Professional Documents
Culture Documents
Kurva S Aknop
Kurva S Aknop
JUMLAH BULAN
No. POSISI M.M
PERSONIL KERJA
JUMLAH BULAN
No. POSISI M.M
PERSONIL KERJA
BULAN
No. URAIAN JENIS PEKERJAAN SATUAN M.M
KERJA
A Perjalanan Dinas
1 Ketua Tim/Ahli SDA 1 10 10.00
2 Tenaga Ahli Sipil 1 8 8.00
3 Tenaga Ahli OP Pengairan 1 8 8.00
4 Ass. Tenaga Ahli Sungai 1 5 5.00
5 Ass. Tenaga Ahli Geodesi 1 5 5.00
JUMLAH I.1. Biaya Dinas II A
BIAYA KANTOR II C
BULAN
No. URAIAN JENIS PEKERJAAN SATUAN M.M
KERJA
C Biaya Kantor
1 Sewa Komputer & Printer 1 4 4.00
2 Sewa Kantor 1 4 4.00
3 Biaya Keperluan Perkantoran 1
JUMLAH I.1. Biaya Kantor II C
BIAYA SURVEY II D
BULAN
No. URAIAN JENIS PEKERJAAN SATUAN M.M
KERJA
D Biaya Survey
Bahan Survey
1 Patok Control Point 10
2 Patok Kayu/Bambu 100
Perlengkapan Survey
3 Sewa Teodholite 1 1 1.00
4 Sewa Alat Ukur Current Meter 1 1 1.00
5 Sewa GPS 1 1 1.00
JUMLAH I.1. Biaya Survey II D
SUB TOTAL
PPN 10%
TOTAL
TOTAL PEMBULATAN
GA
10,000,000 40,000,000
8,000,000 16,000,000
8,000,000 16,000,000
8,000,000 8,000,000
8,000,000 8,000,000
4,000,000 12,000,000
4,000,000 8,000,000
4,000,000 4,000,000
4,000,000 4,000,000
116,000,000
2,000,000 6,000,000
2,500,000 2,500,000
2,000,000 6,000,000
1,000,000 3,000,000
1,000,000 1,000,000
18,500,000
350,000 3,500,000
350,000 2,800,000
350,000 2,800,000
300,000 1,500,000
300,000 1,500,000
12,100,000
3,500,000 10,500,000
600,000 1,800,000
12,300,000
1,000,000 4,000,000
1,000,000 4,000,000
3,000,000 3,000,000
11,000,000
200,000 2,000,000
15,000 1,500,000
1,500,000 1,500,000
500,000 500,000
250,000 250,000
5,750,000
100,000 500,000
150,000 750,000
100,000 500,000
1,250,000 1,250,000
4,400,000
15,000 150,000
45,000 450,000
150,000 1,500,000
2,500,000 2,500,000
4,600,000
184,650,000
18,465,000
203,115,000
203,115,000
PEKERJAAN SURVEY DAN
PENDAHULUAN PENGUMPU
LAN DATA
Pengumpulan data-data
Persiapan Administrasi
Inspeksi Lapangan
team pelaksana
Pendahuluan
terkait
Ketua Team (Ahli SDA) 40,000,000 2% 7%
Tenaga Ahli Sungai 16,000,000 2% 7%
Tenaga Ahli Sipil 16,000,000 2% 7%
Tenaga Ahli OP Pengairan 8,000,000 2% 7%
Tenaga Ahli Geodesi 8,000,000 2% 7%
Ass. Tenaga Ahli Sungai 12,000,000 2% 7%
Ass. Tenaga Ahli Sipil 8,000,000 2% 7%
Ass. Tenaga Ahli OP Pengairan 4,000,000 2% 7%
Ass. Tenaga Ahli Geodesi 4,000,000 2% 7%
Drafter CAD 6,000,000 10% 30%
Juru Ukur 2,500,000 10% 30%
Operator Komputer 6,000,000 2% 7%
Office Boy 3,000,000 2% 7%
Tenaga Lokal Pengukuran 1,000,000 2% 7%
Ketua Tim/Ahli SDA 3,500,000 2% 7%
Tenaga Ahli Sipil 2,800,000 2% 7%
Tenaga Ahli OP Pengairan 2,800,000 2% 7%
Ass. Tenaga Ahli Sungai 1,500,000 2% 7%
Ass. Tenaga Ahli Geodesi 1,500,000 2% 7%
Sewa Kendaraan Roda 4 10,500,000 1% 1% 1% 1% 16%
Sewa Kendaraan Roda 2 1,800,000 1% 1% 1% 1% 17%
Sewa Komputer & Printer 4,000,000 1% 1% 1% 1% 17%
Sewa Kantor 4,000,000 1% 1% 1% 1% 16%
Biaya Keperluan Perkantoran 3,000,000 1% 1% 1% 1% 16%
Patok Control Point 2,000,000 20% 40%
Patok Kayu/Bambu 1,500,000 20% 40%
Sewa Teodholite 1,500,000 20% 40%
Sewa Alat Ukur Current Meter 500,000 20% 40%
Sewa GPS 250,000 20% 40%
Rencana Mutu Kontrak (RMK) 300,000
Laporan Pendahuluan 500,000
Laporan Bulanan 600,000
Draft Laporan Akhir 500,000
Laporan Akhir 750,000
Laporan Ringkas 500,000
Backup Data Dalam External HD 1,250,000
Penggandaan Makalah 150,000
Konsumsi Peserta 450,000 2% 2% 2% 2% 10%
Uang Saku Peserta 1,500,000 10% 10%
Diskusi 2,500,000
TOTAL 184,650,000
PPN 10% 18,465,000
+PPN 10% 203,115,000
Pembulatan 203,115,000
SURVEY DAN
PENGUMPU ANALISA DATA PEKERJAAN PELAPORAN DISKUSI
LAN DATA
Diskusi Pendahuluan
Penyusunan AKNOP
Laporan Bulanan
Evaluasi Kinerja
Diskusi Bulanan
Album Gambar
Laporan Akhir
Diskusi Akhir
identifikasi
Monitoring
data-data
Kontrak
Sungai
Inspeksi Lapangan
Alih Pengetahuan
team pelaksana
Pendahuluan
1% 100% Rp0 Rp0 Rp0 Rp800,000
1% 100% Rp0 Rp0 Rp0 Rp320,000
1% 100% Rp0 Rp0 Rp0 Rp320,000
1% 100% Rp0 Rp0 Rp0 Rp160,000
1% 100% Rp0 Rp0 Rp0 Rp160,000
1% 100% Rp0 Rp0 Rp0 Rp240,000
1% 100% Rp0 Rp0 Rp0 Rp160,000
1% 100% Rp0 Rp0 Rp0 Rp80,000
1% 100% Rp0 Rp0 Rp0 Rp80,000
100% Rp0 Rp0 Rp0 Rp600,000
5% 100% Rp0 Rp0 Rp0 Rp250,000
1% 100% Rp0 Rp0 Rp0 Rp120,000
1% 100% Rp0 Rp0 Rp0 Rp60,000
1% 100% Rp0 Rp0 Rp0 Rp20,000
1% 100% Rp0 Rp0 Rp0 Rp70,000
1% 100% Rp0 Rp0 Rp0 Rp56,000
1% 100% Rp0 Rp0 Rp0 Rp56,000
1% 100% Rp0 Rp0 Rp0 Rp30,000
1% 100% Rp0 Rp0 Rp0 Rp30,000
100% Rp105,000 Rp105,000 Rp105,000 Rp105,000
100% Rp18,000 Rp18,000 Rp18,000 Rp18,000
100% Rp40,000 Rp40,000 Rp40,000 Rp40,000
1% 100% Rp40,000 Rp40,000 Rp40,000 Rp40,000
1% 100% Rp30,000 Rp30,000 Rp30,000 Rp30,000
100% Rp0 Rp0 Rp0 Rp400,000
100% Rp0 Rp0 Rp0 Rp300,000
100% Rp0 Rp0 Rp0 Rp300,000
100% Rp0 Rp0 Rp0 Rp100,000
100% Rp0 Rp0 Rp0 Rp50,000
100% Rp0 Rp0 Rp0 Rp0
100% Rp0 Rp0 Rp0 Rp0
100% Rp0 Rp0 Rp0 Rp0
100% Rp0 Rp0 Rp0 Rp0
100% Rp0 Rp0 Rp0 Rp0
100% Rp0 Rp0 Rp0 Rp0
100% Rp0 Rp0 Rp0 Rp0
100% Rp0 Rp0 Rp0 Rp0
1% 100% Rp9,000 Rp9,000 Rp9,000 Rp9,000
100% Rp0 Rp0 Rp0 Rp150,000
25% 100% Rp0 Rp0 Rp0 Rp0
Rp242,000 Rp242,000 Rp242,000 Rp5,154,000
0.13 0.13 0.13 2.79
0.13 0.26 0.39 3.18
ANALISA DATA
SURVEY DAN PENGUMPULAN DATA
Survey pengukurandan
