Professional Documents
Culture Documents
Companies and Mail ID
Companies and Mail ID
Companies and Mail ID
com
AECOM tim.baker@aecom.com Imperial.Yap@kbr.com
AL JABER info@jabmak.com
ALCAT www.ammann-group.com nabeel.modathikundan@hlgjec-noh3.com
Algosystem linda.salhah@trafficonsult.com linda.salhah@trafficonsult.com
Bin omran Binomran@qatar.net.qa
CONSPEL info@intertectraqatar.com AlexSahyoun@algosystems.gr
ftp://qd-cpc.com username: nafftp lambri@engineer.com
password : nafusr910
Asqhal salmuhannadi@asghal.gov.qa
QNBN nazhar@qnbn.qa
Rizzani Rizzani@qatar.net.qa
AL-MOHSEN ENGINEERING
CO.
Operating Crusher, Blending
Plant and Batching
Plant,Aggregate, Sub Base,
Road Base and Back Fill
Material,(Used for Road
Construction)
ELECTRO INDUSTRIES -
QATAR
Installation of Steel Guardrails
REDCO-CICON W.L.L
Supply of cut and bend steel
reinforcing bars produced by
QATAR STEEL,and Bartec
Mechanical Couplers
REDCO-CICON W.L.L
Supply of cut and bend steel
reinforcing bars produced by
QATAR STEEL,and Bartec
Mechanical Couplers
GIFFIN TRAFFIKS L.L.C
Over Head Sign Gantries and
Cantilever structures
KHALIFA STEEL INDUSTRIES
W.L.L
Supply of cut and bend steel
reinforcing bars produced by
EMIRATES STEEL
MOKASCO EXPRESS CO.
Supply of cut and bend steel
reinforcing bars produced by
QATAR STEEL,and Bartec
Mechanical Couplers
GULF TUNNELING
Horizontal Drilling
ELECTRO INDUSTRIES
Over Head Sign Gantries and
Cantilever structures
INTERNATIONAL DRILLING
GROUP (IDG)
Horizontal Directional Drilling
j.maina@anas.com.qa h.bahia @anas.com.qa
dan@hlgjec-noh3.com
motasem@trafficonsult.com Wilson.Craig@aecom.com Raed.Al-Ramahi@hlgjec-noh3.com
Hazem.Elgharib@kbr.com
pgroup.com
ollapragada@wspgroup.com
@wspgroup.com
yadarshana@wspgroup.com
andp-group.com
Ramahi@hlgjec-noh3.com Ayman.Ashry@hlgjec-noh3.com
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Prequalification Document For Gulf Colours
0008 EXW-P023-0001-CS-JPL-PQ-00004 WLL (Photography Services, Digital Preliminaries Subcontractor CA 1 16/Mar/14 10/Aug/14
Videography, Light & Sound Equipments)
Prequalification Document For Parsons
0009 EXW-P023-0001-CS-JPL-PQ-00005 International Limited (Category 3, Design Structures Subcontractor CA 1 24/Mar/14 29/Apr/14
Verification)
Prequalification Document For Buro Happold
0010 EXW-P023-0001-CS-JPL-PQ-00006 Structures Subcontractor CA 1 8/Mar/14 29/Apr/14
(Category 3, Design Verification)
Prequalification Document For Salfo &
0011 EXW-P023-0001-CS-JPL-PQ-00007 Associates SA (Category 3, Design Structures Subcontractor CA 1 8/Mar/14 29/Apr/14
Verification)
Prequalification Document For Advanced
0012 EXW-P023-0001-CS-JPL-PQ-00008 Construction Technology Services (ACTS) Structures Subcontractor CA 9/Apr/14 12/May/14
(Getechnical Investigation)
Prequalification Document For Advanced
0013 EXW-P023-0001-CS-JPL-PQ-00008 Construction Technology Services (ACTS) Structures Subcontractor CA 2 15/02/2016
(Getechnical Investigation)
Prequalification Document For WSP (Multi
0013 EXW-P023-0001-CS-JPL-PQ-00009 Structures Subcontractor CA 1 14/May/14 24/Jun/14
Disciplinary Engineering Consultancy)
Prequalification Document For National
0014 EXW-P023-0001-CS-JPL-PQ-00010 Contracting Company Limited (EHV Power Electrical CA 25/May/14 26/Jun/14
Line Works)
Transmittal Advise: CRS for Subcontractor
