064 20,217
TP3 1,710 1,687 22,087 20,377
0+400 a 2,725 22,087 19,362
b 1,845 22,087 20,242
0+450 a 2,415 22,087 19,672
b 1,872 22,087 20,215
TP4 1,650 1,567 22,170 20,520
0+500 a 2,305 22,170 19,865
b 1,835 22,170 20,335
0+550 a 2,503 22,170 19,667
b 1,860 22,170 20,310
0+600 a 2,210 22,170 19,960
b 1,792 22,170 20,378
0+650 a 1,805 22,170 20,365
b 1,595 22,170 20,575
0+700 a 2,050 22,170 20,120
b 1,334 22,170 20,836
TP5 1,400 0,885 22,685 21,285
0+750 a 2,530 22,685 20,155
b 2,032 22,685 20,653
0+800 a 3,205 22,685 19,480
b 2,055 22,685 20,630
0+850 a 2,057 22,685 20,628
b 1,855 22,685 20,830
TP6 1,100 1,248 22,537 21,437
0+900 a 2,055 22,537 20,482
b 1,675 22,537 20,862
0+950 a 2,118 22,537 20,419
b 1,770 22,537 20,767
1+000 a 2,148 22,537 20,389
b 1,973 22,537 20,564
1+050 a 2,325 22,537 20,212
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Sei Kera
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
b 1,792 22,537 20,745
1+100 a 2,475 22,537 20,062
b 1,856 22,537 20,681
TP7 0,925 1,085 22,377 21,452
1+150 a 2,220 22,377 20,157
b 1,790 22,377 20,587
1+200 a 2,067 22,377 20,310
b 1,928 22,377 20,449
1+250 a 2,490 22,377 19,887
b 1,890 22,377 20,487
1+300 a 2,045 22,377 20,332
b 1,722 22,377 20,655
TP8 1,466 1,208 22,635 21,169
1+350 a 2,384 22,635 20,251
b 1,922 22,635 20,713
1+400 a 2,682 22,635 19,953
b 1,988 22,635 20,647
1+450 a 2,426 22,635 20,209 Simpang Selamat Ketaren
b 1,924 22,635 20,711
TP9 1,624 1,658 22,601 20,977
L1 a 2,856 22,601 19,745
b 1,842 22,601 20,759
1+500 a 2,598 22,601 20,003
b 1,832 22,601 20,769
1+550 a 2,486 22,601 20,115
b 1,688 22,601 20,913
TP10 1,124 0,908 22,817 21,693
1+600 a 2,682 22,817 20,135
b 1,718 22,817 21,099
1+650 a 1,944 22,817 20,873
b 1,606 22,817 21,211
TP11 1,146 0,438 23,525 22,379
1+700 a 2,120 23,525 21,405
b 1,708 23,525 21,817
1+750 a 2,078 23,525 21,447
b 1,712 23,525 21,813
1+800 a 2,202 23,525 21,323
b 1,832 23,525 21,693
TP12 1,282 0,924 23,883 22,601
1+850 a 2,745 23,883 21,138
b 2,244 23,883 21,639
TP13 1,508 1,698 23,693 22,185
1+900 a 2,656 23,693 21,037
b 2,164 23,693 21,529
1+940 a 3,224 23,693 20,469 Simpang Jalan Pancing
b 2,266 23,693 21,427
TP14 1,418 1,874 23,237 21,819
R1 a 2,578 23,237 20,659
b 1,874 23,237 21,363
R2 a 2,652 23,237 20,585
b 1,872 23,237 21,365
TP15 1,294 1,092 23,439 22,145
L1 1+970 a 2,600 23,439 20,839
b 2,006 23,439 21,433
L2 a 2,662 23,439 20,777
b 2,146 23,439 21,293
TP16 1,592 1,490 23,541 21,949
R1 a 2,846 23,541 20,695
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Sei Kera
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
b 1,812 23,541 21,729
