Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 48

ACES acesdoha@aces-int.

com
AECOM tim.baker@aecom.com Imperial.Yap@kbr.com
AL JABER info@jabmak.com
ALCAT www.ammann-group.com nabeel.modathikundan@hlgjec-noh3.com
Algosystem linda.salhah@trafficonsult.com linda.salhah@trafficonsult.com
Bin omran Binomran@qatar.net.qa
CONSPEL info@intertectraqatar.com AlexSahyoun@algosystems.gr
ftp://qd-cpc.com username: nafftp lambri@engineer.com
password : nafusr910
Asqhal salmuhannadi@asghal.gov.qa
QNBN nazhar@qnbn.qa
Rizzani Rizzani@qatar.net.qa

WSP Riaz Rahman 179 70481729 Senior Designers riaz.rehman@wspgroup.com


Murty Bollapragada 180 70489285 Structure Engineer murty.bollapragada@wspgroup.com
Abid Ali 178 50023775 Utilitie Engineer abid.ali@wspgroup.com
Faheem Memon 178 70481723 Site Engineer faheem.memon@wspgroup.com
Sanath Priyadarshana 177 70481726 Road Engineer sanath.priyadarshana@wspgroup.com

CONSPEL 1 Steve Taylor 188 5064 5155 Project manager


s.taylor@aandp-group.com
2 Pallavi Kumari 187 77114469 Planning Engineer p.kumar@aandp-group.com
3 M. Mansoor 66220914 Secretary m.mansoor@aandp-group.com
4 Joanne Sahipa 187 30317027 Secretary j.sahipa@conspel.com.qa

Prequalification Document For


(MTC, Al Mustafawi Trading &
Engineering Co. Wl.L.L)
(Topographical Survey)
Existing Conditions
Prequalification Document For
(MTC, Al Mustafawi Trading &
Engineering Co. Wl.L.L)
(Topographical Survey)
Existing Conditions
Prequalification Document For
(MTC, Al Mustafawi Trading &
Engineering Co. Wl.L.L)
(Topographical Survey)
Existing Conditions
Prequalification Document For
(MTC, Al Mustafawi Trading &
Engineering Co. Wl.L.L)
(Topographical Survey)
Existing Conditions
Prequalification Document For
GHD Middle East (Construction
Environmental Management
Plan)
Prequalification Document For
Fugro Peninsular Services
(Geotechnical, Survey &
Laboratory Services)

Prequalification Document For


Fugro Peninsular Services
(Geotechnical, Survey &
Laboratory Services)

Prequalification Document For


Gulf Colours WLL
(Photography Services, Digital
Videography, Light & Sound
Equipments)
Prequalification Document For
Parsons International Limited
(Category 3, Design
Verification)
Prequalification Document For
Buro Happold (Category 3,
Design Verification)
Prequalification Document For
Salfo & Associates SA
(Category 3, Design
Verification)
Prequalification Document For
Advanced Construction
Technology Services (ACTS)
(Getechnical Investigation)
Prequalification Document For
Advanced Construction
Technology Services (ACTS)
(Getechnical Investigation)
Prequalification Document For
WSP (Multi Disciplinary
Engineering Consultancy)
Prequalification Document For
National Contracting Company
Limited (EHV Power Line
Works)
Transmittal Advise: CRS for
Subcontractor Approval M/s.
NCC
Compliance Form for NCC
Documents Proving NCC
Approval From Kahramaa (9
Documents)
Prequalification Document For
Astel Intertectra JV
(Waterproofing)

Prequalification Document For


Qatar Alpha Beton (Supply of
Readymix Concrete)
Prequalification Document For
Qatar Alpha Beton (Supply of
Readymix Concrete)

Prequalification Document For


Engineering Rebar Factory
(ERF) (Supply Cut and Bend
Steel Reinforcement Bar)

Prequalification Document For


Smeet Readymix W.L.L
(Supply of Readymix Concrete

Prequalification Document For


Smeet Readymix W.L.L
(Supply of Readymix Concrete

Prequalification Document For


Smeet Readymix W.L.L
(Supply of Readymix Concrete

Prequalification Document For


Unibeton Readymix (Supply of
Readymix Concrete)

Prequalification Document For


Unibeton Readymix (Supply of
Readymix Concrete)

Prequalification Document For


Bin Al Sheikh Rebar Factory
(Supply Cut and and Bend
Steel Reinforcement)
Prequalification Document For
Qatar Steel Company (Q.S.C)
(Supply Cut and Bend Steel
Reinforcement)
Prequalification Document For
Garden House Center
(Landscaping & Horicultural)
Prequalification Document For
Garden House Center
(Landscaping & Horicultural)
Prequalification Document For
Gulf Laboratories Co. W.L.L
(Ground Investigations &
Materials and Environmental
Testing)

Prequalification Document For


Technical Laboratories
(Indepdendent Geotechnical &
Material Testing Laboratory)

Prequalification Document For


Energoprojekt- Entel (Design
Consultant for EHV Lines)
Prequalification Document For
Energoprojekt- Entel (Design
Consultant for EHV Lines)

Prequlaification Document For


QD- CPC Premco Precast
Qatar (Manufacturer of
Precast)
Prequlaification Document For
QD- CPC Premco Precast
Qatar (Manufacturer of
Precast)

Prequalification Document For


Sodamco Weber Qatar W.L.L

Prequalification Document For


Arab Center For Engineering
Studies
Prequalification Document For
Exova Qatar LLC
Prequalification Document For
BMC Qatar W.L.L

Prequalification Document For


Algosystems Qatar W.L.L

Prequalification Document for


Advanced Materials Co. LLC
(AMC)
Prequalification Document for
Isotech Ltd Environmental
Consultants
Prequalification Document for
Isotech Ltd Environmental
Consultants
Prequalification Document for
VSL Middle East LLC
Comment Response Sheet for
VSL Middle East

Prequalification Document for


ALCAT Contracting Co. W.L.L.