0015 EXW-P023-0001-PW-AEC-TN-00003 Electrical Subcontractor 30/Jun/14
Approval M/s. NCC
0016 EXW-P023-0001-EE-JPL-PQ-00010 Compliance Form for NCC Electrical Subcontractor CA 30/Jun/14
Documents Proving NCC Approval From
0017 Additional Documents for Kahramaa Electrical 30/Jun/14 30/Jun/14
Kahramaa (9 Documents)
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:12 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Prequalification Document For Astel
0018 EXW-P023-0001-CS-JPL-PQ-00011 Structures Subcontractor CA 1 8/Jun/14 24/Jul/14
Intertectra JV (Waterproofing)
Prequalification Document For Qatar Alpha
0019 EXW-P023-0001-CS-JPL-PQ-00012 Structures CA 8/Jun/14 26/Jun/14
Beton (Supply of Readymix Concrete)
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:13 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Prequalification Document For Bin Al Sheikh
0027 EXW-P023-0001-CS-JPL-PQ-00016 Rebar Factory (Supply Cut and and Bend Structures Supplier CA 1 14/Jun/14 24/Jul/14
Steel Reinforcement)
Prequalification Document For Qatar Steel
0028 EXW-P023-0001-CS-JPL-PQ-00017 Company (Q.S.C) (Supply Cut and Bend Steel Structures Supplier CA 21/Jun/14 24/Jul/14
Reinforcement)
Prequalification Document For Garden House Landscape &
0029 EXW-P023-0001-CS-JPL-PQ-00018 CA 2 21/Jun/14 3/Jul/14
Center (Landscaping & Horicultural) Irrigation
Prequalification Document For Garden House Landscape &
0030 EXW-P023-0001-CS-JPL-PQ-00018 Subcontractor CB 2 5/Jul/14 17/Mar/15
Center (Landscaping & Horicultural) Irrigation
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:14 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Prequlaification Document For QD- CPC
0036 EXW-P023-0001-CS-JPL-PQ-00022 Premco Precast Qatar (Manufacturer of Structures Supplier CB 2 19/Aug/14 28/Aug/14
Precast)
Prequalification Document For Sodamco
0037 EXW-P023-0001-CS-JPL-PQ-00023 Structures Supplier CA 1 12/Aug/14 19/Aug/14
Weber Qatar W.L.L
Prequalification Document For Arab Center For
0038 EXW-P023-0001-CS-JPL-PQ-00024 Preliminaries Subcontractor CA 1 12/Aug/14 14/Aug/14
Engineering Studies
Prequalification Document For Exova Qatar
0039 EXW-P023-0001-CS-JPL-PQ-00025 Preliminaries Subcontractor CA 1 12/Aug/14 14/Aug/14
LLC
Prequalification Document For BMC Qatar
0040 EXW-P023-0001-CS-JPL-PQ-00026 Structures Supplier CA 1 12/Aug/14 19/Aug/14
W.L.L
Prequalification Document For Algosystems
0041 EXW-P023-0001-CS-JPL-PQ-00027 Utilities Subcontractor CA 1 18/Aug/14 4/Sep/14
Qatar W.L.L
Prequalification Document for Advanced
0042 EXW-P023-0001-CS-JPL-PQ-00028 Structures Supplier CA 1 26/Aug/14 1/Sep/14
Materials Co. LLC (AMC)
Prequalification Document for Isotech Ltd
0043 EXW-P023-0001-YE-JPL-PQ-00029 Preliminaries CA 18/Sep/14 28/Sep/14
Environmental Consultants
Prequalification Document for Isotech Ltd
0044 EXW-P023-0001-YE-JPL-PQ-00029 Preliminaries Subcontractor CB 2 13/Nov/14 16/Nov/14
Environmental Consultants
Prequalification Document for VSL Middle East
0045 EXW-P023-0001-MQ-JPL-PQ-00030 Structures CA 21/Sep/14 29/Sep/14
LLC
Comment Response Sheet for VSL Middle
0046 EXW-P023-0001-MQ-JPL-PQ-00030 Structures Subcontractor CB 2 8/Oct/14 12/Oct/14
East
Prequalification Document for ALCAT
0047 EXW-P023-0001-MQ-JPL-PQ-00031 Structures CA 14/Oct/14 21/Oct/14
Contracting Co. W.L.L.
