Professional Documents
Culture Documents
4 Main Electrical Loads
4 Main Electrical Loads
4 Main Electrical Loads
1. Small power (mcb to load and rccb before mcb) for electrical side just until receptacle of 13A or
15A. from sso to equipment are using rectifier from ac to dc such as phone charger or other
stuff.
Mcb has magnetic part and heat part. Two trigger.
2. Lighting- 1 gang 1 circuit 2 or more circuits can be one mcb if not overload.
2.1 E-WL (external wall light) David Chia relex light.
2.2 I-lights (internal ceiling light)—length to follow gypsum false ceiling of 1200mm or 600mm
(same for grilles aircon ducting system).
3. Motor (fans, pumps) PnS pumps normally at basement or rooftop.
4. Isolators
CCTV
PA
SCV Testing
Engineering
1. Schematics
1.1 to know the controller and its location
1.2 to know the number of end to end devices and its cable types.
1.3 Sourcetransmissionloads
1. 消防電(elv)
Inputs or triggerers
1.1 smoke detectors
1.2 heat detectors
outputs
at FCC
2. 消防水
2.1 sprinkler heads (triggerer)
concealed and exposed(pendant)
3. Fire Extinguisher plan
1. Modes or Situations
1.1 Blackout situation which systems are operating. Emergency light, genset
1.2 Fire situation which systems are operating. Inputs (random trigger check) and outputs
(audio and visual alarm)
1.3 Lightning protection installation check.
1.4 Public Announcement system check.
1.5 PWD system functional check.
1.6 RI inspector mostly mechanical PE.
Concealed conduits to use PVC type as they are easier to bend as casting schedule is very tight.
Megger Test – Open circuit test. To get as high ohmage as possible to show not crossed to another
cable.
Lamp post J bolt and marking using tape of red and white at site.
After piling works, block cubes of concrete are stacked up on the pile to test the load handling integrity
of the pile.
Moment of inertia concept is used in the tower crane application as the stack of concrete at the end is
used as counter balance.
Lightning Protection
3 elements of fire
1. fuel
2. oxygen
3. spark
American Wire Gauge cables the higher the number the smaller the size.
Underground cables for hdb are laid along streets with manholes for maintenance.
Tabulation of Fire Services detector spacing. Category of corridor and other areas.
1. Heat detector
2. Smoke detector
3. Heat & smoke detector
4. Beam detector
4.1 Infrared
4.2 3600 type
E procurement.
Idea in shinryo.
Main con needs to know subcon salary payment and LTA or BCA came out with SOR[ schedule of rates].
Next naviswork [Virtual Reality of Autodesk]. Get the feel of real building even before it is constructed.
New ISH
1. Utility room
2. Below basketball court
3. Above sports hall.
ACMV Shinryo
1. Ducting/ MV fans installation- subcon Yong Chan/ Jackly…MV fans mostly using ducting
therefore MV fans are installed by ducting contractor.
Plenum—to join 2 or more duct ends [for piping it is called header].
Duct Return system for no ceiling area.
Room Return system for area with RCP normally.
2. Piping/ FCU/ AHU installation –subcon Siang Hoe… Air Conditioning equipment are installed by
them since MV is done by Ducting contractors.
3. Jacketting or insulation for piping- subcon MPW
4. Jacketing for ducting and cladding- in HK they do that
5. CPR piping- MFI
6. Cooling tower - Hydropower
7. Panel supplier – Gathergates
8. BMS- Azbil
1. Fire
2. Sound
Prelim Construction used my ideas when i am in shinryo.. ideas in Lavender Aperia Project.
1. Hazard
1.1 unsafe condition
1.2 unsafe act
2. Risk Assessment
2.1 severity
2.2 frequency
3. Safety Prevention
3.1 elimination
3.2 substitution
3.3 engineering
3.4 administration[contoh PTW]
3.5 PPE.
4. Fire Topic[contoh elements of fire, Fire Drill]
5. Work at Height
6. Handling machines.
7. Lifting.
8. Risk Management.
9. Materials labelling
10. Unsafe materials storage and elimination.
11. Regular fogging.
12. Regular workers check up.
13. Dll.
1. Radial—parallel.
2. Ring—series.
1. Always use apparent power as real power is given based on equipment details.
2. Always use phase voltage.
3. For 3phase divide by 3. Contoh S/3=Vph*I, I= S/(3*Vph) where S= P/cos() so I= P/(3*Vph*cos())
4. For 1phase use S.
1. Two doors.
2. Top canopy
3. Bottom entry.
1. 鐵工
2. 木工
3. 水泥.