Prequalification Document for


ALCAT Contracting Co. W.L.L.

Prequalification Document for


ALCAT Contracting Co. W.L.L.

Prequalification Document for


ALCAT Contracting Co. W.L.L.

Prequalification Document for


HASSANESCO Ready Mix
Concrete W.L.L.
CRS for HASSANESCO Ready
Mix Concrete W.L.L.
Prequalification Document for
Middle East Reinforcement Co.
W.L.L.
Comment Response Sheet for
Middle East Reinforcement Co.
W.L.L.
Prequalification Document for
Middle Projects & Plants Co.
Prequalification Document for
Middle Projects & Plants Co.

Khalifa Steel Industries W.L.L.

Conspel Qatar W.L.L.


Conspel Qatar W.L.L.
DUTCH FOUNDATION Co.
W.L.L.
DUTCH FOUNDATION Co.
W.L.L.
TERRATEST QATAR LLC
MBD Trading Contracting
Transport
MBD Trading Contracting
Transport
RABBAN Readymix W.L.L.
RABBAN Readymix W.L.L.
Al-Wakeel Trading &
Contracting
Al-Wakeel Trading &
Contracting
Al-Wakeel Trading &
Contracting
Sand And Rock Crushers
(SARC)
Saram Transport
Saram Transport
Gulf Consolidated Contractors
W.L.L.
Gulf Consolidated Contractors
W.L.L.
Aswan Trading & Contracting
Co. W.L.L.
Tensacciai Srl (TENSA)
Bin Omran Engineering &
Projects W.L.L. (Division of Bin
Omran Group)

BOOM Construction Company


Fullbore Drilling & Lining
W.L.L., Microtunneling
DOREX ENGINEERING
Electrical Works, LV (415 V) &
MV (11 KV) Power Distribution
Works
Electro Mechnacial
Engineering Services Co.
(EMESCO) (Subcontractor of
Conspel Qatar W.L.L.)
RIZZANI DE ECCHER S.P.A.
General Contracting and
Construction Company
Operating Worldwide
RIZZANI DE ECCHER S.P.A.
General Contracting and
Construction Company
Operating Worldwide
QATAR REINFORCEMENT
COMPANY W.L.L
Supply of Deformed High
Tensile Steel Reinforcement
Cut & Bend and Machanical
Splicing System.
Plains Trading and Contracting
Co.
Microtunneling works for TSE
Blue Steel Factory W.L.L
Supply of cut and bend steel
reinforcing bars produced by
QATAR STEEL and Bartec
Mechanical Couplers
Blue Steel Factory W.L.L
Supply of cut and bend steel
reinforcing bars produced by
QATAR STEEL and Bartec
Mechanical Couplers
Desert Diamond Contracting
Microtunneling works for TSE
Desert Diamond Contracting
Microtunneling works for TSE

Structural testing laboratory


Bochum for bridge bearing
testing.by RUHR-UNIVERSITY
BOCHUM - (GERMANY)

Structural testing laboratory


Bochum for bridge bearing
testing.by RUHR-UNIVERSITY
BOCHUM - (GERMANY)

Structural testing laboratory


Bochum for bridge bearing
testing.by RUHR-UNIVERSITY
BOCHUM - (GERMANY)

LV (415 V) & MV (11 KV)


Power Distribution Works by
POWER LINKS QATAR L.L.C.
LV (415 V) & MV (11 KV)
Power Distribution Works by
POWER LINKS QATAR L.L.C.

FUGRO PENINSULAR WLL


International Roughness Index
(IRI)
EMIRATES CONCRETE &
STEEL COATING WORKS
W.L.L (EMCON)
Applicators for Protective
Treatments to Concrete - Anti
Carbonation Coating
Midwil Trading Inc.
Installation of Crash Barriers
AL-MOHSEN ENGINEERING
CO.
Operating Crusher, Blending
Plant and Batching
Plant,Aggregate, Sub Base,
Road Base and Back Fill
Material,(Used for Road
Construction)

AL-MOHSEN ENGINEERING
CO.
Operating Crusher, Blending
Plant and Batching
Plant,Aggregate, Sub Base,
Road Base and Back Fill
Material,(Used for Road
Construction)

TADMUR ROOFS & POOLS


W.L.L
Applicators for Protective
Treatments to Concrete - Anti
Carbonation Coating
AL ZAAROUR TRADING &
CONTRACTING CO.
Applicators for Protective
Treatments to Concrete - Anti
Carbonation Coating

ELECTRO INDUSTRIES -
QATAR
Installation of Steel Guardrails

REDCO-CICON W.L.L
Supply of cut and bend steel
reinforcing bars produced by
QATAR STEEL,and Bartec
Mechanical Couplers
REDCO-CICON W.L.L
Supply of cut and bend steel
reinforcing bars produced by
QATAR STEEL,and Bartec
Mechanical Couplers
GIFFIN TRAFFIKS L.L.C
Over Head Sign Gantries and
Cantilever structures
KHALIFA STEEL INDUSTRIES
W.L.L
Supply of cut and bend steel
reinforcing bars produced by
EMIRATES STEEL
MOKASCO EXPRESS CO.
Supply of cut and bend steel
reinforcing bars produced by
QATAR STEEL,and Bartec
Mechanical Couplers
GULF TUNNELING
Horizontal Drilling
ELECTRO INDUSTRIES
Over Head Sign Gantries and
Cantilever structures
INTERNATIONAL DRILLING
GROUP (IDG)
Horizontal Directional Drilling
j.maina@anas.com.qa h.bahia @anas.com.qa

dan@hlgjec-noh3.com
motasem@trafficonsult.com Wilson.Craig@aecom.com Raed.Al-Ramahi@hlgjec-noh3.com