Bangunan Prasarana
Penyusunan AKNOP
Evaluasi Kinerja
identifikasi
data-data
Sungai
terkait
Laporan Pendahuluan
Laporan Bulanan
Laporan Akhir
Kontralk
Diskusi Pendahuluan
Album Gambar
Monitoring
Rp400,000 Rp400,000 Rp400,000 Rp400,000 Rp400,000
Rp160,000 Rp160,000 Rp160,000 Rp160,000 Rp160,000
Rp160,000 Rp160,000 Rp160,000 Rp160,000 Rp160,000
Rp80,000 Rp80,000 Rp80,000 Rp80,000 Rp80,000
Rp80,000 Rp80,000 Rp80,000 Rp80,000 Rp80,000
Rp120,000 Rp120,000 Rp120,000 Rp120,000 Rp120,000
Rp80,000 Rp80,000 Rp80,000 Rp80,000 Rp80,000
Rp40,000 Rp40,000 Rp40,000 Rp40,000 Rp40,000
Rp40,000 Rp40,000 Rp40,000 Rp40,000 Rp40,000
Rp0 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp0 Rp250,000 Rp125,000
Rp60,000 Rp60,000 Rp60,000 Rp60,000 Rp60,000
Rp30,000 Rp30,000 Rp30,000 Rp30,000 Rp30,000
Rp10,000 Rp10,000 Rp10,000 Rp10,000 Rp10,000
Rp35,000 Rp35,000 Rp35,000 Rp35,000 Rp35,000
Rp28,000 Rp28,000 Rp28,000 Rp28,000 Rp28,000
Rp28,000 Rp28,000 Rp28,000 Rp28,000 Rp28,000
Rp15,000 Rp15,000 Rp15,000 Rp15,000 Rp15,000
Rp15,000 Rp15,000 Rp15,000 Rp15,000 Rp15,000
Rp105,000 Rp105,000 Rp105,000 Rp0 Rp0
Rp18,000 Rp18,000 Rp18,000 Rp0 Rp0
Rp40,000 Rp40,000 Rp40,000 Rp0 Rp0
Rp40,000 Rp40,000 Rp40,000 Rp40,000 Rp40,000
Rp30,000 Rp30,000 Rp30,000 Rp30,000 Rp30,000
Rp0 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp0 Rp0 Rp0
Rp500,000 Rp0 Rp0 Rp0 Rp0
Rp0 Rp0 Rp1,250,000 Rp0 Rp0
Rp15,000 Rp30,000 Rp30,000 Rp0 Rp0
Rp22,500 Rp22,500 Rp22,500 Rp4,500 Rp4,500
Rp0 Rp0 Rp0 Rp300,000 Rp300,000
Rp0 Rp0 Rp0 Rp0 Rp625,000
Rp2,151,500 Rp1,666,500 Rp2,916,500 Rp2,005,500 Rp2,505,500
1.17 0.90 1.58 1.09 1.36
91.25 92.15 93.73 94.82 96.17
DISKUSI
Alih Pengetahuan
Diskusi Bulanan
Diskusi Akhir
3 ANALISA DATA
3.1 Analisa dan perhitungan data-data 20.59
20.59
3.2 Evaluasi Kinerja Bangunan Prasarana Sungai 20.59
20.59
3.3 Penyusunan AKNOP 19.78
19.78
4 PEKERJAAN PELAPORAN
4.1 Laporan Rencana Mutu Kontrak 1.05 1.05
1.05 1.05
4.2 Laporan Pendahuluan 1.16
1.16
4.3 Laporan Bulanan 1.22
1.22
4.4 Laporan Akhir Sementara 1.17
1.17
4.5 Laporan Akhir 1.30
1.30
4.6 Laporan Akhir Ringkas 1.17
1.17
4.7 Album Gambar 0.90
0.90
4.8 CD dan Internal Hardisk 1.58
1.58
5 DISKUSI
5.1 Monitoring 1.09 0.27
1.09 0.27
5.2 Diskusi Pendahuluan 1.36 1.36
1.36
5.3 Diskusi Bulanan 1.36 0.34
1.36 0.34
5.4 Diskusi Akhir 1.28
1.28
5.5 Alih Pengetahuan 1.19
1.19
Jumlah 200.00
Rencana 0.40 1.52 2.49
Rencana Komulatif 0.40 1.93 4.42
Realisasi 0.13 0.74 1.19
Realisasi Komulatif 0.13 0.87 2.06
Deviasi -0.27 -1.05 -2.36
JADWAL PELAKSANAAN PEKERJAAN
