EGGAR Process Flow

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Procedure for compliance with DAO 2000-28

for Subdivision/Housing Projects


(for Government Agencies/Entities)

EMB-10 endorsed or proponent’s letter of request


for geological assessment shall be submitted to the
Office of the RD MGB-10.

Proponent shall enter into a Memoran-


dum of Agreement with the MGB.

No with Technical
Report
Yes
Proponent shall submit technical report
MGB-10 geologists, to be accompanied by on the project site for review after pay-
project proponent, shall conduct Engineer- ment of corresponding review fee.
ing Geological and Geohazard Assessment
(EGGA) / Geohazard AssessmentReport
(GAR) of the project site.
The MGB-10 Technical Review Commit-
tee (TRC) evaluate the technical report.
MGB geologists shall prepare an EGGA
report (EGGAR)/GA report (GAR).
No with Technical
Report

Yes
MGB-10 geologists, to be accompanied
by project proponent shall conduct geo-
logical verification of the project site.

The MGB-10 Technical Review MGB-10 geologists shall prepare a


Committee (TRC) shall review Geological Verification Report (GVR).
the EGGAR/GAR. The proponent shall have to comply
with the requirements of the GVR.

TRC shall prepare a Geologi-


cal Review Report (GRR). The The proponent shall submit technical
proponent shall have to com- report (now called EGGAR) revised
ply with the requirements of in accordance with the stipulations in
the GRR before the TRC re- the GVR to the MGB-10 Technical
leases the final version. Review Committee (TRC).

MGB-10 shall submit the


GRR, with EGGAR attached,
to EMB-10 (copy furnished
project proponent).
Procedure for Other Geological
Investigation request
(For Private or Government Agencies/Entities)

Proponent prepares letter of request for geo-


logical investigation and submit the same
to the MGB-10 Office for RD’s approval.

Upon receipt of the letter of request and


approval of the same, the proponent shall
pay the required minimum fees and
charges for geological investigation.

MGB-10 shall schedule the geological in-


vestigation.

MGB-10 geologist(s), to be accompanied


by project proponent, shall conduct Geo-
logical Investigation of the project site.

MGB-10 geologist(s), prepare the Geologi-


cal Investigation Report.

MGB-10 geologist(s) shall submit the in-


vestigation Report to the Chief Geologist
with the latter, after reviewing, endorse the
same to the Regional Director.

RD reviews the output and endorses the


Investigation report to the requesting
Party/Client.