Hazem.Elgharib@kbr.com

pgroup.com
ollapragada@wspgroup.com

@wspgroup.com
yadarshana@wspgroup.com

andp-group.com
Ramahi@hlgjec-noh3.com Ayman.Ashry@hlgjec-noh3.com
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Prequalification Document For (MTC, Al


0001 EXW-P023-0001-GS-JPL-PQ-00001 Mustafawi Trading & Engineering Co. Wl.L.L) Preliminaries CA 6/Feb/14 10/Feb/14
(Topographical Survey) Existing Conditions

Prequalification Document For (MTC, Al


0002 EXW-P023-0001-GS-JPL-PQ-00001 Mustafawi Trading & Engineering Co. Wl.L.L) Preliminaries CB 12/Feb/14 13/Feb/14
(Topographical Survey) Existing Conditions

Prequalification Document For (MTC, Al


0003 EXW-P023-0001-GS-JPL-PQ-00001 Mustafawi Trading & Engineering Co. Wl.L.L) Preliminaries CC 20/Feb/14 24/Feb/14
(Topographical Survey) Existing Conditions

Prequalification Document For (MTC, Al


0004 EXW-P023-0001-GS-JPL-PQ-00001 Mustafawi Trading & Engineering Co. Wl.L.L) Preliminaries Subcontractor CD 4 23/Feb/14 24/Feb/14
(Topographical Survey) Existing Conditions

Prequalification Document For GHD Middle


0005 EXW-P023-0001-GS-JPL-PQ-00002 East (Construction Environmental Preliminaries Subcontractor CA 1 12/Feb/14 13/Feb/14
Management Plan)
Prequalification Document For Fugro
0006 EXW-P023-0001-CD-JPL-PQ-00003 Peninsular Services (Geotechnical, Survey & Civil CA 6/Mar/14 12/Apr/14
Laboratory Services)
Prequalification Document For Fugro
0007 EXW-P023-0001-CD-JPL-PQ-00003 Peninsular Services (Geotechnical, Survey & Civil Subcontractor CB 2 9/Apr/14 30/Apr/14
Laboratory Services)
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:11 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Prequalification Document For Gulf Colours
0008 EXW-P023-0001-CS-JPL-PQ-00004 WLL (Photography Services, Digital Preliminaries Subcontractor CA 1 16/Mar/14 10/Aug/14
Videography, Light & Sound Equipments)
Prequalification Document For Parsons
0009 EXW-P023-0001-CS-JPL-PQ-00005 International Limited (Category 3, Design Structures Subcontractor CA 1 24/Mar/14 29/Apr/14
Verification)
Prequalification Document For Buro Happold
0010 EXW-P023-0001-CS-JPL-PQ-00006 Structures Subcontractor CA 1 8/Mar/14 29/Apr/14
(Category 3, Design Verification)
Prequalification Document For Salfo &
0011 EXW-P023-0001-CS-JPL-PQ-00007 Associates SA (Category 3, Design Structures Subcontractor CA 1 8/Mar/14 29/Apr/14
Verification)
Prequalification Document For Advanced
0012 EXW-P023-0001-CS-JPL-PQ-00008 Construction Technology Services (ACTS) Structures Subcontractor CA 9/Apr/14 12/May/14
(Getechnical Investigation)
Prequalification Document For Advanced
0013 EXW-P023-0001-CS-JPL-PQ-00008 Construction Technology Services (ACTS) Structures Subcontractor CA 2 15/02/2016
(Getechnical Investigation)
Prequalification Document For WSP (Multi
0013 EXW-P023-0001-CS-JPL-PQ-00009 Structures Subcontractor CA 1 14/May/14 24/Jun/14
Disciplinary Engineering Consultancy)
Prequalification Document For National
0014 EXW-P023-0001-CS-JPL-PQ-00010 Contracting Company Limited (EHV Power Electrical CA 25/May/14 26/Jun/14
Line Works)
Transmittal Advise: CRS for Subcontractor
0015 EXW-P023-0001-PW-AEC-TN-00003 Electrical Subcontractor 30/Jun/14
Approval M/s. NCC
0016 EXW-P023-0001-EE-JPL-PQ-00010 Compliance Form for NCC Electrical Subcontractor CA 30/Jun/14
Documents Proving NCC Approval From
0017 Additional Documents for Kahramaa Electrical 30/Jun/14 30/Jun/14
Kahramaa (9 Documents)

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:12 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Prequalification Document For Astel
0018 EXW-P023-0001-CS-JPL-PQ-00011 Structures Subcontractor CA 1 8/Jun/14 24/Jul/14
Intertectra JV (Waterproofing)
Prequalification Document For Qatar Alpha
0019 EXW-P023-0001-CS-JPL-PQ-00012 Structures CA 8/Jun/14 26/Jun/14
Beton (Supply of Readymix Concrete)