2 + 000 a 1,745 23,541 21,796
b 1,745 23,541 21,796
2 + 050 a 1,863 23,541 21,678
b 1,863 23,541 21,678
2 + 100 a 2,282 23,541 21,259
b 1,894 23,541 21,647
TP17 1,766 1,994 23,313 21,547
2 + 150 a 2,166 23,313 21,147
b 1,912 23,313 21,401
2 + 200 a 2,392 23,313 20,921
b 1,908 23,313 21,405
2 + 250 a 2,598 23,313 20,715
b 2,222 23,313 21,091
TP18 1,656 2,072 22,897 21,241
2 + 300 a 2,552 22,897 20,345
b 1,888 22,897 21,009
2 + 350 a 2,874 22,897 20,023
b 1,918 22,897 20,979
2 + 400 a 3,102 22,897 19,795
b 1,956 22,897 20,941
2 + 450 a 2,638 22,897 20,259
b 2,052 22,897 20,845
TP19 1,168 1,744 22,321 21,153
2 + 500 a 2,035 22,321 20,286
b 1,464 22,321 20,857
TP19 1,244 22,397 21,153
R2 a 2,238 22,397 20,159 Simpang Sentosa Baru
b 1,556 22,397 20,841
L2 a 2,326 22,397 20,071
b 1,422 22,397 20,975
L1 a 2,266 22,397 20,131
b 1,388 22,397 21,009
R1 a 1,806 22,397 20,591
b 1,328 22,397 21,069
2 + 550 a 2,702 22,397 19,695
b 1,772 22,397 20,625
TP20 1,486 1,726 22,157 20,671
2 + 600 a 2,142 22,157 20,015
b 1,472 22,157 20,685
R1 a 2,268 22,157 19,889 Simpang Sentosa Lama
b 1,884 22,157 20,273
R2 a 2,150 22,157 20,007
b 1,778 22,157 20,379
L1 a 2,348 22,157 19,809
b 1,814 22,157 20,343
L2 a 2,200 22,157 19,957
b 1,834 22,157 20,323
2 + 650 a 2,234 22,157 19,923
b 1,632 22,157 20,525
TP21 1,588 1,648 22,097 20,509
2 + 700 a 2,626 22,097 19,471
b 1,864 22,097 20,233
2 + 750 a 2,244 22,097 19,853
b 1,868 22,097 20,229
2 + 800 a 2,770 22,097 19,327
b 1,918 22,097 20,179
2 + 850 a 2,626 22,097 19,471
Proyek : DED Penanggulangan Banjir di Jalan SURVEY TOPOGRAFI Tanggal : 14 September 2017
Letda Sujono Intersection Jalan Tol Surveyor : Rahmat
Grid : Jalan Tol - Sei Kera
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT JARAK Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
b 1,698 22,097 20,399
2 + 900 a 2,742 22,097 19,355
b 1,644 22,097 20,453
TP22 1,418 1,516 21,999 20,581
2 + 950 a 2,766 21,999 19,233
b 1,932 21,999 20,067
3 + 000 a 2,512 21,999 19,487
b 1,568 21,999 20,431
3 + 050 a 2,304 21,999 19,695
b 1,462 21,999 20,537
3+100 a 2,354 21,999 19,645
b 1,492 21,999 20,507
3 + 150 a 2,294 21,999 19,705
b 1,632 21,999 20,367
TP23 1,052 1,112 21,939 20,887
3 + 200 a 3,028 21,939 18,911
b 1,868 21,939 20,071
TP24 0,938 1,742 21,135 20,197
3+210 a 2,546 21,135 18,589 Ujung Dasar Saluran
b 4,622 21,135 16,513
TP25 0,358 0,922 20,571 20,213
3+215 c 4,848 20,571 15,723 Dasar Sungai Kera
d 2,538 20,571 18,033 Tepi atas sungai
e 4,624 20,571 15,947 Tinggi Muka air

Diukur : Dihitung : Disetujui :

(……………………...…...……..) (……………………...…...……..) (……………………...…...……..)


