Professional Documents
Culture Documents
2018 Orange Barrel Report
2018 Orange Barrel Report
2018 Orange Barrel Report
Preconstruction
SW 29th and Burlingame Intersection +
SW 21st and Kansas Avenue Intersection +
Bidding
SW Arvonia Place/Huntoon Street/I-470 Ramp Intersection +
SW Gage – 21st to 25th +
SE Adams – 29th to 33rd +
Micro-seal (Preventive Maintenance) – various locations +
In Design
N. Vail – NW Gordon to Hwy 24 +