Prequalification Document For Qatar Alpha


0020 EXW-P023-0001-CS-JPL-PQ-00012 Structures Supplier CB 2 24/Jul/14 4/Dec/14
Beton (Supply of Readymix Concrete)

Prequalification Document For Engineering


0021 EXW-P023-0001-CS-JPL-PQ-00013 Rebar Factory (ERF) (Supply Cut and Bend Structures Supplier CA 1 8/Jun/14 16/Jul/14
Steel Reinforcement Bar)
Prequalification Document For Smeet
0022 EXW-P023-0001-CS-JPL-PQ-00014 Readymix W.L.L (Supply of Readymix Structures CA 8/Jun/14 26/Jun/14
Concrete
Prequalification Document For Smeet
0023 EXW-P023-0001-CS-JPL-PQ-00014 Readymix W.L.L (Supply of Readymix Structures CB 24/Jul/14 6/Aug/14
Concrete
Prequalification Document For Smeet
0024 EXW-P023-0001-CS-JPL-PQ-00014 Readymix W.L.L (Supply of Readymix Structures Supplier CC 3 1/Oct/14 11/Oct/14
Concrete
Prequalification Document For Unibeton
0025 EXW-P023-0001-CS-JPL-PQ-00015 Structures CA 10/Jun/14 2/Jul/14
Readymix (Supply of Readymix Concrete)

Prequalification Document For Unibeton


0026 EXW-P023-0001-CS-JPL-PQ-00015 Structures Supplier CB 2 24/Jul/14 4/Dec/14
Readymix (Supply of Readymix Concrete)

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:13 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Prequalification Document For Bin Al Sheikh
0027 EXW-P023-0001-CS-JPL-PQ-00016 Rebar Factory (Supply Cut and and Bend Structures Supplier CA 1 14/Jun/14 24/Jul/14
Steel Reinforcement)
Prequalification Document For Qatar Steel
0028 EXW-P023-0001-CS-JPL-PQ-00017 Company (Q.S.C) (Supply Cut and Bend Steel Structures Supplier CA 21/Jun/14 24/Jul/14
Reinforcement)
Prequalification Document For Garden House Landscape &
0029 EXW-P023-0001-CS-JPL-PQ-00018 CA 2 21/Jun/14 3/Jul/14
Center (Landscaping & Horicultural) Irrigation
Prequalification Document For Garden House Landscape &
0030 EXW-P023-0001-CS-JPL-PQ-00018 Subcontractor CB 2 5/Jul/14 17/Mar/15
Center (Landscaping & Horicultural) Irrigation

Prequalification Document For Gulf


0031 EXW-P023-0001-CS-JPL-PQ-00019 Laboratories Co. W.L.L (Ground Investigations Preliminaries Subcontractor CA 1 21/Jun/14 16/Jul/14
& Materials and Environmental Testing)

Prequalification Document For Technical


0032 EXW-P023-0001-CS-JPL-PQ-00020 Laboratories (Indepdendent Geotechnical & Preliminaries Subcontractor CA 1 21/Jun/14 16/Jul/14
Material Testing Laboratory)

Prequalification Document For Energoprojekt-


0033 EXW-P023-0001-CS-JPL-PQ-00021 Electrical CA 13/Jul/14 16/Jul/14
Entel (Design Consultant for EHV Lines)

Prequalification Document For Energoprojekt-


0034 EXW-P023-0001-CS-JPL-PQ-00021 Electrical Subcontractor CB 2 20/Jul/14 24/Jul/14
Entel (Design Consultant for EHV Lines)

Prequlaification Document For QD- CPC


0035 EXW-P023-0001-CS-JPL-PQ-00022 Premco Precast Qatar (Manufacturer of Structures CA 14/Jul/14 2/Aug/14
Precast)

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:14 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Prequlaification Document For QD- CPC
0036 EXW-P023-0001-CS-JPL-PQ-00022 Premco Precast Qatar (Manufacturer of Structures Supplier CB 2 19/Aug/14 28/Aug/14
Precast)
Prequalification Document For Sodamco
0037 EXW-P023-0001-CS-JPL-PQ-00023 Structures Supplier CA 1 12/Aug/14 19/Aug/14
Weber Qatar W.L.L
Prequalification Document For Arab Center For
0038 EXW-P023-0001-CS-JPL-PQ-00024 Preliminaries Subcontractor CA 1 12/Aug/14 14/Aug/14
Engineering Studies
Prequalification Document For Exova Qatar
0039 EXW-P023-0001-CS-JPL-PQ-00025 Preliminaries Subcontractor CA 1 12/Aug/14 14/Aug/14
LLC
Prequalification Document For BMC Qatar
0040 EXW-P023-0001-CS-JPL-PQ-00026 Structures Supplier CA 1 12/Aug/14 19/Aug/14
W.L.L
Prequalification Document For Algosystems
0041 EXW-P023-0001-CS-JPL-PQ-00027 Utilities Subcontractor CA 1 18/Aug/14 4/Sep/14
Qatar W.L.L
Prequalification Document for Advanced
0042 EXW-P023-0001-CS-JPL-PQ-00028 Structures Supplier CA 1 26/Aug/14 1/Sep/14
Materials Co. LLC (AMC)
Prequalification Document for Isotech Ltd
0043 EXW-P023-0001-YE-JPL-PQ-00029 Preliminaries CA 18/Sep/14 28/Sep/14
Environmental Consultants
Prequalification Document for Isotech Ltd
0044 EXW-P023-0001-YE-JPL-PQ-00029 Preliminaries Subcontractor CB 2 13/Nov/14 16/Nov/14
Environmental Consultants
Prequalification Document for VSL Middle East
0045 EXW-P023-0001-MQ-JPL-PQ-00030 Structures CA 21/Sep/14 29/Sep/14
LLC
Comment Response Sheet for VSL Middle
0046 EXW-P023-0001-MQ-JPL-PQ-00030 Structures Subcontractor CB 2 8/Oct/14 12/Oct/14
East
Prequalification Document for ALCAT
0047 EXW-P023-0001-MQ-JPL-PQ-00031 Structures CA 14/Oct/14 21/Oct/14
Contracting Co. W.L.L.
Prequalification Document for ALCAT
0048 EXW-P023-0001-MQ-JPL-PQ-00031 Structures CB 29/Oct/14 5/Nov/14
Contracting Co. W.L.L.