Elevasi Deviasi
Stationing Jarak Kumulatif Kemiringa
Dasar (cm)
n
0+000 50.00 50.00 18,426 ### As Fly Over Tol 0.013920
0+050 50.00 100.00 19,122 ### - 0.70 (0.004080)
0+100 50.00 150.00 18,918 ### - (0.20) 0.012080
0+150 50.00 200.00 19,522 ### - 0.60 0.002520
0+200 50.00 250.00 19,648 ### - 0.13 (0.003720)
0+250 50.00 300.00 19,462 ### - (0.19) (0.003080)
0+300 50.00 350.00 19,308 ### - (0.15) 0.006220
0+350 50.00 400.00 19,619 ### - 0.31 (0.005140)
0+400 50.00 450.00 19,362 ### - (0.26) 0.006200
0+450 50.00 500.00 19,672 ### - 0.31 0.003860
0+500 50.00 550.00 19,865 ### - 0.19 (0.003960)
0+550 50.00 600.00 19,667 ### - (0.20) 0.005860
0+600 50.00 650.00 19,960 ### - 0.29 0.008100
0+650 50.00 700.00 20,365 ### - 0.41 (0.004900)
0+700 50.00 750.00 20,120 ### - (0.25) 0.000700
0+750 50.00 800.00 20,155 ### - 0.04 (0.013500)
0+800 50.00 850.00 19,480 ### - (0.68) 0.022960
0+850 50.00 900.00 20,628 ### - 1.15 (0.002920)
0+900 50.00 950.00 20,482 ### - (0.15) (0.001260)
0+950 50.00 1,000.00 20,419 ### - (0.06) (0.000600)
1+000 20.00 1,020.00 20,389 ### - (0.03) (0.008850)
1+020 30.00 1,050.00 20,212 ### - (0.18) (0.005000)
1+050 50.00 1,100.00 20,062 ### - (0.15) 0.001900
1+100 50.00 1,150.00 20,157 ### - 0.10 -
1+150 50.00 1,200.00 20,157 ### - - 0.003060
1+200 50.00 1,250.00 20,310 ### - 0.15 (0.008460)
1+250 50.00 1,300.00 19,887 ### - (0.42) 0.008900
1+300 50.00 1,350.00 20,332 ### - 0.45 (0.001620)
1+350 50.00 1,400.00 20,251 ### - (0.08) (0.005960)
1+400 50.00 1,450.00 19,953 ### - (0.30) 0.005120
1+450 50.00 1,500.00 20,209 ### Simpang Selamat Ketaren 0.26 (0.004120)
1+500 50.00 1,550.00 20,003 ### - (0.21) 0.002240
1+550 50.00 1,600.00 20,115 ### - 0.11 0.000400
1+600 50.00 1,650.00 20,135 ### - 0.02 0.014760
1+650 50.00 1,700.00 20,873 ### - 0.74 0.010640
1+700 50.00 1,750.00 21,405 ### - 0.53 0.000840
1+750 50.00 1,800.00 21,447 ### - 0.04 (0.002480)
1+800 50.00 1,850.00 21,323 ### - (0.12) (0.003700)
1+850 50.00 1,900.00 21,138 ### - (0.19) (0.002020)
1+900 50.00 1,950.00 21,037 ### - (0.10) (0.011360)
1+950 50.00 2,000.00 20,469 ### Simpang Jalan Pancing (0.57) 0.026540
2+000 50.00 2,050.00 21,796 ### - 1.33 (0.002360)
2+050 50.00 2,100.00 21,678 ### - (0.12) (0.008380)
2+100 50.00 2,150.00 21,259 ### - (0.42) (0.002240)
2+150 50.00 2,200.00 21,147 ### - (0.11) (0.004520)
2+200 50.00 2,250.00 20,921 ### - (0.23) (0.004120)
2+250 50.00 2,300.00 20,715 ### - (0.21) (0.007400)
2+300 50.00 2,350.00 20,345 ### - (0.37) (0.006440)
2+350 50.00 2,400.00 20,023 ### - (0.32) (0.004560)
2+400 50.00 2,450.00 19,795 ### - (0.23) 0.009280
2+450 50.00 2,500.00 20,259 ### - 0.46 0.000540
