Cons Meth Report - Kae
Cons Meth Report - Kae
Rosales
Saturday 8:00-1:00pm
“Rehabilitation”
Necessary improvements to be done in an existing project that is in bad shape. A “sick” project
is one that is afflicted with numerous technical, management and financial problems.
2. Projects that are operationally stopped upon the issuance of the court’s temporary restraining
orders (TRO) and the subsequent court litigation
How the Construction Management consultants can undertake a process of rehabilitating sick projects.
3. Compute the total accomplishment as of the time the work was stopped against the budget;
7. Develop Bar Charts and S-Curve, Manpower Schedule, Equipment Schedule and
8. Construction methods;
9. Prepare final costing for change orders and additional works based on the newly revised plans
and specifications;
15. Ensure proper direction and control mechanisms of the project are implemented;
17. Organize coordination meetings among project participants. Present the difficult problems to be
overcome and the pragmatic solutions to turn around the project.
There are several standard construction forms that should be developed to ensure seamless
flow of construction, maintain proper records of transactions, and also to serve as reference
after construction.