DESIGN AND CONSTRUCTION OF LA MESA WTP 1
GEN-1028
PROCESS IMPROVEMENT WORKS Rev. No.: 0

MATERIALS SUBMITTAL Date: August 25, 2017

WIRES & CABLES (PHELPS DODGE PHIL. ENERGY PRODUCTS CORP.) Page 1 of 6

Table of Contents

1.0 Material Compliance Checklist ................................................................................................... 2


2.0 Phelps Dodge Phil. Energy Products Corp. - Wires and Cables, 600VAC .................................... 3
3.0 Appendix I: Phelps Dodge Phil. Energy Products Corp. - Brochures ........................................... 3
4.0 Appendix II: Phelps Dodge Phil. Energy Products Corp. – Company Profile ............................... 4
5.0 Appendix III: Phelps Dodge Phil. Energy Products Corp. – Permits and Certificates .................. 5
6.0 Appendix IV: Layout Drawings of Electrical Works – (Installation of Materials) ........................ 6
Doc. Code: OP-16-WP-08-001-QAC-
DESIGN AND CONSTRUCTION OF LA MESA WTP 1
GEN-1028
PROCESS IMPROVEMENT WORKS Rev. No.: 0

MATERIALS SUBMITTAL Date: August 25, 2017

WIRES & CABLES (PHELPS DODGE PHIL. ENERGY PRODUCTS CORP.) Page 2 of 6

1.0 Material Compliance Checklist

DOCUMENT COMPLIANCE
ITEM PARTICULARS
REFERENCE YES NO N/A
Wires and Cables for Electrical Works
The Contractor shall submit drawings for layout of electrical system for
3.6.1 Appendix U.2, p.39 
approval
The Contractor shall indicate the final location and orientation of all
3.6.2 equipment, raceways, fixtures, and other accessories to be installed on Appendix U.2, p.39  
layout drawings
Manufacturer’s brochure and/or catalogue cuts showing technical
specifications and standard drawing of the following items to be
3.6.3 Appendix U.2, p.39 
submitted:
 Grounding wire BCW
3.6.4 As-built drawings of the installed system shall be submitted. Appendix U.2, p.39 
Doc. Code: OP-16-WP-08-001-QAC-
DESIGN AND CONSTRUCTION OF LA MESA WTP 1
GEN-1028
PROCESS IMPROVEMENT WORKS Rev. No.: 0

MATERIALS SUBMITTAL Date: August 25, 2017

WIRES & CABLES (PHELPS DODGE PHIL. ENERGY PRODUCTS CORP.) Page 3 of 6

2.0 Phelps Dodge Phil. Energy Products Corp. - Wires and Cables, 600VAC

The Contractor is proposing Phelps Dodge Phil. Energy Products Corp. as the supplier of Wires
and Cables for Electrical Works, to be used on the Modularization Sub-Station, Blower Room, Sludge
Treatment Facility Sub-Station

3.0 Appendix I: Phelps Dodge Phil. Energy Products Corp. - Brochures


Doc. Code: OP-16-WP-08-001-QAC-
DESIGN AND CONSTRUCTION OF LA MESA WTP 1
GEN-1028
PROCESS IMPROVEMENT WORKS Rev. No.: 0

MATERIALS SUBMITTAL Date: August 25, 2017

WIRES & CABLES (PHELPS DODGE PHIL. ENERGY PRODUCTS CORP.) Page 4 of 6

4.0 Appendix II: Phelps Dodge Phil. Energy Products Corp. – Company Profile
Doc. Code: OP-16-WP-08-001-QAC-
DESIGN AND CONSTRUCTION OF LA MESA WTP 1
GEN-1028
PROCESS IMPROVEMENT WORKS Rev. No.: 0

MATERIALS SUBMITTAL Date: August 25, 2017

WIRES & CABLES (PHELPS DODGE PHIL. ENERGY PRODUCTS CORP.) Page 5 of 6

5.0 Appendix III: Phelps Dodge Phil. Energy Products Corp. – Permits and
Certificates
Doc. Code: OP-16-WP-08-001-QAC-
DESIGN AND CONSTRUCTION OF LA MESA WTP 1
GEN-1028
PROCESS IMPROVEMENT WORKS Rev. No.: 0

MATERIALS SUBMITTAL Date: August 25, 2017

WIRES & CABLES (PHELPS DODGE PHIL. ENERGY PRODUCTS CORP.) Page 6 of 6

6.0 Appendix IV: Layout Drawings of Electrical Works – (Installation of