SITE ENGINEERING
4 Space For Space available for BTS Space Available for TRSM Rack
Equipments
(Sharing sites)
5 Floor Levelled
Antistatic Mat
Antistatic grounding
6 Door Sealing Locking
10 Earthing Bus Bars EGB under feeder entry Connected to Body Earthpit
IGB under feeder entry Connected to Eqpt Earthpit
EMP BUS BAR
11 PIU/ACDB PIU/ACDB Installed POWER TERMINATION AT PIU/ACDB
CHECK LIST FOR BTS SITES 2 (4)
SITE ENGINEERING
PIU/ACDB commissioned
14 DG DG installed DG Commissioned
19 Cable ladder (OD) Vertical Cable tray installed Horizontal Cable tray installed
20 Cable Ladder Length of Vertcal ladder(above HCT till antenna mount) in mtrs.
lengths
Length of HCT ladder in mtrs.
SITE ENGINEERING
24 Antenna Mount GSM antenna mount Installed Antenna Mount for MW at near end
29 GSM antenna
Azimuth(As per
TND)
30 GSM antenna
Azimuth (existing)
31 MW Antenna
Azimuth(As per
TND)
32 MW Antenna
Azimuth (Existing)
CHECK LIST FOR BTS SITES 4 (4)
SITE ENGINEERING
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
Pls sketch whole Site Plan along with shelter/cage plan (including HCT routing)