2+500 50.00 2,550.00 20,286### - 0.03 (0.011820)
2+550 50.00 2,600.00 19,695 ### - (0.59) 0.006400
2+600 50.00 2,650.00 20,015 ### - 0.32 (0.001840)
2+650 50.00 2,700.00 19,923 ### - (0.09) (0.009040)
2+700 50.00 2,750.00 19,471 ### - (0.45) 0.007640
2+750 50.00 2,800.00 19,853 ### - 0.38 (0.010520)
2+800 50.00 2,850.00 19,327 ### - (0.53) 0.002880
2+850 50.00 2,900.00 19,471 ### - 0.14 (0.002320)
2+900 50.00 2,950.00 19,355 ### - (0.12) (0.002440)
2+950 50.00 3,000.00 19,233 ### - (0.12) 0.005080
3+000 50.00 3,050.00 19,487 ### - 0.25 0.004160
3+050 50.00 3,100.00 19,695 ### - 0.21 (0.001000)
3+100 50.00 3,150.00 19,645 ### - (0.05) 0.001200
3+150 51.00 3,201.00 19,705 ### - 0.06 (0.015569)
3+200 52.00 3,253.00 18,911 ### - (0.79) (0.006192)
3+210 53.00 3,306.00 18,589 ### Ujung Dasar Saluran (0.32) (0.054075)
3+215 54.00 3,360.00 15,723 ### Dasar Sungai Kera (2.87) (0.291167)
3+265
naik
turun
naik
naik
turun
turun
naik
turun
naik
naik
turun
naik
naik
turun
naik
turun
naik
turun
turun
turun
turun
turun
naik
turun
naik
turun
naik
turun
turun
naik
turun
naik
naik
naik
naik
naik
turun
turun
turun
turun
naik
turun
turun
turun
turun
turun
turun
turun
turun
naik
naik
turun
naik
turun
turun
naik
turun
naik
turun
turun
naik
naik
turun
naik
turun
turun
turun
turun
14,000
15,000
16,000
17,000
18,000
19,000
20,000
21,000
22,000
23,000

0+000
0+050
0+100 Simpang jalan tol
0+150
0+200
0+250
0+300
0+350
0+400
0+450
0+500
0+550
0+600
0+650
0+700
0+750
0+800
0+850
0+900
0+950
1+000
1+020
1+050
1+100
1+150
1+200
1+250
1+300
1+350
1+400
1+450
1+500 Simp. slamet ketaren
LO
JALAN
1+150
1+200
1+250
1+300
1+350
1+400
1+450
1+500 Simp. slamet ketaren
1+550
1+600
1+650
1+700

LONG SECTION
1+750

JALAN TOL - SEI KERA


1+800
1+850
1+900
1+950
2+000 Simp. jalan pancing
2+050
2+100
2+150
2+200
2+250
2+300
2+350
2+400
2+450
2+500
2+550
Simp. sentosa baru
2+600
2+650
2+700 Simp. sentosa lama
2+750
2+800
2+850
2+900
2+950
3+000
2+700 Simp. sentosa lama
2+750
2+800
2+850
2+900
2+950
3+000
3+050
3+100
3+150
3+200
3+210 Ujung Saluran
3+215 Dasar Sei Kera
DED Penanggulangan
Proyek : Banjir di Jalan Letda SURVEY TOPOGRAFI Tanggal : 14 September 2017
Sujono Intersection Surveyor : Rahmat
Grid : Jalan Tol - Jalan RS Haji
Jalan Tol
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
BM 1,358 21,358 20,000
0+000 a 2,932 21,358 18,426 As Fly Over Tol
b 1,924 21,358 19,434
0+050 a 2,236 21,358 19,122
b 1,472 21,358 19,886
R1 a 2,034 21,358 19,324 Simpang Pintu Masuk Tol
b 1,630 21,358 19,728
R2 a 2,288 21,358 19,070
b 1,538 21,358 19,820
L1 a 2,572 21,358 18,786 Simpang Pintu Masuk Tol
