Professional Documents
Culture Documents
Manual List Update 10.12.2012
Manual List Update 10.12.2012
9 PSER:TSX:945:2012 Procedure of Hydro Test & Flushing of Turbine Lube Oil and Jacking Oil System Rev-01 1 Nos.
10 PSER:TSX:943:12 Procedure of Steam Blowing of Boiler & Critical Piping Rev-01 1 Nos.
11 PSER:TSX:857:11 Procedure of Commissioning of FD Fan. Rev-00 1 Nos.
12 PSER:TSX:948:12 Procedure of Safety Valve Floating. Rev-00 1 Nos.
13 PSER:TSX:998:12 Procedure For Commissioning Of HP Bay Pass System. Rev-00 1 Nos.
14 PSER : TSX : 162 : 12 PROCEDURE FOR COMMISSIONING OF PNEUMATIC ACTUATOR FOR UNIT - I & II. Rev-01 2 Nos.
31 QPX:ADN:270:BR:26 FIELD QUALITY PLAN FOR BOILER SEAL AIR FAN.(ERECTION & COMMISSIONING). Rev-R00 1 Nos.
FIELD QUALITY PLAN FOR DUCTS, DAMPERS, GATES & EXPANSION
32 QPX:ADN:270:BR:33 Rev0-R00 1 Nos.
JOINT(ERECTION & COMMISSIONING)
33 QPX:ADN:270:ST:45 FIELD QUALITY PLAN FOR BOILER FEED PUMP (ERECTION & COMMISSIONING) Rev-R00 1 Nos.
40 PSER:QLY:001:94 WELDING PROCEDURE SPECIFICATIONS VALUME-IV (BUS DUCT WELDING). Rev-01 3 Nos.
41 PSER:QLY:03:95 GUIDELINE FOR FILLING UP OF FORMATS FOR MDR, SAR, CAR, AND SSAR. Rev-03 1 Nos.
MONITORING & MEASURING EQUIPMENT SELECTION IN THE THERMAL SETS (210
42 PSER:QLY:001:10 Rev-00 1 Nos.
MW TO 600 MW)
43 PSER:QLY:002:05 STORAGE AND PRESERVATION INSTRUCTION FOR BOILER & AUX. (SUB CRITICAL). Rev-R01 1 Nos.
QUALITY DOCUMENTATION OF BOOSTER PUMP. (PUMP NO. PM10551491 492
44 HYQA/PUMPS/QP/684 1 Nos.
493)
QUALITY DOCUMENTATION OF BOOSTER PUMP. (PUMP NO. PM10551494 495
45 HYQA/PUMPS/QP/684 1 Nos.
496)
QUALITY DOCUMENTATION OF BOILER FEED PUMP. (PUMP NO. PM10541494
46 HYQA/PUMPS/QP/684
495 496)
47 PSER : TSX : 119 : 12 Procedure of Clean Air Flow Test of Coal pipes. Rev-00 2 Nos.
48 PSER : TSX : 125 : 12 Procedure of Commissioning of Bowl Mill - XRP 943. Rev-00 2 Nos.
Adhunik Power & Natural Resources Limited.
Project: Adhunik 4x270 MW.
List of Document.
Sr. No. of
Documents / Doc. No. DESCRIPTION REV. Issued To
No. COPY
1 set. C&I (Bangde )
1 Set Electrical.(Surjeet Patnaik
)
49 Operation and Maintenance Manual Digital Automatic Voltage Regulator (DAVR)- Vol-1 10 Nos. 1 Set President Office
1 set (BTG Operation) on
dated 26 .03.2012 (Mr.
A.K.Shahi)
1 set. C&I (Bangde )
1 Set Electrical.(Surjeet Patnaik
)
50 Operation and Maintenance Manual Digital Automatic Voltage Regulator (DAVR)- Vol-2 10 Nos. 1 Set President Office
1 set (BTG Operation) on
dated 26 .03.2012 (Mr.
A.K.Shahi)
1 set. C&I (Bangde )
1 Set Electrical.(Surjeet Patnaik
)
51 Operation and Maintenance Manual Digital Automatic Voltage Regulator (DAVR)- Vol-3 10 Nos. 1 Set President Office
1 set (BTG Operation) on
dated 26 .03.2012 (Mr.