Prequalification Document for ALCAT
0048 EXW-P023-0001-MQ-JPL-PQ-00031 Structures CB 29/Oct/14 5/Nov/14
Contracting Co. W.L.L.
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:15 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Prequalification Document for ALCAT
0049 EXW-P023-0001-MQ-JPL-PQ-00031 Structures CC 8/Nov/14 11/Nov/14
Contracting Co. W.L.L.
Prequalification Document for ALCAT
0050 EXW-P023-0001-MQ-JPL-PQ-00031 Structures Supplier CD 4 22/Nov/14 24/Nov/14
Contracting Co. W.L.L.
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:16 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
0064 EXW-P023-0001-MQ-JPL-PQ-00039 MBD Trading Contracting Transport Earthworks Subcontractor CB 2 8/Jan/15 13/Jan/15
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:17 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
DOREX ENGINEERING
0080 EXW-P023-0001-EE-JPL-PQ-00050 Electrical Works, LV (415 V) & MV (11 KV) Electrical Subcontractor CA 1 7/Jul/15
Power Distribution Works
Electro Mechnacial Engineering Services Co.
0081 EXW-P023-0001-EE-JPL-PQ-00051 (EMESCO) (Subcontractor of Conspel Qatar Electrical Subcontractor CA 1 7/Jul/15 16/Jul/15
W.L.L.)
RIZZANI DE ECCHER S.P.A.
0082 EXW-P023-0001-SE-JPL-PQ-00052 General Contracting and Construction Structures Subcontractor CA 17/Aug/15
Company Operating Worldwide
RIZZANI DE ECCHER S.P.A.
0083 EXW-P023-0001-SE-JPL-PQ-00052 General Contracting and Construction Structures Subcontractor CB 2 20/Aug/15 23/Aug/15
Company Operating Worldwide
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:18 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:19 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
REDCO-CICON W.L.L
Supply of cut and bend steel reinforcing bars
0103 EXW-P023-0001-SE-JPL-PQ-00066 Structures Subcontractor CA 1 27/Jan/16 30/Jan/16
produced by QATAR STEEL,and Bartec
Mechanical Couplers
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:20 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
REDCO-CICON W.L.L
Supply of cut and bend steel reinforcing bars
0104 EXW-P023-0001-SE-JPL-PQ-00066 Structures Subcontractor CB 2 8/Feb/16 11/Feb/16
produced by QATAR STEEL,and Bartec
Mechanical Couplers
GIFFIN TRAFFIKS L.L.C
0105 EXW-P023-0001-IC-JPL-PQ-00067 Over Head Sign Gantries and Cantilever Roads Subcontractor CA 1 31/Jan/16 6/Feb/16
structures
KHALIFA STEEL INDUSTRIES W.L.L
0106 EXW-P023-0001-SE-JPL-PQ-00068 Supply of cut and bend steel reinforcing bars Structures Subcontractor CA 1 1/Feb/16 11/Feb/16
produced by EMIRATES STEEL
MOKASCO EXPRESS CO.