b 2,012 21,358 19,346
L2 a 2,358 21,358 19,000
b 2,082 21,358 19,276
TP1 1,942 1,184 22,116 20,174
0+100 a 3,198 22,116 18,918
b 2,530 22,116 19,586
0+150 a 2,594 22,116 19,522
b 2,178 22,116 19,938
0+200 a 2,468 22,116 19,648
b 2,148 22,116 19,968
TP2 1,900 1,952 22,064 20,164
0+250 a 2,602 22,064 19,462
b 2,125 22,064 19,939
0+300 a 2,756 22,064 19,308
b 1,817 22,064 20,247
0+350 a 2,445 22,064 19,619
b 1,847 22,064 20,217
TP3 1,710 1,687 22,087 20,377
0+400 a 2,725 22,087 19,362
b 1,845 22,087 20,242
0+450 a 2,415 22,087 19,672
b 1,872 22,087 20,215
TP4 1,650 1,567 22,170 20,520
0+500 a 2,305 22,170 19,865
b 1,835 22,170 20,335
0+550 a 2,503 22,170 19,667
b 1,860 22,170 20,310
0+600 a 2,210 22,170 19,960
b 1,792 22,170 20,378
0+650 a 1,805 22,170 20,365
b 1,595 22,170 20,575
0+700 a 2,050 22,170 20,120
b 1,334 22,170 20,836
TP5 1,400 0,885 22,685 21,285
0+750 a 2,530 22,685 20,155
b 2,032 22,685 20,653
0+800 a 3,205 22,685 19,480
b 2,055 22,685 20,630
0+850 a 2,057 22,685 20,628
b 1,855 22,685 20,830
TP6 1,100 1,248 22,537 21,437
0+900 a 2,055 22,537 20,482
b 1,675 22,537 20,862
0+950 a 2,118 22,537 20,419
b 1,770 22,537 20,767
1+000 a 2,148 22,537 20,389
b 1,973 22,537 20,564
1+050 a 2,325 22,537 20,212
DED Penanggulangan
Proyek : Banjir di Jalan Letda SURVEY TOPOGRAFI Tanggal : 14 September 2017
Sujono Intersection Surveyor : Rahmat
Grid : Jalan Tol - Jalan RS Haji
Jalan Tol
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
b 1,792 22,537 20,745
1+100 a 2,475 22,537 20,062
b 1,856 22,537 20,681
TP7 0,925 1,085 22,377 21,452
1+150 a 2,220 22,377 20,157
b 1,790 22,377 20,587
1+200 a 2,067 22,377 20,310
b 1,928 22,377 20,449
1+250 a 2,490 22,377 19,887
b 1,890 22,377 20,487
1+300 a 2,045 22,377 20,332
b 1,722 22,377 20,655
TP8 1,466 1,208 22,635 21,169
1+350 a 2,384 22,635 20,251
b 1,922 22,635 20,713
1+400 a 2,682 22,635 19,953
b 1,988 22,635 20,647
1+450 a 2,426 22,635 20,209 Simpang Selamat Ketaren
b 1,924 22,635 20,711
TP9 1,170 1,658 22,147 20,977
1+480 a 2,440 22,147 19,707
b 1,607 22,147 20,540
TP10 1,593 1,464 22,276 20,683
1+500 a 2,308 22,276 19,968
b 1,792 22,276 20,484
1+530 a 2,575 22,276 19,701
b 1,894 22,276 20,382
TP11 1,413 1,724 21,965 20,552
1+550 a 2,208 21,965 19,757
b 1,745 21,965 20,220
1+600 a 2,745 21,965 19,220
b 1,804 21,965 20,161
TP12 1,580 1,570 21,975 20,395
1+650 a 2,584 21,975 19,391
b 1,633 21,975 20,342
1+700 a 2,564 21,975 19,411
b 1,505 21,975 20,470
1+750 a 2,575 21,975 19,400
b 1,614 21,975 20,361
TP13 0,905 1,520 21,360 20,455
1+800 a 2,203 21,360 19,157
b 1,364 21,360 19,996
1+850 a 2,453 21,360 18,907
b 1,426 21,360 19,934
1+900 a 2,558 21,360 18,802
b 1,662 21,360 19,698
1+950 a 2,502 21,360 18,858
b 1,455 21,360 19,905
2+000 a 2,602 21,360 18,758
b 1,518 21,360 19,842
TP14 0,988 1,418 20,930 19,942
2+050 a 1,840 20,930 19,090
b 1,288 20,930 19,642
2+100 a 1,872 20,930 19,058
b 1,608 20,930 19,322
2+150 a 2,310 20,930 18,620
b 1,704 20,930 19,226
2+200 a 2,627 20,930 18,303
DED Penanggulangan
Proyek : Banjir di Jalan Letda SURVEY TOPOGRAFI Tanggal : 14 September 2017
Sujono Intersection Surveyor : Rahmat
Grid : Jalan Tol - Jalan RS Haji
Jalan Tol
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )
b 1,885 20,930 19,045
TP15 1,315 2,125 20,120 18,805
2+250 a 2,955 20,120 17,165
b 1,618 20,120 18,502
2+280 a 2,918 20,120 17,202 Simpang Jalan Pasar V
b 1,767 20,120 18,353
R1 a 3,525 20,120 16,595 Awal Box Culvert
b 2,202 20,120 17,918
L1 2+300 a 3,428 20,120 16,692 Ujung Box Culvert
b 2,220 20,120 17,900
L2 a 2,870 20,120 17,250
b 1,742 20,120 18,378
TP16 1,364 1,562 19,922 18,558
2+350 a 3,509 19,922 16,413
b 2,227 19,922 17,695
2+400 a 3,628 19,922 16,294
b 2,221 19,922 17,701
2+450 a 3,632 19,922 16,290
b 2,290 19,922 17,632
2+500 a 3,655 19,922 16,267
b 2,345 19,922 17,577
TP17 1,324 1,752 19,494 18,170
2+550 a 3,309 19,494 16,185
b 2,107 19,494 17,387
2+600 a 3,490 19,494 16,004
b 2,297 19,494 17,197
TP18 1,206 1,902 18,798 17,592
2+650 a 2,912 18,798 15,886
b 1,654 18,798 17,144
2+700 a 3,125 18,798 15,673
b 1,784 18,798 17,014
2+750 a 3,215 18,798 15,583
b 1,964 18,798 16,834
TP19 1,358 1,664 18,492 17,134
2+800 a 2,915 18,492 15,577
b 1,686 18,492 16,806
2+850 a 3,025 18,492 15,467
b 1,721 18,492 16,771
2+900 a 3,144 18,492 15,348
b 1,784 18,492 16,708
TP20 1,418 1,518 18,392 16,974
2+950 a 3,145 18,392 15,247
b 1,764 18,392 16,628
3+000 a 3,231 18,392 15,161
b 1,853 18,392 16,539
3+050 a 3,418 18,392 14,974
b 2,022 18,392 16,370
TP21 1,926 2,004 18,314 16,388
3+100 a 3,535 18,314 14,779
b 2,070 18,314 16,244
L1 3+150 a 3,730 18,314 14,584 Simpang Jalan RS Haji
b 2,195 18,314 16,119
L2 3+150 a 3,328 18,314 14,986
b 2,426 18,314 15,888
R1 3+200 a 3,732 18,314 14,582 Ujung Box Culvert
b 2,492 18,314 15,822
R2 3+200 a 3,504 18,314 14,810
b 2,488 18,314 15,826
DED Penanggulangan
Proyek : Banjir di Jalan Letda SURVEY TOPOGRAFI Tanggal : 14 September 2017
Sujono Intersection Surveyor : Rahmat
Grid : Jalan Tol - Jalan RS Haji
Jalan Tol
LONG SECTION Alat : Autolevel
DRAINASE
Dihitung oleh : Rahmat
Tinggi
PEMBACAAN RAMBU
STA POINT Garis Bidik ELEVASI CATATAN LAPANGAN
BS IS FS ( H.I. )

Diukur : Dihitung : Disetujui :

(……………………...…...……..) (……………………...…...……..) (……………………...…...……..)


