Daily Check Sheet 2017

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Format No-KPI/QA/F/058

WEIGHING MACHINE Check sheet Prepared by Approved by


MM: YY: Rev No& Date-29.06.2017

M/C Name : WEIGHING MACHINE - preventive maintenance check sheet                   


*Steps

No's Details Area to be checked Points to be checked Control Steps Time Method
Interval

1 Weight & Visual Weighing Machine and weighing machine table Clean Inspection table,Weighing machine All areas to be free from burr or Daily Visual
1 4
Inspection top and bottom area any foreign particles

5
Weight & Visual Check the level of four corner bottom If gap is available adjust the
2 Machine stability Daily Visual
Inspection screws for a equal gap screws 3
Weight & Visual Weighing Machine Water level The water level condition should be Adjust the leveling condition and
3 bring water level inside to the Daily Visual
Inspection within the circle circle

Weight & Visual Check the indication Green-ok Red-not Inform the incharge for
4
Inspection Check the buzzer condition(P) ok by placing OK and NG master sample correction for maintanence Daily Visual
parts
2
Weight & Visual Weighing Machine table tube light If there is problem,inform to 2
5
Inspection
Check the light ON and OFF conditions. incharge for correction for
maintanence
Daily Visual 1
*Daily check points(During Run) Usual・・・○  Abnormal・・・× Not Used ・・・ / After Correction ・・・ *Abnormality column 2
2
S.NO Area 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 HOD IN-CHARGE

1 Weighing
burr
Machine and around the table free from

2 Machine Stability

3 Water level condition is in the centre of the circle

4 Buzzer Indicates Green-OK & Red-NG.

5 Weight & Visual table lamp working.

Checked by :

Week End Check by person-in-charge Comments: