NO need,GF and 1st floor stru work, bcz already building is thr

2nd floor u can put structural

No need setting out but setting out for parking area, u can say external area

Put the activities,

External work

Site clearance
Site office and labour dinning
Leveling
Setting out
Paving of interlock
Installation of access control and CCTV camera

Green Building Concept.

Rain Water Harvesting System


Solar Panel System
Creation for Micro Climates
Low Cost Cooling Method
Natural Park Concept
Waste Water Re-cycle System

Ground floor
I. Electrical work
II. Elevator installation
III. Mechanical work
IV. Fitout work
V. Installation of PA system
VI. Fixing of ATM

First floor
I. Electrical work
II. Elevator installation
III. Mechanical work
IV. Fitout work
V. Installation of PA system

2nd floor
I. Electrical work
II. Elevator installation
III. Mechanical work
IV. Fitout work
V. Installation of PA system
VI. Fixing of ATM