Held at Project Director'S Office-31.10.2017: Discription
Held at Project Director'S Office-31.10.2017: Discription
2017
Discription
3 Estimate of RDA
4 Joint inspection for Fittings
5 Current status about Standard drawing for
valves,chambers & others
6 Contractor should get the approval before pipe laying
7 Status of design of WTP to Ganekanda & Alawwa &
Informed to catch up lagging in 5% from schedule
8 Informed that Monthly Progress report should prepare
with agreed
PD asked format
about outstanding issues from WTP to
9 Alawwa
10 Informed that resubmission is pending for
Kiriwannapola
Status of DesigntoofKandegedara
WTP to Polgahawela existing
11 reservoir
12 Asked about the current status of Handugala location
13 Asked about the current status of Pothuhera to
Boyagane line
14 Asked about the current status of Zone-1 polgahawela
distribution
15 Asked about the current status of existing zone of
polgahawela reservoir
JECT DIRECTOR'S OFFICE- 31.10.2017
Contractor/Cey Water
PD(Wabag) agreed