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:15 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Prequalification Document for ALCAT
0049 EXW-P023-0001-MQ-JPL-PQ-00031 Structures CC 8/Nov/14 11/Nov/14
Contracting Co. W.L.L.
Prequalification Document for ALCAT
0050 EXW-P023-0001-MQ-JPL-PQ-00031 Structures Supplier CD 4 22/Nov/14 24/Nov/14
Contracting Co. W.L.L.

Prequalification Document for HASSANESCO


0051 EXW-P023-0001-CS-JPL-PQ-00032 Structures CA 14/Oct/14 22/Oct/14
Ready Mix Concrete W.L.L.

CRS for HASSANESCO Ready Mix Concrete


0052 EXW-P023-0001-CS-JPL-PQ-00032 Structures Supplier CB 2 9/Nov/14 11/Nov/14
W.L.L.
Prequalification Document for Middle East
0053 EXW-P023-0001-CS-JPL-PQ-00033 Structures CA 1 14/Oct/14 22/Oct/14
Reinforcement Co. W.L.L.
Comment Response Sheet for Middle East
0054 EXW-P023-0001-CS-JPL-PQ-00033 Structures Supplier 25/Oct/14 27/Oct/14
Reinforcement Co. W.L.L.
Prequalification Document for Middle Projects
0055 EXW-P023-0001-MQ-JPL-PQ-00034 Roads CA 14/Oct/14 21/Oct/14
& Plants Co.
Prequalification Document for Middle Projects
0056 EXW-P023-0001-MQ-JPL-PQ-00034 Roads Subcontractor CB 2 11/Dec/14 16/Dec/14
& Plants Co.
0057 EXW-P023-0001-SE-JPL-PQ-00035 Khalifa Steel Industries W.L.L. Structures Supplier CA 1 16/Oct/14 21/Oct/14
0058 EXW-P023-0001-EE-JPL-PQ-00036 Conspel Qatar W.L.L. Electrical CA 25/Oct/14 27/Oct/14
0059 EXW-P023-0001-EE-JPL-PQ-00036 Conspel Qatar W.L.L. Electrical Subcontractor CB 2 3/Nov/14 8/Nov/14
0060 EXW-P023-0001-SE-JPL-PQ-00037 DUTCH FOUNDATION Co. W.L.L. Structures CA 6/Nov/14 11/Nov/14
0061 EXW-P023-0001-SE-JPL-PQ-00037 DUTCH FOUNDATION Co. W.L.L. Structures Subcontractor CB 2 17/Nov/14 19/Nov/14

0062 EXW-P023-0001-SE-JPL-PQ-00038 TERRATEST QATAR LLC Structures Subcontractor CA 1 18/Nov/14 24/Nov/14

0063 EXW-P023-0001-MQ-JPL-PQ-00039 MBD Trading Contracting Transport Earthworks CA 20/Dec/14 29/Dec/14

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:16 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

0064 EXW-P023-0001-MQ-JPL-PQ-00039 MBD Trading Contracting Transport Earthworks Subcontractor CB 2 8/Jan/15 13/Jan/15

0065 EXW-P023-0001-CS-JPL-PQ-00040 RABBAN Readymix W.L.L. Structures CA 19/Jan/15 22/Jan/15

0066 EXW-P023-0001-CS-JPL-PQ-00040 RABBAN Readymix W.L.L. Structures Supplier CB 2 27/Jan/15 2/Feb/15

0067 EXW-P023-0001-MQ-JPL-PQ-00041 Al-Wakeel Trading & Contracting Earthworks CA 20/Jan/15 24/Jan/15


0068 EXW-P023-0001-MQ-JPL-PQ-00041 Al-Wakeel Trading & Contracting Earthworks CB 29/Jan/15 2/Feb/15
0069 EXW-P023-0001-MQ-JPL-PQ-00041 Al-Wakeel Trading & Contracting Earthworks Subcontractor CC 3 4/Feb/15 8/Feb/15
0070 EXW-P023-0001-MQ-JPL-PQ-00042 Sand And Rock Crushers (SARC) Earthworks Supplier CA 1 22/Jan/15 8/Feb/15
0071 EXW-P023-0001-MQ-JPL-PQ-00043 Saram Transport Earthworks CA 8/Feb/15 15/Feb/15

0072 EXW-P023-0001-MQ-JPL-PQ-00043 Saram Transport Earthworks Supplier CB 2 16/Apr/15 26/Apr/15

0073 EXW-P023-0001-MQ-JPL-PQ-00044 Gulf Consolidated Contractors W.L.L. Roads CA 8/Feb/15 16/Feb/15


0074 EXW-P023-0001-MQ-JPL-PQ-00044 Gulf Consolidated Contractors W.L.L. Roads Supplier CB 2 23/Feb/15 25/Feb/15
0075 EXW-P023-0001-MQ-JPL-PQ-00045 Aswan Trading & Contracting Co. W.L.L. Earthworks Subcontractor CA 1 15/Apr/15 21/Apr/15
0076 EXW-P023-0001-MQ-JPL-PQ-00046 Tensacciai Srl (TENSA) Structures Subcontractor CA 1 13/May/15 2/Jun/15
Bin Omran Engineering & Projects W.L.L.
0077 EXW-P023-0001-SG-JPL-PQ-00047 Roads Subcontractor CA 1 14/May/15 30/May/15
(Division of Bin Omran Group)
0078 EXW-P023-0001-SG-JPL-PQ-00048 BOOM Construction Company Roads Supplier CA 1 28/May/15 2/Jun/15
Fullbore Drilling & Lining W.L.L.,
0079 EXW-P023-0001-MQ-JPL-PQ-00049 Structures Subcontractor CA 1 13/Jun/15 28/Jun/15
Microtunneling

