FLOW CHART OF ACTIVITIES FOR THE AVAILMENT OF THE
Application of Priority shall be based on the following radiating order, namely: NON-ELECTRIFICATION FUND (DLF & RWMHEEF)
Electrification (i) Resettlement Area, (ii) Host Barangay, (iii) Host Municipality,
Fund (iv) Host Province, and (v) Host Region.
By LGU/Region (Checking of
fund
Allocation of DLF and RWMHEEF (Assisted by PP COMREL) availability)
1. List of projects/Work Review/
program (Not later evaluation of
than March 15 of every project
For non-highly urbanized city For highly urbanized city year) proposal by
NPC-PP/IPP/
• Resettlement Area - 5% • Designated resettlement areas - 10% 2. Sanggunian/RDC NPC-PNOC/
resolution ERD and
• Host Barangay - 20% • Host Barangays - 30% Endorsement
• Host Municipality/City - 35% • Host City/ies - 60% 3. Project proposal to DOE-EPIMB
(see page 9 ) Turn over of
• Host Province - 30% (Days = 13) project to
4. Required supporting LGU/RDC /
• Host Region - 10% sanctions
documents (see
page 8)
Evaluation,
Approval and
Summary of Approved Projects Release of Fund by
DOE
(as of August 15, 2006)
Approval of
projects and Findings
1,202 Electrification Projects amounting to P888.08 Million signing of DV are
as follows:
770 Development and Livelihood Projects amounting to P 459.78 Million > 5M - Secretary
709 Reforestation, Watershed Management, Health and/or Environment Enhancement > 1M < 5M -
Undersecretary
Projects amounting to P 698.34 Million
< 1M - Director Audit
(Days = 13)
Signing of MOA
Release of Project
funds to LGU/ Implementation
RDC by LGU/RDC
PP COMREL - Power Plant Community The estimated number of days is based on the assumption all requirements
Relations Officer have been completed. The whole process of obtaining signatures on the MOA
ERD - Energy Resource Developer takes 30 days.
-2- -3-
Types of Funded Projects
FLOW CHART OF ACTIVITIES FOR THE AVAILMENT OF THE
ELECTRIFICATION FUND
-4- -5-
SUPPORTING DOCUMENTS FOR REFORESTATION, WATERSHED MANAGEMENT, con't.
HEALTH AND/OR ENVIRONMENT ENHANCEMENT PROJECT PROPOSALS
Health Center/
Reforestation/
Water Supply
Health Center/
Management
Agroforestry
Reforestation/
Water Supply
Solid Waste
Management
Agroforestry
Communal
Equipment
Solid Waste
Structural
Communal
Equipment
Measures
Structural
Training
Nursery/
Measures
Medical
Erosion
Facility/
Training
Nursery/
System
Medical
Erosion
Toilets
Facility/
System
Toilets
DOCUMENTS DOCUMENTS
1 as applicable
2 for projects with cooperative/association as project implementor
3 training as a component of a project or solely training
-6- -7-
SUPPORTING DOCUMENTS FOR DEVELOPMENT AND LIVELIHOOD
FORM 2
PROJECT PROPOSAL
SAMPLE FORMAT
TYPE OF PROJECT
PR OJECT PR
PROJECT OPOSAL
PROPOSAL
Income
REQUIREMENTS
Infrastructure Generating Training3 I. Project Title
Livelihood
Projects II. Sources of Funds Under E.R. 1-94
1 Resolution from the concerned • Name of power plant
Sanggunian endorsing the project x x x
identified during the LGU consultation
• Fund Type (DLF, RWMHEEF-Resettlement/Barangay/
Municipality/City/Province/Region)
2 Feasibility study for projects 1 x x x • Available Fund
3 Sketch/location map of the project x x x
Disbursement schedule, detailed cost III. Beneficiaries
4
estimate, bill of materials, plans, drawings, • Name of local government unit (LGU)
specifications, program of work duly x x x
• Number of residents/households/members
signed by the Municipal/Provincial
Engineer and Mayor/Governor
IV. Objectives
5 List of cooperative/association members/
borrowers with corresponding amount to x V. Rationale/Justification
be borrowed and purpose 1
Cooperative/association's latest financial VI. Project Profile
6
statement (6 mos - 1 yr prior to project x x x A. Project Description
application) 2
• Area covered (number of hectares)
7 Three - five - year projected income x • Type of species, mortality rate/sustainability
statement
• Monitoring scheme
8 Training design x • Roles of DENR, LGU, PO
9 Notarized copy of Deed of Donation/ • Land use/classification
Proof of Transfer of Private Property/
Transfer Certificate of Title or equivalent B. Project Location
legal documents justifying public x
ownership of lot/site C. Summary of Project Cost (Attach detailed Bill of
Sanggunian resolution stipulating date of Materials/Labor/Hauling/Equipment Cost, and
10
transfer of property, existing use of x Disbursement Schedule)
transferred property.
D. Project Implementator/Implementing Agency
11 Certification of road classification from
the concerned host LGU's engineer's x VII. Project Implementation
office.
Activities Time Frame
12 Certified True Copy of SEC/CDA/DOLE x x x
Certificate of Registration 2
13 Relevant permits from concerned x x x
agencies 2 Prepared By: Endorsed By:
1 as applicable
2 for projects with cooperative/association as project implementor
LGU Head/RDC
3 training as a component of a project or solely training
-8- -9-
B. Benefits to Host Communities Pursuant to Local Government Code Subsidy Scheme
b.) Twenty percent (20% of the proceeds shall be utilized for the
a.) Eighty percent (80%) of the proceeds shall be applied solely to development and livelihood projects which shall be appropriated by
Nature of
Benefits lower the cost of the electricity either through subsidy or non- their respective Sanggunian.
subsidy scheme or combination of both.
Allocation of Shares
Non-subsidy Scheme
- 10 - - 11 -
For energy resource located in two (2) or more provinces, or in two (2) or more
municipalities/cities or two (2) or more barangays, their respective shares shall be
appropriated on the basis of the following: For further information, please contact or visit us at. . .
• population - 70%
• land area - 30%
Where the land area is the area of the host barangays found within the technically
delineated energy resource area and where the population refers to the population of
host barangays found wholly or partially within the technically delineated energy resource.