Supply of cut and bend steel reinforcing bars
0107 EXW-P023-0001-SE-JPL-PQ-00069 Structures Subcontractor CA 1 6/Feb/16 11/Feb/16
produced by QATAR STEEL,and Bartec
Mechanical Couplers
GULF TUNNELING
0108 EXW-P023-0001-MQ-JPL-PQ-00070 Structures Subcontractor CA 1 14/Feb/16
Horizontal Drilling
ELECTRO INDUSTRIES
0109 EXW-P023-0001-IC-JPL-PQ-00071 Over Head Sign Gantries and Cantilever Structures Subcontractor CA 1 16/Feb/16
structures
INTERNATIONAL DRILLING GROUP (IDG)
0110 EXW-P023-0001-MQ-JPL-PQ-00072 Utilities Subcontractor CA 1 18/Feb/16
Horizontal Directional Drilling
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:21 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:22 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:23 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:24 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:25 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:26 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:27 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:28 of 48
NEW ORBITAL HIGHWAY & TRUCK ROUTE - PROJECT 023 C1 - NEW DOHA PORT TO ORBITA
SUBCONTRACTOR APPROVAL (SCA)
Received
Submitted to
Date from
AECOM
AECOM
Received
Sl. Subcontractor No. of Submitted to
Document No. Description Discipline Rev. Date from
No. / Supplier Times AECOM
AECOM
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:29 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
DOH-EPG-TRA-LTR-YDB-Y14-00051
4 W
1 W DOH-EPG-TRA-LTR-YDB-14-00053
1 B
DOH-EPG-TRA-CSR-Y14-00002
DOH-EPG-TRA-LTR-YDB-Y14-00263
1 I DOH-EPG-TRA-LTR-YDB-Y14-00054
37 A DOH-EPG-TRA-LTR-YDB-Y14-00264
21 A DOH-EPG-TRA-LTR-YDB-Y14-00264
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:30 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
147 A EXW-P023-0001-QM-AEC-LT-1286
36 A EXW-P023-0001-PE-KBR-LT-16916
52 A EXW-P023-0001-PE-KBR-LT-16916
52 A EXW-P023-0001-PE-KBR-LT-16916
DOH-EPG-TRA-LTR-YDB-Y14-00296
33 A
DOH-EPG-TRA-LTR-YDB-Y14-000321
UR
41 W DOH-EPG-TRA-LTR-YDB-Y14-00353
EXW-P023-0001-PW-AEC-TN-00003
32 B
EXW-P023-0001-CM-AEC-LT-00603
600 UR
600 UR
0 I
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:31 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
46 A EXW-P023-0001-CM-AEC-LT-00601
18 W EXW-P023-0001-CM-AEC-TN-00006
EXW-P023-0001-CM-AEC-LT-01229
EXW-P023-0001-QM-AEC-LT-03911
133 B
AECOM Extend Conditional Approval for
another 3 Months
38 A EXW-P023-0001-QM-AEC-LT-00594
18 W EXW-P023-0001-CM-AEC-TN-00005
13 B EXW-P023-0001-CM-AEC-LT-01232
10 A EXW-P023-0001-QM-AEC-LT-02431
22 W EXW-P023-0001-CM-AEC-TN-00014
EXW-P023-0001-CM-AEC-LT-001231
EXW-P023-0001-QM-AEC-LT-03910
133 B
AECOM Extend Conditional Approval for
another 3 Months
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:32 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
40 A EXW-P023-0001-CM-AEC-LT-00605
33 A EXW-P023-0001-CM-AEC-LT-00606
12 W EXW-P023-0001-QM-AEC-TN-00018
255 A EXW-P023-0001-AL-AEC-LT-07281
25 A EXW-P023-0001-QM-AEC-LT-00595
25 A EXW-P023-0001-QM-AEC-LT-00596
3 W EXW-P023-0001-CS-AEC-TN-00038
4 A EXW-P023-0001-PW-AEC-LT-00602
19 W EXW-P023-0001-CS-AEC-TN-00063
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:33 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
9 A EXW-P023-0001-QM-AEC-TN-00102
7 A EXW-P023-0001-QM-AEC-LT-01418
2 A EXW-P023-0001-QM-AEC-LT-01341
2 A EXW-P023-0001-QM-AEC-LT-01342
7 A EXW-P023-0001-QM-AEC-LT-01419
17 A EXW-P023-0001-QM-AEC-LT-01774
6 A EXW-P023-0001-QM-AEC-LT-01628
10 W EXW-P023-0001-CS-AEC-TN-00174
3 W EXW-P023-0001-CS-AEC-TN-03402