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:17 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
DOREX ENGINEERING
0080 EXW-P023-0001-EE-JPL-PQ-00050 Electrical Works, LV (415 V) & MV (11 KV) Electrical Subcontractor CA 1 7/Jul/15
Power Distribution Works
Electro Mechnacial Engineering Services Co.
0081 EXW-P023-0001-EE-JPL-PQ-00051 (EMESCO) (Subcontractor of Conspel Qatar Electrical Subcontractor CA 1 7/Jul/15 16/Jul/15
W.L.L.)
RIZZANI DE ECCHER S.P.A.
0082 EXW-P023-0001-SE-JPL-PQ-00052 General Contracting and Construction Structures Subcontractor CA 17/Aug/15
Company Operating Worldwide
RIZZANI DE ECCHER S.P.A.
0083 EXW-P023-0001-SE-JPL-PQ-00052 General Contracting and Construction Structures Subcontractor CB 2 20/Aug/15 23/Aug/15
Company Operating Worldwide

QATAR REINFORCEMENT COMPANY W.L.L


Supply of Deformed High Tensile Steel
0084 EXW-P023-0001-SE-JPL-PQ-00053 Structures Subcontractor CA 1 26/Oct/15 4/Nov/15
Reinforcement Cut & Bend and Machanical
Splicing System.

Plains Trading and Contracting Co.


0085 EXW-P023-0001-MQ-JPL-PQ-00054 Structures Subcontractor CA 1 26/Oct/15 3/Nov/15
Microtunneling works for TSE
Blue Steel Factory W.L.L
Supply of cut and bend steel reinforcing bars
0086 EXW-P023-0001-SE-JPL-PQ-00055 Structures Subcontractor CA 29/Oct/15 14/Nov/15
produced by QATAR STEEL and Bartec
Mechanical Couplers
Blue Steel Factory W.L.L
Supply of cut and bend steel reinforcing bars
0087 EXW-P023-0001-SE-JPL-PQ-00055 Structures Subcontractor CB 2 26/Nov/15 2/Dec/15
produced by QATAR STEEL and Bartec
Mechanical Couplers

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:18 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Desert Diamond Contracting


0088 EXW-P023-0001-MQ-JPL-PQ-00056 Structures Subcontractor CA 8/Nov/15 17/Nov/15
Microtunneling works for TSE

Desert Diamond Contracting


0089 EXW-P023-0001-MQ-JPL-PQ-00056 Structures Subcontractor CB 2 9/Dec/15 13/Dec/15
Microtunneling works for TSE

Structural testing laboratory Bochum for bridge


0090 EXW-P023-0001-CS-JPL-PQ-00057 bearing testing.by RUHR-UNIVERSITY Structures Subcontractor CA 10/Nov/15 24/Nov/15
BOCHUM - (GERMANY)

Structural testing laboratory Bochum for bridge


0091 EXW-P023-0001-CS-JPL-PQ-00057 bearing testing.by RUHR-UNIVERSITY Structures Subcontractor CB 2/Dec/15 16/Dec/15
BOCHUM - (GERMANY)

Structural testing laboratory Bochum for bridge


0092 EXW-P023-0001-CS-JPL-PQ-00057 bearing testing.by RUHR-UNIVERSITY Structures Subcontractor CC 3 24/Dec/15 26/Dec/15
BOCHUM - (GERMANY)

LV (415 V) & MV (11 KV) Power Distribution


0093 EXW-P023-0001-EE-JPL-PQ-00058 Electrical Subcontractor CA 17/Nov/15 25/Nov/15
Works by POWER LINKS QATAR L.L.C.
LV (415 V) & MV (11 KV) Power Distribution
0094 EXW-P023-0001-EE-JPL-PQ-00058 Electrical Subcontractor CB 2 9-Dec-15 13/Dec/15
Works by POWER LINKS QATAR L.L.C.
FUGRO PENINSULAR WLL
0095 EXW-P023-0001-CE-JPL-PQ-00059 Roads Subcontractor CA 1 9-Dec-15 10/Dec/15
International Roughness Index (IRI)

EMIRATES CONCRETE & STEEL COATING


WORKS W.L.L (EMCON)
0096 EXW-P023-0001-MQ-JPL-PQ-00060 Priliminaries Subcontractor CA 1 24-Dec-15 29/Dec/15
Applicators for Protective Treatments to
Concrete - Anti Carbonation Coating

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:19 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Midwil Trading Inc.


0097 EXW-P023-0001-SR-JPL-PQ-00061 Priliminaries Subcontractor CA 1 27/Dec/15 31/Dec/15
Installation of Crash Barriers

AL-MOHSEN ENGINEERING CO.


Operating Crusher, Blending Plant and
0098 EXW-P023-0001-MQ-JPL-PQ-00062 Batching Plant,Aggregate, Sub Base, Road Priliminaries Subcontractor CA 10/Jan/16 17/Jan/16
Base and Back Fill Material,(Used for Road
Construction)

AL-MOHSEN ENGINEERING CO.


