CHECK LIST FOR BTS SITES 1 (4)

SITE ENGINEERING

TELECOM IMPLEMENTATION INSPECTION REPORT


SITE ID: ........................ SITE NAME: ................................................Date Of Visit: .......................

SITE ADDRESS: …………………………………………………………...........Document number: .........................

Guard Name and contact No.

Date of submission of Report:………………………………….

Notation: Correctly installed / Acceptable Not correct

S.No Infrastructure Check point


.

1 Radio Site GBT RTT POLE

2 ID/OD/POLE/WALL INDOOR  OUTDOOR WALL POLE

3 Shelter Buildg. Height (Mtrs/floor) Equipment Room Floor

Chain Pulley required 

4 Space For Space available for BTS  Space Available for TRSM Rack 
Equipments
(Sharing sites)

5 Floor Levelled

Antistatic Mat

Antistatic grounding 
6 Door Sealing  Locking 

7 ID LADDER ID LADDER INSTALLED  SPACE ON EXISTING LADDER

8 Lighting No. of fittings  2 Operational  P Sockets operational 

9 Earthing system No of Pits with Chamber prepared  Earthpits are interconnected 


DG,DG-N,Tower,Shelter are conneted to EP 
Earthing Values – EP1 EP2 EP3 Ohms

10 Earthing Bus Bars EGB under feeder entry  Connected to Body Earthpit 
IGB under feeder entry  Connected to Eqpt Earthpit 
EMP BUS BAR 
11 PIU/ACDB PIU/ACDB Installed  POWER TERMINATION AT PIU/ACDB 
CHECK LIST FOR BTS SITES 2 (4)

SITE ENGINEERING

PIU/ACDB commissioned 

12 Mains Incomer Mains available  Energy Meter Installed 

13 DC Power DC Power Available  MCB available for BTS& TRSM 


Availability

14 DG DG installed DG Commissioned
 

15 Air-conditioning Installed  Sealing around AC units  AC’s are comm. 

16 WFT Size of opening made for WFT No of Openings made

Openings are properly sealed 



17 Tower GBT RTT Tower Height

No of Platforms & height Tower Painting 

18 Type Tower Type

19 Cable ladder (OD) Vertical Cable tray installed  Horizontal Cable tray installed 

Space available on Vertical/Horizontal tray 

20 Cable Ladder Length of Vertcal ladder(above HCT till antenna mount) in mtrs.
lengths
Length of HCT ladder in mtrs.

21 Lightening Lightening Rod LA connected to Earthpit


Protection
 

22 Aviation Light Installation COMMISSIONED


 
CHECK LIST FOR BTS SITES 3 (4)

SITE ENGINEERING

23 Cable Inlet For Power & Signal Cables 

24 Antenna Mount GSM antenna mount Installed  Antenna Mount for MW at near end 

Antenna Mount for MW at Far End 

25 GSM antenna Height of GSM antennas


Mount hts.(as per
TND)

26 GSM antenna Height of GSM antennas


Mount
hts.(existing)

27 MW Antenna Height of MW antennas


Mount ht.

(as per TND)

28 MW Antenna Height of MW antennas


Mount ht.
(Existing)

29 GSM antenna
Azimuth(As per
TND)

30 GSM antenna
Azimuth (existing)

31 MW Antenna
Azimuth(As per
TND)

32 MW Antenna
Azimuth (Existing)
CHECK LIST FOR BTS SITES 4 (4)

SITE ENGINEERING

Problems / Comments (Refer to applicable activity Sl. No.)

_________________________________________________________________________________

_________________________________________________________________________________

_________________________________________________________________________________

_________________________________________________________________________________

Site Engineer Name & Signature

Pls sketch whole Site Plan along with shelter/cage plan (including HCT routing)