Elevasi Deviasi
Stationing Jarak Kumulatif Kemiringa
Dasar (cm)
n
0+000 50.00 50.00 18,426 ### As Fly Over Tol 0.013920
0+050 50.00 100.00 19,122 ### - 0.70 (0.004080)
0+100 50.00 150.00 18,918 ### - (0.20) 0.012080
0+150 50.00 200.00 19,522 ### - 0.60 0.002520
0+200 50.00 250.00 19,648 ### - 0.13 (0.003720)
0+250 50.00 300.00 19,462 ### - (0.19) (0.003080)
0+300 50.00 350.00 19,308 ### - (0.15) 0.006220
0+350 50.00 400.00 19,619 ### - 0.31 (0.005140)
0+400 50.00 450.00 19,362 ### - (0.26) 0.006200
0+450 50.00 500.00 19,672 ### - 0.31 0.003860
0+500 50.00 550.00 19,865 ### - 0.19 (0.003960)
0+550 50.00 600.00 19,667 ### - (0.20) 0.005860
0+600 50.00 650.00 19,960 ### - 0.29 0.008100
0+650 50.00 700.00 20,365 ### - 0.41 (0.004900)
0+700 50.00 750.00 20,120 ### - (0.25) 0.000700
0+750 50.00 800.00 20,155 ### - 0.04 (0.013500)
0+800 50.00 850.00 19,480 ### - (0.68) 0.022960
0+850 50.00 900.00 20,628 ### - 1.15 (0.002920)
0+900 50.00 950.00 20,482 ### - (0.15) (0.001260)
0+950 50.00 1,000.00 20,419 ### - (0.06) (0.000600)
1+000 50.00 1,050.00 20,389 ### - (0.03) 0.003500
1+050 50.00 1,100.00 20,564 ### - 0.18 (0.007040)
1+100 50.00 1,150.00 20,212 ### - (0.35) 0.010660
1+150 50.00 1,200.00 20,745 ### - 0.53 (0.008700)
1+200 50.00 1,250.00 20,310 ### - (0.44) (0.008460)
1+250 50.00 1,300.00 19,887 ### - (0.42) 0.008900
1+300 50.00 1,350.00 20,332 ### - 0.45 (0.001620)
1+350 50.00 1,400.00 20,251 ### - (0.08) (0.005960)
1+400 50.00 1,450.00 19,953 ### - (0.30) 0.005120
1+450 30.00 1,480.00 20,209 ### Simpang Selamat Ketaren 0.26 (0.016733)
1+480 20.00 1,500.00 19,707 ### - (0.50) 0.013050
1+500 50.00 1,550.00 19,968 ### - 0.26 (0.004220)
1+550 50.00 1,600.00 19,757 ### - (0.21) (0.010740)
1+600 50.00 1,650.00 19,220 ### - (0.54) 0.003420
1+650 50.00 1,700.00 19,391 ### - 0.17 0.000400
1+700 50.00 1,750.00 19,411 ### - 0.02 (0.000220)
1+750 50.00 1,800.00 19,400 ### - (0.01) (0.004860)
1+800 50.00 1,850.00 19,157 ### - (0.24) (0.005000)
1+850 50.00 1,900.00 18,907 ### - (0.25) (0.002100)
1+900 50.00 1,950.00 18,802 ### - (0.11) 0.001120
1+950 50.00 2,000.00 18,858 ### - 0.06 (0.002000)
2+000 50.00 2,050.00 18,758 ### - (0.10) 0.006640
2+050 50.00 2,100.00 19,090 ### - 0.33 (0.000640)
2+100 50.00 2,150.00 19,058 ### - (0.03) (0.008760)
