GOVERNMENT OF ANDHRA PRADESH

ROADS AND BUILDINGS DEPARTMENT

From To
Sri P.Murali Krishna, M.Tech., The Superintending Engineer,
Executive Engineer (R&B) Circle, Kakinada
(R&B) Division, Kakinada

Letter no.EE(R&B) Kkd/IIIrd ADJ Court/ Kakinada/2018 dt 09.02.2018


Sir,
Sub: (R&B) Division, Kakinada – Construction of III rd Addl. District Court
Building in Kakinada – DPR’s Preparation by Bhaskar Design Team –Soil Investigation
Report, Architectural Plans & Elevations, Structural designs & D.P.R’s Submitted by
Bhaskar Design Team – Report - Submitted – Regarding.

Ref:1. Govt of Andhra Pradesh G.O.Ms.No.58 Home(Court-B) Dept dt:12-04-2017


2.Endt No. 2922/Judicial KKD/JTO/2016-17 Dt:20-09-2017 of Executive Engineer
(R&B) Division, Kakinada.
*******
I submit that the Government have accorded Administrate sanction for the
work “Construction of III rd Addl. District Court Building in Kakinada” for Rs.675.00
lakhs vide reference 1st cited. The Chief Engineer (R&B) Bldgs & RSW,Vijayawada has
entrusted the consultant for preparation of DPR’s i.e., Site survey, Soil investigation,
Architectural drawings, floor plans, Design report, design drawings & BOQ’s of above
work to Bhaskar Design Team, Visakhapatnam.
In this connection I submit that the consultant B. Bhaskar Rao, Chief Architect
of Bhaskar Design Team vide reference 2nd cited above has submitted Soil Investigation
Report, Site Survey level Plan, Site Survey Plan, Site Plan, Architectural Elevation &
Ground Floor Plan.
As verified the above particulars the following observations are found.
1. The above building is designed for stilt+ground+3 floors
2. The First Floor Plan submitted by consultant is as per the approved type design Drg
no: SA/30/02/2012-13 dt: 06-11-2012.
3. Consultant has submitted estimate for stilt + ground+1st floor (DESIGNED FOR 5
FLOORS) by duly providing provision for amenities for public in ground floor and
detailed estimates for stilt floor and court building in the 1st floor.
Further, I submit that the Soil report, Architectural plans & elevation
Drawings, structural design report & estimates submitted by the consultant are
Verified and found to be satisfying and are here with submitted for onward
submission to Higher Authorities for obtaining necessary approval.
This is submitted for favor of information and taking further necessary action.

Encls: Above particulars – 2 sets yours faithfully,

Executive Engineer,
(R&B) division, Kakinada