A.K.Shahi)
3 set (BTG) on dated 21,22
Boiler Feed Booster Pump (BFBP), .11.2011
Boiler Feed Pump (BFP) & 1 set (BTG Operation) on
52 Operation and Maintenance Manual 9 Nos.
Condensate Extraction Pump(CEP). dated 26 .03.2012 (Mr.
Vol-1 A.K.Shahi)
3 set (BTG) on dated 21,22
Hydraulic Coupling Type: R16K.1 .11.2011
53 Operation and Maintenance Manual for Boiler Feed Fump (BFP) 9 Nos. 1 set (BTG Operation) on
Vol-II dated 26 .03.2012 (Mr.
A.K.Shahi)
OTOKLIN SIMPLEX BASKET FILTER 1 set (BTG) on dated 12
(P.O.No:- PW/PE/PG/ADH/P-1708/10) .04.2012
O.C.No :- 513 (Mr.Ambuj)
54 1 Nos.
1 set (BTG Operation) on
MANUAL FOR INSTALLATION, Operation and
dated 26 .03.2012 (Mr.
Maintenance Manual A.K.Shahi)
Adhunik Power & Natural Resources Limited.
Project: Adhunik 4x270 MW.
List of Document.
MANUAL FOR INSTALLATION, Operation and
Sr. No. of
Maintenance Manual
Documents / Doc. No. DESCRIPTION REV. Issued To
No. COPY
OTOKLIN SIMPLEX BASKET FILTER 1 set (BTG Operation) on
55 (P.O.No:- PW/PE/PG/ADH/P-1709/10) 1Nos. dated 26 .03.2012 (Mr.
O.C.No :- 514 A.K.Shahi)
1 set (TG) on dated 12
.04.2012
Miscellaneous Pumps (UNIT-1) (Mr.Ambuj)
56 3 Nos.
P.O.No:- PW/PE/PG/ADU/P-1316/10 1 set (BTG Operation) on
dated 26 .03.2012 (Mr.
A.K.Shahi)
Operation and Maintenance Manual
1 set (TG) on dated 12
.04.2012
Miscellaneous Pumps (UNIT-II) (Mr.Ambuj)
57 3 Nos.
P.O.No:- PW/PE/PG/ADU/P-1317/10 1 set (BTG Operation) on
dated 26 .03.2012 (Mr.
A.K.Shahi)
Condensate Extraction Pumps
58 Pump Type: EN5J40/500 1 Nos.
STAGE : 1
Quality Document
Condensate Extraction Pumps
59 Pump Type: EN5J40/500 1 Nos.
STAGE : II
1 Copy President Power Office,
1 Copy BTG, 1 Copy Electrical ,
270MW TOTALLY IMPREGNATED 1 Copy C&I,
60 5 Nos.
TURBOGENERATOR 1 set (BTG Operation) on
Operation and Maintenance Manual dated 26 .03.2012 (Mr.
A.K.Shahi)
1 set (BTG Operation) on
Electro Hydraulic Actuators for main
61 1 Nos. dated 26 .03.2012 (Mr.
Turbine Valves A.K.Shahi)
Installation,Operation and Maintenance Manual 2 set (BTG) on dated ,12
62 CONDENSER VACUUM PUMP (AT-2006E) 6 Nos .04.2012
(Mr.Ambuj), 1 Set 09 .06.2012
Instrumentation Schemes & Schudule, Schudule of Damper, List of LT & Servo 1 set (BTG Operation) on
63 Motor, Drum Level Instrumentation, Tapping Point Details, FSSS, SADC, SBC, & 5 Nos. dated 09 .06.2012 (Mr.
Operation and Maintenance instruction Manual EWLI-VOL-D1 A.K.Shahi)
Adhunik Power & Natural Resources Limited.
Project: Adhunik 4x270 MW.
List of Document.
Sr. No. of
Documents / Doc. No. DESCRIPTION REV. Issued To
No. Operation and Maintenance instruction Manual COPY
Boiler Performance, Pressure Part, Lining & Insulation, Ducts and Layouts- VOL- 1 set (BTG Operation) on
64 5 Nos. dated 09 .06.2012 (Mr.