Operating Crusher, Blending Plant and
0099 EXW-P023-0001-MQ-JPL-PQ-00062 Batching Plant,Aggregate, Sub Base, Road Priliminaries Subcontractor CB 2 31/Jan/16 7/Feb/16
Base and Back Fill Material,(Used for Road
Construction)

TADMUR ROOFS & POOLS W.L.L


0100 EXW-P023-0001-MQ-JPL-PQ-00063 Applicators for Protective Treatments to Priliminaries Subcontractor CA 1 16/Jan/16 23/Jan/16
Concrete - Anti Carbonation Coating

AL ZAAROUR TRADING & CONTRACTING


CO.
0101 EXW-P023-0001-MQ-JPL-PQ-00064 Priliminaries Subcontractor CA 1 18/Jan/16 23/Jan/16
Applicators for Protective Treatments to
Concrete - Anti Carbonation Coating

ELECTRO INDUSTRIES - QATAR


0102 EXW-P023-0001-SR-JPL-PQ-00065 Priliminaries Subcontractor CA 1 19/Jan/16 23/Jan/16
Installation of Steel Guardrails

REDCO-CICON W.L.L
Supply of cut and bend steel reinforcing bars
0103 EXW-P023-0001-SE-JPL-PQ-00066 Structures Subcontractor CA 1 27/Jan/16 30/Jan/16
produced by QATAR STEEL,and Bartec
Mechanical Couplers

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:20 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
REDCO-CICON W.L.L
Supply of cut and bend steel reinforcing bars
0104 EXW-P023-0001-SE-JPL-PQ-00066 Structures Subcontractor CB 2 8/Feb/16 11/Feb/16
produced by QATAR STEEL,and Bartec
Mechanical Couplers
GIFFIN TRAFFIKS L.L.C
0105 EXW-P023-0001-IC-JPL-PQ-00067 Over Head Sign Gantries and Cantilever Roads Subcontractor CA 1 31/Jan/16 6/Feb/16
structures
KHALIFA STEEL INDUSTRIES W.L.L
0106 EXW-P023-0001-SE-JPL-PQ-00068 Supply of cut and bend steel reinforcing bars Structures Subcontractor CA 1 1/Feb/16 11/Feb/16
produced by EMIRATES STEEL
MOKASCO EXPRESS CO.
Supply of cut and bend steel reinforcing bars
0107 EXW-P023-0001-SE-JPL-PQ-00069 Structures Subcontractor CA 1 6/Feb/16 11/Feb/16
produced by QATAR STEEL,and Bartec
Mechanical Couplers
GULF TUNNELING
0108 EXW-P023-0001-MQ-JPL-PQ-00070 Structures Subcontractor CA 1 14/Feb/16
Horizontal Drilling
ELECTRO INDUSTRIES
0109 EXW-P023-0001-IC-JPL-PQ-00071 Over Head Sign Gantries and Cantilever Structures Subcontractor CA 1 16/Feb/16
structures
INTERNATIONAL DRILLING GROUP (IDG)
0110 EXW-P023-0001-MQ-JPL-PQ-00072 Utilities Subcontractor CA 1 18/Feb/16
Horizontal Directional Drilling

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:21 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:22 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:23 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:24 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:25 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:26 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:27 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:28 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)

Received
Submitted to
Date from
AECOM
AECOM

Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:29 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

DOH-EPG-TRA-LTR-YDB-Y14-00051
4 W

1 W DOH-EPG-TRA-LTR-YDB-14-00053

Rev. CC also Code 'B' through Aecom


4 B response letter ref: DOH-EPG-TRA-CSR-
Y14-00002 dated 24 February, 2014.

1 B
DOH-EPG-TRA-CSR-Y14-00002
DOH-EPG-TRA-LTR-YDB-Y14-00263

1 I DOH-EPG-TRA-LTR-YDB-Y14-00054

37 A DOH-EPG-TRA-LTR-YDB-Y14-00264

21 A DOH-EPG-TRA-LTR-YDB-Y14-00264

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:30 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

147 A EXW-P023-0001-QM-AEC-LT-1286

36 A EXW-P023-0001-PE-KBR-LT-16916

52 A EXW-P023-0001-PE-KBR-LT-16916

52 A EXW-P023-0001-PE-KBR-LT-16916

DOH-EPG-TRA-LTR-YDB-Y14-00296
33 A
DOH-EPG-TRA-LTR-YDB-Y14-000321

UR

41 W DOH-EPG-TRA-LTR-YDB-Y14-00353

EXW-P023-0001-PW-AEC-TN-00003
32 B
EXW-P023-0001-CM-AEC-LT-00603

600 UR

600 UR

0 I

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:31 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

46 A EXW-P023-0001-CM-AEC-LT-00601

18 W EXW-P023-0001-CM-AEC-TN-00006

EXW-P023-0001-CM-AEC-LT-01229
EXW-P023-0001-QM-AEC-LT-03911
133 B
AECOM Extend Conditional Approval for
another 3 Months

38 A EXW-P023-0001-QM-AEC-LT-00594

18 W EXW-P023-0001-CM-AEC-TN-00005

13 B EXW-P023-0001-CM-AEC-LT-01232

10 A EXW-P023-0001-QM-AEC-LT-02431

22 W EXW-P023-0001-CM-AEC-TN-00014

EXW-P023-0001-CM-AEC-LT-001231
EXW-P023-0001-QM-AEC-LT-03910
133 B
AECOM Extend Conditional Approval for
another 3 Months

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:32 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

