No Deliverable List (Minimum Requirement) Remarks

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

No Deliverable List Remarks

(Minimum Requirement)
1 Pressure Reducing System P&ID, -
Calculation dan Preliminary data sheet
2 Relief system process (Back pressure preliminary , outlet
press, relief capacity) untuk 920 V-2,
920 V-5, GTU, Compander dan PSA
unit)
3 Process Philosophy normal operasi -
Gas Treating unit dan PSA unit
4 Preliminary estimasi utility consumption (Electrical, IA, LP Steam)
used
5 Philosophy operasi kesisteman gas (Normal Operasi, GTU trip, PSA trip,
External H2 existing trip, kondisi tahap I by
pass GTU & operasi Press Reducing
System)
6 Equipment List Package GTU, PSA & -
Compander