Professional Documents
Culture Documents
EGGAR Process Flow
EGGAR Process Flow
EGGAR Process Flow
No with Technical
Report
Yes
Proponent shall submit technical report
MGB-10 geologists, to be accompanied by on the project site for review after pay-
project proponent, shall conduct Engineer- ment of corresponding review fee.
ing Geological and Geohazard Assessment
(EGGA) / Geohazard AssessmentReport
(GAR) of the project site.
The MGB-10 Technical Review Commit-
tee (TRC) evaluate the technical report.
MGB geologists shall prepare an EGGA
report (EGGAR)/GA report (GAR).
No with Technical
Report
Yes
MGB-10 geologists, to be accompanied
by project proponent shall conduct geo-
logical verification of the project site.