40 A EXW-P023-0001-CM-AEC-LT-00605

33 A EXW-P023-0001-CM-AEC-LT-00606

12 W EXW-P023-0001-QM-AEC-TN-00018

255 A EXW-P023-0001-AL-AEC-LT-07281

25 A EXW-P023-0001-QM-AEC-LT-00595

25 A EXW-P023-0001-QM-AEC-LT-00596

3 W EXW-P023-0001-CS-AEC-TN-00038

4 A EXW-P023-0001-PW-AEC-LT-00602

19 W EXW-P023-0001-CS-AEC-TN-00063

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:33 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

9 A EXW-P023-0001-QM-AEC-TN-00102

7 A EXW-P023-0001-QM-AEC-LT-01418

2 A EXW-P023-0001-QM-AEC-LT-01341

2 A EXW-P023-0001-QM-AEC-LT-01342

7 A EXW-P023-0001-QM-AEC-LT-01419

17 A EXW-P023-0001-QM-AEC-LT-01774

6 A EXW-P023-0001-QM-AEC-LT-01628

10 W EXW-P023-0001-CS-AEC-TN-00174

3 W EXW-P023-0001-CS-AEC-TN-03402

8 B EXW-P023-0001-CM-AEC-TN-000191

4 A EXW-P023-0001-CM-AEC-TN-00217

7 B EXW-P023-0001-QM-AEC-TN-00253

7 B EXW-P023-0001-QM-AEC-TN-02925

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:34 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

3 B EXW-P023-0001-QM-AEC-TN-03239

2 A EXW-P023-0001-CS-AEC-TN-03625

8 W EXW-P023-0001-QM-AEC-TN-00255

2 B EXW-P023-0001-QM-AEC-TN-03292

8 B EXW-P023-0001-QM-AEC-TN-00257

2 A EXW-P023-0001-CM-AEC-TN-00262

7 W EXW-P023-0001-QM-AEC-TN-00246

5 B EXW-P023-0001-MQ-AEC-TN-04129

5 W EXW-P023-0001-QM-AEC-TN-00245
2 W EXW-P023-0001-MQ-AEC-TN-00264
5 A EXW-P023-0001-MQ-AEC-TN-03217
5 B EXW-P023-0001-QM-AEC-TN-03291
2 A EXW-P023-0001-SE-AEC-TN-03492

6 W EXW-P023-0001-SE-AEC-TN-03624

9 B EXW-P023-0001-SE-AEC-TN-04512

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:35 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

5 A EXW-P023-0001-SE-AEC-TN-04862

3 B EXW-P023-0001-CS-AEC-TN-05161

6 B EXW-P023-0001-CS-AEC-TN-05562

4 B EXW-P023-0001-CS-AEC-TN-05208
4 B EXW-P023-0001-SE-AEC-TN-05564
4 A EXW-P023-0001-SE-AEC-TN-05731
17 B EXW-P023-0001-SE-AEC-TN-05730
7 W EXW-P023-0001-SE-AEC-TN-05913

10 B EXW-P023-0001-MQ-AEC-TN-08972

8 B EXW-P023-0001-SE-AEC-TN-05949
2 A EXW-P023-0001-SE-AEC-TN-06433
6 B EXW-P023-0001-MQ-AEC-TN-08678
20 W EXW-P023-0001-QM-AEC-TN-10814

16 A EXW-P023-0001-SG-AEC-LT-10596

5 A EXW-P023-0001-SG-AEC-LT-10825

15 W EXW-P023-0001-QM-AEC-TN-11919

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:36 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

EXW-P023-0001-EE-AEC-LT-14433
228 UR
(Information Only)

9 A EXW-P023-0001-SG-AEC-LT-12770

187 UR

3 A EXW-P023-0001-SE-AEC-LT-14478

9 A EXW-P023-0001-SE-AEC-LT-18354

8 W EXW-P023-0001-CS-AEC-TN-18258

16 B EXW-P023-0001-SE-AEC-TN-18857

6 A EXW-P023-0001-SE-AEC-TN-19899

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:37 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

9 W EXW-P023-0001-QM-AEC-TN-19012

4 B EXW-P023-0001-MQ-AEC-TN-20554

14 B EXW-P023-0001-CS-AEC-TN-19439

EXW-P023-0001-CS-AEC-TN-20914
14 B (EXW-P023-0001-CM-AEC-LT-21093
Information)

0 A EXW-P023-0001-CS-AEC-TN-21310

8 W EXW-P023-0001-EE-AEC-TN-19515

4 B EXW-P023-0001-EE-AEC-TN-20596

1 A EXW-P023-0001-CE-AEC-LT-20451

5 A EXW-P023-0001-MQ-AEC-TN-21499

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:38 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

4 W EXW-P023-0001-SR-AEC-TN-21573

7 W EXW-P023-0001-MQ-AEC-TN-22299

7 B EXW-P023-0001-MQ-AEC-TN-23377

7 A EXW-P023-0001-QM-AEC-TN-22606

5 B EXW-P023-0001-QM-AEC-TN-22607

4 A EXW-P023-0001-QM-AEC-TN-22609

3 B EXW-P023-0001-SE-AEC-TN-23014

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:39 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

3 A EXW-P023-0001-SE-AEC-TN-23610

6 A EXW-P023-0001-IC-AEC-TN-23327

10 W EXW-P023-0001-SE-AEC-TN-23643

5 B EXW-P023-0001-SE-AEC-TN-23644

UR

UR

UR

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:40 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:41 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:42 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:43 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:44 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:45 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:46 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:47 of 48
O ORBITAL HIGHWAY

Data Date: 20/Feb/16

Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR

Review Review
Period (days) Code

Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:48 of 48

You might also like