A1 A.K.Shahi)
65 CONTROL & INSTRUMENTATION ENGINEERING PRIMARY EQUIPMENT CATALOG. 8 Nos.
1 set (BTG) on dated 29
66 MAB 206S-24 , SEPARATION SYSTEM 6 Nos.
INSTRUCTION MANUAL .10.2012 (Mr. Ambuj)
67 OPERATION & MAINTENANCE MANUAL GENERATOR CONTROL AND INSTRUMENTATION 6 Nos.
1. Conductivity type Level Switch.
2. Pressure & Diff. Pressure Switches.
3. Pressure & Diff. Pressure Gauges.
1 set (BTG Operation) on
4. Temperature Gauges.
68 BPE Mechanical O & M manual VOL : E.01M 2 Nos. dated 02 .07.2012 (Mr.
5. E/P Converters.
A.K.Shahi)
6. Air Filter Regulator.
7. Installation Scheme for Instrument.
8. Installation Scheme for Instrument)
1. Oxygen Analyzer
69 BPE Mechanical O & M manual VOL : E.02M 3 Nos.
2. Dust Analyzer / Opacity Monitor.
70 BPE Mechanical O & M manual VOL : E.03M Local Instrument Enclosure & Local Instrument Rack. 3 Nos.
71 BPE Mechanical O & M manual VOL : E.04AM Steam & Water Analysis System. 4 Nos.
72 BPE Mechanical O & M manual VOL : E.04BM Steam & Water Analysis System. 3 Nos.
73 BPE Mechanical O & M manual VOL : E.05AM Vibration Monitoring System (VMS). 4 Nos.
74 BPE Mechanical O & M manual VOL : E.05BM Vibration Monitoring System (VMS). 3 Nos.
75 BPE Mechanical O & M manual VOL : E.06M lLaboratory Instruments (Mechanical). 3 Nos.
76 Installation and Operation Manual Orifice Flange & Flow Nozzle Assy. (Unit-I) 7 Nos.
77 Installation and Operation Manual Orifice Flange & Flow Nozzle Assy. (Unit-II) 7 Nos.
78 Instruction & Maintenance Manual SWAS (Steam & Water Analysis System) -Vol-1 of 2 1 Nos.
79 Instruction & Maintenance Manual SWAS (Steam & Water Analysis System) -Vol-2 of 2 1 Nos.
1 set (BTG Operation) on
80 Division-B Fuel Firing System, VOL-B1 Feeder System 6 Nos. dated 21 .09.2012 (Mr.
Operation & Maintenance Instruction Manual A.K.Shahi)
Adhunik Power & Natural Resources Limited.
Project: Adhunik 4x270 MW.
List of Document.
Sr. No. of
Documents / Doc. No. DESCRIPTION REV. Issued To
No. COPY
1 No. Mr. Ashok Singh Yadav, 1
No. Mr. Ajay Bangde on Dated
81 Performance Guarantee Test Procedure TG & AUXILIARY POWER CONSUMPTION Rev-00 3 Nos.
25.02.12 & 1 No. Mr. Surajit
Patnaik on dated 26.09.12
82 Operation & Maintence Manual. KILOSKAR 6SL 1500 TA Diesel Engine. 1 Nos.
83 Installation, Operation & Maintenance. Vertical Turbine Pump. 1 Nos.
84 Operation & Maintence Manual. Compressed Air System (VOLL-I) 1 Nos.
85 Operation & Maintence Manual. Compressed Air System (VOLL-II) 1 Nos.
86 Instruction Manual Hydrogen Diaphragm Compressor.
87 Operation Manual & Part List. Model 2545 Two - Stage Industrial Air Compressor.
88 Operation & Maintence Manual. Water Chiller
Installation, Operation & Maintenance Instruction
89 Split Casing Centrifugal Pump.
Manual.
Installation, Operation & Maintenance Instruction
90 Drive Shaft Sr. 10F
Manual.
91 Installation, Operation & Maintenance Manual. Axial Flow FRP Fan.