4. Fressynet tensioning.
5. Piling test using cubes of concrete.
6. 結構樑圖看法 x 先 y 後
空調系統.
1. 冷水風吹冷氣 …..FCU (Fan or untuk orang jurusan listrik [the motor] untuk mengetahui kilowatt
ratingnya(風吹) Coil(冷水)Unit)
印尼國家三樑
Dulu system republic pusat seperti tiongkok sekarang system republic otonomi tapi belum sampai
republic federal seperti AS.
Dmx512- from the name you can know that it can support 512[binary 29] channels.
So each channel is for one function. If the lighting fixture is 16 channel [pan, tilt, rotate, or other
functions] 512/16 fixtures are supported.
CONCERT ENGINEERING
1. LIGHTING
2. SOUND
1. BASS- LOW FREQUENCY
2. MONITOR SPEAKER
3. VIDEO
3.1 MONITOR VIDEO SCREEN [NEW TREND]
EEE labs
1. Time and frequency. require oscillation so every lab has an oscillator/function generator at each
bench.
2. Time invariant—resistors.
3. Time/ frequency [critical for telecommunications data] variant- capacitors + inductors.
1. Draw
2. Modify
3. Dimensions
4. Text
5. Insert
1. Plugins
1.1 library of symbols and models.
1.2 Linking to simulation software for calculation contoh lux and others.
1.3 Linking to Google maps.
1.4 Conversion to revit families.
2. Portable ACAD or Live ACAD on any PC without installing.
3. Torrents and clouds storage.
1. Outside the train view and inside the train view simultaneously relate.
1. External outlook.
1. Reflected Ceiling Plan. 600x 600mm board or 600x1200mm board as diffuser and light fittings
are designed according to those sizes.
2. Furniture Layout and dimensions.
1. Inertia block
2. Pipe support from ground.
3. Chiller jacketing.
4. Silencers
5. Chemical
6. Non chemical.
7. Ionizer
8. UV light germ killing.
9. Fragrances.
10. Auto tube cleaning.
11. Layers or stacking Chillers.
12. Mobile chillers.
Cranes
1. Mobile crane
2. Tower crane –semi permanent
Scaffold
1. Mobile scaffold
2. Scaffold with truss.
Tertiary learning
Concert sounds
1. Inputs[mike or music]Consoleequaliseramplifierspeaker.
2. Speakers connection in parallel.
3. Since it is in parallel, the ohmage will be halved each time.
School requires automated fire detection. But there is no automated fire fighting.
Time constant
Ambassadors.
1. at large
2. country.
1. skype
2. whatsapp call.
3. Others.
Systems tests
1. Functional
2. Time eg battery pack life one hour start and timer. And others that involve time.
3. Certificate of compliance with number of trips for circuit breakers.
4. IP and weather proof tests.
5. Load tests.
6. Alternatives tests.
7. Maintenance and replacement tests with mock up.
1. Overload
2. Short circuit.
3. MCCB > 125A.
4. MCB <=125A.
1. Resistor.
2. Capacitor.
3. Inductor.
Research ideas
Importance of magnets.
1. Drawings
2. Schedules –Work Breakdown Structure
2.1 drawing schedule
2.2 material schedule
2.3 sample schedule
2.4 installation schedule
2.5 manpower schedule
3. labour and cost.
4. Critical path
5. Crashing
6. Forward and backward path similar to protection relay sizing.
7. AOA [Korean music band] and AON..former Manchester united sponsor.
8. Others.
Battery powered emergency lights should be at the door to show the way out in case of blackouts.
@Hong Kong.
Or for smart home 1 switch 1 scene where there can be a combination of lighting and fan or others.
ELR are used in 3 phase system. If upper stream has elr, most probably lower stream does not need.
1. Normally each tutorial will test all the different parts of the lectures for the week.
建黨