Title Page No.

 Introduction/Objectives 2
 System Analysis 5
 Identification of Need 6
 Preliminary Investigation 7
 Feasibility Study 9
 Project Planning 10
 Project Scheduling (PERT Chart and Gantt Chart both) 11
 Software requirement specifications (SRS) 15
 Software Engineering Paradigm applied 17
 Data models 20
 System Design 29
 Modularisation details 37
 Data integrity and constraints 39
 Database design, Procedural Design/Object Oriented Design 41
 User Interface Design 46
 Test Cases (Unit Test Cases and System Test Cases) 61
 Coding 68
 Complete Project Coding 69
 Comments and Description of Coding segments 106
 Standardization of the coding 109
 Code Efficiency 111
 Error handling 115
 Parameters calling/passing 117
 Validation checks 119
 Testing 120
 Testing techniques and Testing strategies used 124
 Testing Plan used 132
 Test reports for Unit Test Cases and System Test Cases 133
 Debugging and Code improvement 134
 System Security measures 136
 Database/data security 137
 Creation of User profiles and access rights 139
 Cost Estimation of the Project along with Cost Estimation Model 140
 Reports (sample layouts should be placed) 143
 Future scope and further enhancement of the Project 145
 Bibliography 147
 Other Information 148