2+150 50.00 2,200.00 18,620 ### - (0.44) (0.006340)
2+200 50.00 2,250.00 18,303 ### - (0.32) (0.022760)
2+250 30.00 2,280.00 17,165 ### - (1.14) 0.001233
2+280 20.00 2,300.00 17,202 ### Simpang Jalan Pasar V 0.04 (0.025500)
2+300 50.00 2,350.00 16,692 ### Ujung Box Culvert (0.51) (0.005580)
2+350 50.00 2,400.00 16,413 ### - (0.28) (0.002380)
2+400 50.00 2,450.00 16,294### - (0.12) (0.000080)
2+450 50.00 2,500.00 16,290 ### - (0.00) (0.000460)
2+500 50.00 2,550.00 16,267 ### - (0.02) (0.001640)
2+550 50.00 2,600.00 16,185 ### - (0.08) (0.003620)
2+600 50.00 2,650.00 16,004 ### - (0.18) (0.002360)
2+650 50.00 2,700.00 15,886 ### - (0.12) (0.004260)
2+700 50.00 2,750.00 15,673 ### - (0.21) (0.001800)
2+750 50.00 2,800.00 15,583 ### - (0.09) (0.000120)
2+800 50.00 2,850.00 15,577 ### - (0.01) (0.002200)
2+850 50.00 2,900.00 15,467 ### - (0.11) (0.002380)
2+900 50.00 2,950.00 15,348 ### - (0.12) (0.002020)
2+950 50.00 3,000.00 15,247 ### - (0.10) (0.001720)
3+000 50.00 3,050.00 15,161 ### - (0.09) (0.003740)
3+050 50.00 3,100.00 14,974 ### - (0.19) (0.003900)
3+100 50.00 3,150.00 14,779 ### - (0.20) (0.003900)
3+150 50.00 3,200.00 14,584 ### Simpang Jalan RS Haji (0.20) (0.000040)
3+200 50.00 3,250.00 14,582 ### Ujung Box Culvert (0.00) (0.291640)
3+250
naik
turun
naik
naik
turun
turun
naik
turun
naik
naik
turun
naik
naik
turun
naik
turun
naik
turun
turun
turun
naik
turun
naik
turun
turun
naik
turun
turun
naik
turun
naik
turun
turun
naik
naik
turun
turun
turun
turun
naik
turun
naik
turun
turun
turun
turun
naik
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
turun
14,000
15,000
16,000
17,000
18,000
19,000
20,000
21,000
22,000

0+000
0+050
0+100 Simpang jalan tol
0+150
0+200
0+250
0+300
0+350
0+400
0+450
0+500
0+550
0+600
0+650
0+700
0+750
0+800
0+850
0+900
0+950
1+000
1+050
1+100
1+150
1+200
1+250
1+300
1+350
1+400
1+450 Simp. slamet ketaren
1+480
1+500
LO
JALAN TO
1+200
1+250
1+300
1+350
1+400
1+450 Simp. slamet ketaren
1+480
1+500
1+550
1+600
1+650

LONG SECTION
1+700
1+750

JALAN TOL - JALAN RS HAJI


1+800
1+850
1+900
1+950
2+000
2+050
2+100
2+150
2+200
2+250
2+280
2+300
2+350
2+400
2+450
2+500
2+550 Simp. jalan pasar V
2+600
2+650
2+700
2+750
2+800
2+850
2+900
2+600
2+650
2+700
2+750
2+800
2+850
2+900
2+950
3+000
3+050
3+100
Simp. jalan RS Haji
3+150
3+200 Ujung Saluran