Professional Documents
Culture Documents
Widening and Improvement of Road and Construction of Flyover at Mirpur Cantt. Estimation For Soil Investigation
Widening and Improvement of Road and Construction of Flyover at Mirpur Cantt. Estimation For Soil Investigation
BORING [5 nos]
Drilling and SPT for 50m BH; SPT @1.5m
interval Including equipment mobilisation 15,000 5 75,000
and demobilisation
Subtotal: 1,505,000
Subtotal: 176,000