8 B EXW-P023-0001-CM-AEC-TN-000191
4 A EXW-P023-0001-CM-AEC-TN-00217
7 B EXW-P023-0001-QM-AEC-TN-00253
7 B EXW-P023-0001-QM-AEC-TN-02925
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:34 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
3 B EXW-P023-0001-QM-AEC-TN-03239
2 A EXW-P023-0001-CS-AEC-TN-03625
8 W EXW-P023-0001-QM-AEC-TN-00255
2 B EXW-P023-0001-QM-AEC-TN-03292
8 B EXW-P023-0001-QM-AEC-TN-00257
2 A EXW-P023-0001-CM-AEC-TN-00262
7 W EXW-P023-0001-QM-AEC-TN-00246
5 B EXW-P023-0001-MQ-AEC-TN-04129
5 W EXW-P023-0001-QM-AEC-TN-00245
2 W EXW-P023-0001-MQ-AEC-TN-00264
5 A EXW-P023-0001-MQ-AEC-TN-03217
5 B EXW-P023-0001-QM-AEC-TN-03291
2 A EXW-P023-0001-SE-AEC-TN-03492
6 W EXW-P023-0001-SE-AEC-TN-03624
9 B EXW-P023-0001-SE-AEC-TN-04512
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:35 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
5 A EXW-P023-0001-SE-AEC-TN-04862
3 B EXW-P023-0001-CS-AEC-TN-05161
6 B EXW-P023-0001-CS-AEC-TN-05562
4 B EXW-P023-0001-CS-AEC-TN-05208
4 B EXW-P023-0001-SE-AEC-TN-05564
4 A EXW-P023-0001-SE-AEC-TN-05731
17 B EXW-P023-0001-SE-AEC-TN-05730
7 W EXW-P023-0001-SE-AEC-TN-05913
10 B EXW-P023-0001-MQ-AEC-TN-08972
8 B EXW-P023-0001-SE-AEC-TN-05949
2 A EXW-P023-0001-SE-AEC-TN-06433
6 B EXW-P023-0001-MQ-AEC-TN-08678
20 W EXW-P023-0001-QM-AEC-TN-10814
16 A EXW-P023-0001-SG-AEC-LT-10596
5 A EXW-P023-0001-SG-AEC-LT-10825
15 W EXW-P023-0001-QM-AEC-TN-11919
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:36 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
EXW-P023-0001-EE-AEC-LT-14433
228 UR
(Information Only)
9 A EXW-P023-0001-SG-AEC-LT-12770
187 UR
3 A EXW-P023-0001-SE-AEC-LT-14478
9 A EXW-P023-0001-SE-AEC-LT-18354
8 W EXW-P023-0001-CS-AEC-TN-18258
16 B EXW-P023-0001-SE-AEC-TN-18857
6 A EXW-P023-0001-SE-AEC-TN-19899
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:37 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
9 W EXW-P023-0001-QM-AEC-TN-19012
4 B EXW-P023-0001-MQ-AEC-TN-20554
14 B EXW-P023-0001-CS-AEC-TN-19439
EXW-P023-0001-CS-AEC-TN-20914
14 B (EXW-P023-0001-CM-AEC-LT-21093
Information)
0 A EXW-P023-0001-CS-AEC-TN-21310
8 W EXW-P023-0001-EE-AEC-TN-19515
4 B EXW-P023-0001-EE-AEC-TN-20596
1 A EXW-P023-0001-CE-AEC-LT-20451
5 A EXW-P023-0001-MQ-AEC-TN-21499
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:38 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
4 W EXW-P023-0001-SR-AEC-TN-21573
7 W EXW-P023-0001-MQ-AEC-TN-22299
7 B EXW-P023-0001-MQ-AEC-TN-23377
7 A EXW-P023-0001-QM-AEC-TN-22606
5 B EXW-P023-0001-QM-AEC-TN-22607
4 A EXW-P023-0001-QM-AEC-TN-22609
3 B EXW-P023-0001-SE-AEC-TN-23014
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:39 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
3 A EXW-P023-0001-SE-AEC-TN-23610
6 A EXW-P023-0001-IC-AEC-TN-23327
10 W EXW-P023-0001-SE-AEC-TN-23643
5 B EXW-P023-0001-SE-AEC-TN-23644
UR
UR
UR
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:40 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:41 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:42 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:43 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:44 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:45 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:46 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:47 of 48
O ORBITAL HIGHWAY
Review Review
Period (days) Code
30/Dec/99
30/Dec/99
UR
Review Review
Period (days) Code
Legend: A) Approved B) Accepted with comments W) Rejected/Wrong I) Acknowledge Iinformation UR) Under Review / Response: Over Due Page:48 of 48