N KINERJA DAN AKNOP TANGGUL PERKOTAAN
Bulan
Mei Juni Juli
1-7 8-14 15-22 23-31 1-7 8-14 15-22 23-30 1-7 8-14
1.40 1.40
0.93 0.93 0.93
0.58 0.58
0.58 0.58
0.30 0.30 0.30
0.30 0.30 0.30
0.29 0.29 0.29
1.36
0.34 0.34
0.34 0.34
5.95 13.54 11.63 11.29 10.60 9.56 7.96 8.75 9.06 1.40
10.37 23.91 35.55 46.84 57.44 67.00 74.96 83.71 92.77 94.17
1.23 0.93 4.57 2.25 3.81 2.92 3.53 2.92 1.56 1.25
3.29 4.22 8.79 11.04 14.85 17.77 21.30 24.23 25.78 27.03
-7.08 -19.69 -26.76 -35.80 -42.59 -49.23 -53.65 -59.48 -66.99 -67.14
Bulan
Juli Agst Sept
15-22 23-30 1-7 8-14 15-22 23-31 1-7 8-14 15-22 23-30
1.25 1.25
1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37
1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37 1.37
1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32
0.30
0.30
0.29
0.33
0.29
0.23
1.58
0.27
0.34
0.34
1.28
1.19
4.06 4.06
70.79 74.86
70.79 74.86
JADWAL PERALATAN
PENILAIAN KINERJA DAN AKNOP TANGGUL PERKOTAAN
Bulan Ke
No Peralatan Lama Satuan I II III IV
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
1 Ketua Tim/Ahli SDA 4 Bulan
2 Tenaga Ahli Sipil 4 Bulan
3 Tenaga Ahli OP Pengairan 4 Bulan
4 Kamera 4 Bulan
5 Komputer PC +Printer 4 Bulan
6 Laptop 4 Bulan
7 Sewa Alat Ukur Current Meter 4 Bulan
8 Telepon & Faximile 4 Bulan
9 GPS 4 Bulan
10 Sewa Teodholite 4 Bulan
JADWAL MATERIAL
PENILAIAN KINERJA DAN AKNOP TANGGUL PERKOTAAN
Bulan Ke
No Peralatan Lama Satuan I II III IV
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
1 Bahan Habis Pakai ATK 4 Bulan
2 Patok BM 4 Bulan
3 Patok Kayu 4 Bulan
4 Balanko survey 4 Bulan
ARUS KAS
PENILAIAN KINERJA DAN AKNOP TANGGUL PERKOTAAN
WAKTU PELAKSANAAN
No JENIS PENERIMAAN / PENGELUARAN
Bulan I Bulan II Bulan III
NAAN
Bulan IV
48,747,600.00
48,747,600.00
203,115,000.00
0.00
0.00
43,357,966.67
12,585,925.00
7,498,150.00
63,442,041.67
266,834,516.67
-63,719,516.67
LOKASI PENYIMPANAN MASA PENYIMPANAN
NO NAMA REKAMAN/BUKTI KERJA
REKAMAN REKAMAN
1 Laporan Rencana Mutu Kontrak Pengguna & Penyedia Jasa 4 (empat) bulan
2 Laporan Pendahuluan Pengguna & Penyedia Jasa 4 (empat) bulan
3 Laporan Bulanan Pengguna & Penyedia Jasa 4 (empat) bulan
4 Laporan Akhir Sementara Pengguna & Penyedia Jasa 4 (empat) bulan
5 Laporan Akhir Pengguna & Penyedia Jasa 4 (empat) bulan
6 Laporan Akhir Ringkas Pengguna & Penyedia Jasa 4 (empat) bulan
7 Album Gambar Pengguna & Penyedia Jasa 4 (empat) bulan
8 CD dan Internal Hardisk Pengguna & Penyedia Jasa 4 (empat) bulan
Bulan Ke
Jumlah
No. Posisi yang Diusulkan Nama Personil
Personil I II
1 2 3 4 1 2
II III IV
3 4 1 2 3 4 1 2 3 4