This project quality plan outlines checks for an excavation project. It includes 11 points to verify such as ensuring required excavation equipment is available, drawings have been issued, records of excavation levels are kept, and original ground levels have been approved. Special requirements like dealing with rock or unsuitable materials are also addressed. The checklist is to be signed off by various roles like the site engineer, MEP engineer, and QA/QC incharge.
This project quality plan outlines checks for an excavation project. It includes 11 points to verify such as ensuring required excavation equipment is available, drawings have been issued, records of excavation levels are kept, and original ground levels have been approved. Special requirements like dealing with rock or unsuitable materials are also addressed. The checklist is to be signed off by various roles like the site engineer, MEP engineer, and QA/QC incharge.
This project quality plan outlines checks for an excavation project. It includes 11 points to verify such as ensuring required excavation equipment is available, drawings have been issued, records of excavation levels are kept, and original ground levels have been approved. Special requirements like dealing with rock or unsuitable materials are also addressed. The checklist is to be signed off by various roles like the site engineer, MEP engineer, and QA/QC incharge.
Project No. 19 Project Name Project detail/ Location
Check list for Excavation
Location : ETS Room Drawing Ref : Sheet No .
S. No. Points to be verified Yes No N/A Remarks
1 Are the plants/machineries required for excavation available 2 Are the approved drawings issued for construction 3 Are the records for excavation levels and starting levels of the area at agreed intervals kept 4 Are the Original Ground levels recorded and approved by the client/consultant 5 Is the excavation done as per the requirements of the specification 6 In case rock or boulder rock is encountered while excavation, has the area been inspected and certified in writing the quantity involved by the Engineer prior to excavation 7 In soil, is excavation taken to within 200mm of the formation or foundation level 8 Is the approval taken for any hand excavation in any section not more than 24 hours before the commencement of construction in that section 9 Is adequate protection for neighbouring footings and existing permanent services below ground provided 10 Diversion of existing services, if any, carried out as per approval 11 Has the unsuitable material been carted away Other special requirements/Remarks: