Translated Version of POQ - XLSX: The Name of The Item Unity Item Number
Translated Version of POQ - XLSX: The Name of The Item Unity Item Number
xlsx
A B C
Saudi Arabia
1
Ministry of Housing
12
2.2.2 Businessman filling layers 200 mm thick layer of one material supplier M3
suitable accredited off-site and include the item on the work of
compaction and brushes to get to the required design elevations.
13
Go to the summary table
14
3 Paving of roads and shoulders
15
The work includes the supply and installation of the asphalt surface
and base materials and paint layer of bitumen (MC1, RC2) and
businessman father and the settlement and all civil works necessary
to complete the work in the best and according to plans and
specifications.
16
3-Jan Asphalt surface layer of a thickness of 50 mm M2
17
3-Feb Tarmac layer basis of surface thickness of 60 mm M2
18
3-Mar Sprinkle a layer of bitumen based adhesive (MC1) at a rate of not less M2
than 1.75 kg / m 2
19
3-Apr Supply and sprayed layer RC2 according to the specifications M2
20
3-May The basis of the gravel layer thickness of 200 mm M2
21
3-Jun Assistant foundation layer thickness of 300 mm M2
22
The execution of the service the site of the sidewalks on the sides of
4 roads and parking lots and crossings
23
4-Jan Supply and installation of Block concrete nested Interlock of concrete M2
that at least stress fracture her about 40 N / mm 2 for the car park with
a thickness of 80 mm and includes bedding sand thickness of 30 mm
and layer the basis of gravel thickness of 300 mm, prepare the layer
under the foundation and processing surfaces settlement and dad and
all civil works necessary to complete the work in the best and
according to plans and specifications.
24
Go to the summary table
25
4-Feb Supply and installation of Block concrete nested Interlock of concrete M2
that at least stress fracture her about 40 N / mm 2 and that of the
sidewalks on the sides of the road a thickness of 60 mm and includes
bedding sand thickness of 50 mm and layer Concrete normal
thickness of 60 mm and prepare the layer under the foundation
thickness of 100 mm and processing surfaces settlement and dad and
all civil works necessary to complete the work in the best and
according to plans and specifications.
26
4-Mar Supply and installation of Block concrete nested Interlock crossings M2
thickness of 80 mm and includes a mattress sand thickness of 30 mm
and layer the basis of gravel thickness of 200 mm and prepare the
layer under the foundation and processing surfaces settlement and
dad and all civil works necessary to complete the work in the best and
according to drawings and specifications.
27
4-Apr The creation of corridors pedestrian crossing in the form of bumps and
include the item on the work of backfill materials and certified interlock
tile thickness of 80 mm and all civil works necessary to end the work
in accordance with the size of the following:
28
A - Size 11.60 * 7.00 m Number
29
B - Size 14.30 * 7.00 m Number
30
C - Size 15.345 * 7.00 m Number
31
D - Size 15.38 * 7.00 m Number
32
E - Size 16.00 * 7.00 m Number
33
And - Size 18.40 * 7.00 m Number
34
Go to the summary table
35
5 Concrete barriers (edgings)
36
The work includes the supply and installation of barriers, precast
concrete edgings with content concrete not less than 350 kg / m 3 and
Item includes Concrete hygiene thickness of 100 mm and cement
mortar Altkahil and processing surfaces settlement and dad and paints
traffic white and black and all civil works related and according to the
plans and specifications
37
5-Jan Borders size (300 * 150 * 600 mm). M. I
38
5-Feb Borders size (300 * 220 * 600 mm). M. I
39
5-Mar Borders size (150 * 250 * 600 mm). M. I
40
5-Apr Traffic paints white and black reflective curbs M2
41
6 Signs identifying roads and ceramics (cats eyes)
42
Made up signs identifying the road from heat reflective paints
(Thermoblastic) white or yellow commensurate with the specifications
of the Ministry of Transport.
43
6-Jan Line the far end of the road paint yellow reflector width 200 mm used M. I
to determine the extent of the end of the road lane right or left. (See
detail No. 18).
44
6-Feb Paint a white reflector (100 mm width * 2000 mm) length of each 6 M. I
meters is used to divide the road for a number of lanes (see detail 1).
45
6-Mar Halfway line identification (paint white reflector) consists of two lines M. I
width of 100 mm (2 x 100 mm) separated by a distance of 75 mm and
is used to separate the middle of the road to two different
directions. (According to detail No. 2).
46
Go to the summary table
47
6-Apr Halfway line identification (paint white reflector) consists of two lines M. I
width of 100 mm (2 x 100 mm) separated by a distance of 75 mm and
is used to separate the middle of the road to two different directions
where overtaking is not allowed. (According to detail No. 2).
48
6-May Signs intersection floor (22:00 * 100 mm width) white paint M. I
reflector. (According to detail No. 4).
49
6-Jun Paint footpaths paint White reflector and a length of 3000 mm width M. I
500 mm. (According to detail No. 28).
50
6-Jul Stop line (white reflective paint) according to the detail RFM 6. M. I
51
6-Aug Line at the end of the road intersections (paint yellow reflector) in M. I
accordance with the detail No. 21.
52
6-Sep Occasional signs (yellow paint) 300 mm according to the detail No. 27. M. I
53
6-Oct Shares to the direction of the rectum (white reflective paint) according Number
to the detail No. 10.
54
6-Nov Shares to the direction of the right or the left (white reflective paint) Number
according to the detail No. 12.11.
55
6-Dec Double arrow straight direction with a left-turn or a straight direction Number
with the rotation of the right (white reflective paint) according to the
detail No. 13.
56
13-6 The direction of the double arrow to the right and to the left of the Number
direction (white reflective paint) according to the detail No. 14.
57
14-6 Supply and installation of Ceramic White (cats eyes) diameter of 100 Number
mm to reduce the speed of cars and the places described in the
drawings.
58
Go to the summary table
59
7 Road signs (warning and regulatory)
60
Supply and installation of signs and traffic signs in accordance with
the specifications of the Ministry of Transport. Covered columns
bearing banners (except galvanized) two layers of oxide of lead paint
and then two layers of aluminum coating with varnish after the end of
the installation and install the signs are painted the heads of the nails
and fetch phenomenon is the same color as the background of
existing space.
61
Item includes excavation work rules and re-filling banners and get rid
of excess dust and concrete rules of sulphate resistant cement and
restore the surface to what it was in accordance with the plans and
specifications.
62
7-Jan All cars are required right side (the Ministry of Transport Reference: 59 Number
c)
63
7-Feb Intersection pedestrian (Ministry of Transport Reference: 19) Number
64
7-Mar Stopping at intersections (Ministry of Transport Reference: 54) Number
65
7-Apr Speed limit (Ministry of Transport Reference: 56) Number
66
7-May Spin backwards (Ministry of Transport Reference: 34 b) Number
67
7-Jun Parking (Ministry of Transport Reference: 301) Number
68
7-Jul Be careful before you bump Number
69
70
71
72
73
74
75
Go to the summary table
76
77
Page
Number
78
79 1-Jun
80 2-Jun
81 3-Jun
82 4-Jun
83 5-Jun
84 6-Jun
85
86
87
88 Go to the General Summary
2 rain water drainage system
A B C
Saudi Arabia
1
Ministry of Housing
Management of Procurement and Tenders
2
Item
3 number The name of the item Unity
4
Table (2) rain water drainage system
5
1 Supply, installation and test tubes UPVC degree (4)) UPVC Class 4)
The item includes drilling in all types of soil, including Aldkhr and re
backfilling and compaction layers with getting rid of dust excess in
accordance with the instructions of the engineer and business support
aspects of drilling and dewatering of groundwater if necessary and
Brush the bottom and around the pipes and warning tape and cutting
the work on the road and restore the surface to what it was and re
pavers and sidewalks and edgings if necessary and all necessary in
accordance with the plans and technical specifications and as
instructed by the supervising engineer.
6
1-Jan Pipe diameter 315 mm depth of more than 1.0 m to 2m M. I
7
8
9
10
11
12
13
14
15
Go to the summary table
16
17
Table (2) rain water drainage system
18
2 Supply, installation and test tubes of reinforced concrete degree (5)
RCP Class V item includes drilling in all types of soil, including Aldkhr
and re backfilling and compaction layers with getting rid of dust
excess in accordance with the instructions of the engineer and
business support aspects of drilling and dewatering of ground if
necessary and bedding down and around pipes and warning tape and
cutting the work on the road and restore the surface to what it was
and re pavers and sidewalks and edgings if necessary and all
necessary in accordance with the plans and technical specifications
and as instructed by the supervising engineer.
19
20 1-Feb Lines Atabeb depth greater than 6.5 until 18:00 pm
A - 900 mm diameter pipeline M. I
21
2-Feb Lines Atabeb depth greater than 5.5 m until 18:00
22
A - 900 mm diameter pipeline M. I
23
3-Feb Lines Atabeb depth greater than 5.5 until 17:00 pm
24
25 A - 900 mm diameter pipeline M. I
76
1-Apr Applied to a depth greater than 1.5 meters up 2.0 meters M. I
77
2-Apr Applied to a depth of greater than 2 meters to 2.5 meters M. I
78
3-Apr Applied to a depth greater than 2.5 meters up 3.0 meters M. I
79
4-Apr Applied to a depth of greater than 4.00 meters till 4.5 meters M. I
80
5-Apr Applied to a depth of greater than 5.00 meters till 5.50 meters M. I
81
6-Apr Applied to a depth of greater than 6.00 meters till 6.5 meters M. I
82
Go to the summary table
83
84
Table (2) rain water drainage system
85
5 Supply, installation, testing identical special reinforced concrete cast
Active unnecessary installation on the lines of storm water network
with diameters larger than 700 mm, and the item includes drilling in all
types of soil, including the rocky soil comprehensive business
dewatering, if any, and acts of re-filling the material suitable certified
and get rid of the dust excess, as well as concrete forming tendencies
bottom (Benching) with isolated concrete surfaces internal epoxy and
isolate the external surfaces of the membrane insulator of water from
the PVC according to specifications, and includes item also supply the
corresponding tires and blankets (Almsamth - the retina), heavy duty
(according to the specifications of the British BS 497 ) and stairs metal
coated textured the PE pipe and fittings and all acts necessary to
complete the work optimally, according to the plans and specifications
and as directed by the supervising engineer.
86
1-Apr Applied to a depth of greater than 2 meters to 2.5 meters M. I
87
2-Apr Applied to a depth greater than 2.5 meters up 3.0 meters M. I
88
3-Apr Applied to a depth of greater than 3.00 meters (3.5 meters) even M. I
89
4-Apr Applied to a depth greater than 3.5 meters until 4.00 meters M. I
90
5-Apr Applied to a depth of greater than 4.00 meters till 4.5 meters M. I
91
6-Apr Applied to a depth greater than 4.5 meters until 5.00 meters Number
92
93
Go to the summary table
94
95
Table (2) rain water drainage system
96
6 Supply and installation of sinks rain) Catch Basin) as is illustrated with
charts, and the item includes drilling in all types of soil, including the
rocky soil comprehensive business dewatering (if any) and re-filling
materials selected based on layers, as well as re-pavers and
sidewalks and edgings to what it was, if necessary It also includes
links to the item and also cover the pipes and iron, heavy duty
(according to the specifications of the British BS 497) and all of the
supplies necessary to complete the work in accordance with the
specifications and drawings and instructions by the supervising
engineer and it sinks to the following models:
97
98 1-Jun Sinks Single Type 1 - for Pipelines diameter 315 mm to 700 mm Number
99
100
7 Complex Discharge: The work includes drilling in all types of soil,
including all well rock and concrete works normal (resistance cylinder
standard 21 MPa after 28 days), including wrenches, treatment and
acts of reinforced concrete floors and walls (resistance cylinder
standard 32 MPa after 28 days), including rebar and wrenches and
processing and all necessary and re-filling layers with compaction and
re-surface to what it was and re-asphalting and edgings and sidewalks
with support aspects of drilling and dewatering of groundwater if
necessary also includes the item supply and installation of the
coverage of the grille ductile cast iron, heavy duty and connectivity
drain rain water.
101
A - double complex discharge M. I
102
103
Go to the summary table
104
105
106 Table (2) rain water drainage system
8 Line downstream of the final
107
1-Aug Supply, installation and test tubes of reinforced concrete degree (5)
RCP Class V and parts special item includes drilling for all depths in
all types of soil including rock and re-filling and compaction layers with
getting rid of dust excess in accordance with the instructions of the
engineer and business support aspects of drilling and dewatering of
groundwater if necessary and Brush the bottom and around the pipes
and warning tape and cutting the work on the road and restore the
surface to what it was all necessary and in accordance with the plans
and specifications.
108
8.1.1 Pipe diameter 2000 mm depth greater than 5.00 m 5.50 m District M. I
109
110
111
2-Aug Supply, installation, testing identical special reinforced concrete cast
Active unnecessary installation on the lines of storm water network
with diameters larger than 700 mm, and the item includes drilling for
all depths in all types of soil, including the rocky soil comprehensive
business dewatering (if any) and the work of re-filling materials
suitable credit and get rid of the dust excess, as well as concrete
forming tendencies bottom (Benching) with isolated concrete surfaces
internal epoxy insulation surfaces Foreign film insulator of water from
the PVC according to specifications, and includes item also supply the
corresponding tires and blankets (Almsamth / retina), heavy duty
(according to specifications British BS 497) metal stairs and the BE-
coated material and pipe fittings, and all work necessary to complete
the work optimally, according to the plans and specifications and as
directed by the supervising engineer.
112
8.2.1 Applied to a depth of greater than 5.00 meters till 5.50 meters Number
113
114
Go to the summary table
115
116
117
Table (2) rain water drainage system
118
9 Downstream: includes work on the excavation and dewatering and re- Number
filling of the upper part of the trench material bridging the occasion
and businessman father and concrete works and props for the
protection of existing business and the settlement of the dimensions
and aspects of drilling to reach the elevations design and disposal of
materials drilling excess in designated areas as directed by the
supervising engineer and the owner and the According to the plans
and specifications.
119
120
Go to the summary table
121
122
123
Table (2) rain water drainage system
124
Page
125 Number
126 9.1
127 2-Sep
128 3-Sep
129 4-Sep
130 5-Sep
131 6-Sep
132 7-Sep
133 8-Sep
134 9-Sep
Go to the
General
135
Summary
3 distribution system, potable water and fire
A B C
Saudi Arabia
1
Ministry of Housing
Management of Procurement and Tenders
2
Table 3: drinking water distribution system
and fire
3
4 Item Unity
5 number The name of the item
1
Supply and Tkib taps burning comprehensive valve lock and a pack of
LED and special pieces and connectors and Block payment of
ordinary concrete Almquaolma sulfate (resistance cylinder 21 MPa
after 28 days) and the excavation and re-filling the layers of re-surface
origin and dewatering (if necessary) and the filter sand bars protection
20 in accordance with the plans and specifications
21
22 Go to the summary table
5 Number
34
Page
35 Number The sum of all page Words
36
37 1-Apr 0 ***
38 2-Apr 0 ***
39 3-Apr 0 ***
40 4-Apr 0 ***
41
Go to the ***
general 0
summary
42
4 sewage system
A B C
Saudi Arabia
1
Ministry of Housing
Management of Procurement and Tenders
2
Unity
Item
3 The name of the item
number
4
Supply and Tercal arrived pipes glazed pottery (VC) and parts
for the same carrying capacity of the stresses and loads high
and includes work on the excavation and dewatering,
1 groundwater and support aspects of drilling, as well as bedding
down and around pipes and packaging concrete (if necessary)
and tape warning, fittings and Alsdat future and backfill
materials selected and supported with dad layers and the
transfer of all waste to the sites approved by the employer and
includes item work pieces in the road, and re-surfaces to what it
was including all the tests and trial run according to what is
shown in the drawings, specifications and as instructed by the
5 supervising engineer with the following items:
M. I
1-Jan Pipe diameter of 200 mm for depths greater than 1.00 until
6 14:00
1-Feb M. I
7 Pipe diameter of 200 mm for depths greater than 2 until 15:00
1-Mar M. I
8 Pipe diameter of 200 mm for depths greater than 3 until 16:00
M. I
1-Apr
9 Pipe diameter of 200 mm for depths greater than 4 until 17:00
1-May M. I
10 Pipe diameter of 200 mm for depths greater than 5 until 18:00
1-Jun M. I
11 Pipe diameter of 200 mm for depths greater than 6 until 19:00
M. I
1-Jul
12 Pipe diameter of 200 mm for depths greater than 7 until 20:00
1-Aug M. I
13 Pipe diameter of 200 mm for depths greater than 8 until 21:00
M. I
9-Jan
14 Pipe diameter of 250 mm for depths greater than 2 until 15:00
M. I
1-Oct
15 Pipe diameter of 250 mm for depths greater than 3 until 16:00
16 Go to the summary table
17
11.1 M. I
18 Pipe diameter of 250 mm for depths greater than 4 until 17:00
M. I
12.1
19 Pipe diameter of 250 mm for depths greater than 5 until 18:00
M. I
13.1
20 Pipe diameter of 250 mm for depths greater than 6 until 19:00
M. I
14-1
21 Pipe diameter of 250 mm for depths greater than 7 until 20:00
M. I
15-1
22 Pipe diameter of 300 mm for depths greater than 1 until 14:00
M. I
16.1
23 Pipe diameter of 300 mm for depths greater than 2 until 15:00
17.1
24 Pipe diameter of 350 mm for depths greater than 1 until 14:00
A B C
Saudi Arabia
1
Ministry of Housing
2 Management of Procurement and Tenders
Unity
Item
3 The name of the item
number
4
Supply of soil suitable for bridge beside the walls with backfill
3/1/2026
and compaction layers to get to the required elevations
comprehensive tests and re what has been destroyed from the
asphalt sidewalks and curbs and concrete, and so on and all
63 mutatis according to the plans.
1-4-1-26 M2
65 Concrete normal thickness of 100 mm beneath the foundations
1/13/2026 Covers of iron, heavy duty in accordance with the plans and
specifications of British (BS 497) comprehensive framework the
88 following dimensions:
Number
1-13-1-26
89 Covers size 600 mm x 600 mm
Number
2-13-1-26
90 Covers size 1500 mm * 900 mm
Number
14/01/26 Ventilation shaft diameter of 200 mm from the (GRP) a
91 comprehensive network of anti-Birds.
26-Feb
92 Mechanical and electrical works:
Group
2/3/2026
Supply, installation, operation and inspection of the pump jockey
type vertical disposal 1.26 l / s at 6 bar lift the comprehensive
96 and control valves and control cables and all mutatis.
2-4-2-26
Supply, installation, testing cables of power and ground copper
unarmed low voltage (1000/600 P) and isolate the XLPE single
or multiple electrodes lying within pipes or pregnant and within
the pipes and drilling and filling and inspection chambers
99 concrete and concrete pays the price according to the following:
M. I
1-2-4-2-26
100 Cable section 3 * 10 mm 2 +10 mm 2 ground
2-2-4-2-26 Cable section 2 * 6 mm 2 +6 mm 2 ground M. I
101
102 Go to the summary table
Number
Supply and installation of the control group and the signal
3-4-2-26 cables complete single or multiple electrodes within the pipes
pregnant or higher, including pipes, boxes and all the necessary
103 extension.
Group
A B C
Saudi Arabia
1
Ministry of Housing
Management of Procurement and Tenders
2
Unity
Item
3 The name of the item
number
4
The work includes drilling in all types of soil and re-filling layers
with compaction and re-surface to the origin and supply ducts
cables from the UPVC diameter 160 mm spacers between the
sewer and the terminal transverse END BELL and concrete
bedding (stress fracture of the cylinder standard 32 MPa after
28 days) and the surrounding sewage , and expansion joints
where necessary filling and insulate the sewer backup work
includes warning tape and punctuation and all the accessories
and Mandrell test carried out all the work in accordance with the
15 specifications and drawings
M. I
3-Jan
16 Cable ducts type UPVC Qatar 4 * 160 mm
6
27 Low voltage distribution boxes (Minipillars):
Number
8
35 Cable ducts optical fiber:
A B C
Saudi Arabia
1
Ministry of Housing
Torbd, install and connect the lighting poles are made of galvanized
steel, hot-and lighting equipment is complete, the degree of protection
IP54, with inverter and control tools, lamps and publisher base / tray
fuses, and the work includes column base concrete comprehensive
rebar, templates, and treatment (resistance cylinder standard 25 MPa
- N / mm 2 after 28 days), pipes, cables and poles grounding
necessary either pole individually for each column or network
grounding and continuous angles supporting and accessories
installation and installation and connectivity with manholes necessary,
and includes work well drilling in all types of soil including rock and re-
filling with compaction layers and paint concrete surfaces in contact
with Soil three aspects of bituminous cold, and the settlement of the
surface and all necessary civil works, according to other plans and
technical specifications for the delivery of work in the best, pays the
7 price in accordance with the following:
8 Go to the summary table
9 Table 7: Page 1 of 7
10
Unity
Item
11 The name of the item
number
12
Number
Lighting column height of 14 meters, armchair and lighting device 2 *
13 1-Jan 400 watt, sodium vapor lamp, high pressure.
14
Number
Lighting column height of 12 meters, armchair and lighting device 2 *
15 2-Jan 250 watt, metal halide lamp.
16
Number
Lamppost courts, up 12 meters and a lighting 2 * 1000 watt, metal
17 3-Jan halide lamp.
18
Number
Lighting column rising 10 meters with one arm and a lighting 1 * 250-
19 4-Jan watt, metal halide lamp.
20
Number
Lamppost, up 7 meters installed opposite my arm and lighting device
2 * 250 watt, metal halide lamp, reflectors asymmetrical arm on the
first device mounted on high 19:00 and the second arm with Aljhow
21 5-Jan compound at an altitude of 18:00
22
Number
Lamppost, up 7 meters with one arm and a lighting 1 * 250-watt, metal
23 6-Jan halide lamp.
24
Number
Lamppost rise 17:00 armchair and lighting device 2 * 250 watt, metal
25 7-Jan halide lamp.
26 Go to the summary table
27 Table 7: Page 2 of 7
28
Unity
29 Item
The name of the item
number
30
59 1-Mar Panel distribution and street lighting and fields Capacity / 400 / AMP
60 Go to the summary table
61 Table 7: Page 5 of 7
62
Unity
Item
63 The name of the item
number
64
65 4 Panel distribution and street lighting and fields Capacity / 100 / AMP:
A B C
Saudi Arabia
1
Ministry of Housing
Item
4 The name of the item Unity
number
5
6 Feeding system - Civil Works
7
1
Item
20 The name of the item Unity
number
21
42
47
59
Item
75 The name of the item Unity
number
76
HDPE pipes of diameter 23 mm coated with concrete or sand
77 3 regular
1-Mar Supply and installation of pipelines of high-density polyethylene
HDPE 32 mm in diameter are used for cable connections
clients. Are pipe fitting buried underground or placed in open
trench or through the hole in one direction and HDPE pipes is a
streams to track wire flexible, non-metallic made of polyethylene
high density so as to provide a channel protective cables and
wires used in connections streams and canals underground or
tube was internal wire and cables. It includes item on drilling
and filling and packing the concrete and fittings pipes and
elbows and fetch and sealant and solvent cement and wire
drag-and-tape warning and work tests the pipes to be free of
obstacles and all the accessories and fittings necessary to
complete the work and re-roofed to what it was, according to the
plans and specifications and as directed by the supervising
engineer.
78
153
154 1-May Manholes manual (Bguetaúan) Number
155
156 Go to the summary table
157 Table 8: Page 9 of 9
158
Go to the
General 0
Summary
175
9 Acts Agriculture and Landscaping
A B C
Saudi Arabia
1
Ministry of Housing
2 Management of Procurement and Tenders
Item
4 The name of the item Unity
number
5
67 3 Public trees
68 1-Mar Nim Number
69 2-Mar Squirt high Number
70 3-Mar Squirt Number
71 4-Mar Pods wireline Number
72 5-Mar Acacia Salkina Number
73 6-Mar Sewn of Fire Number
74 7-Mar Asersus Number
75 8-Mar Tree wooden buttons Number
General summary
A B C
Project implementation of infrastructure works for the housing
projects in the regions of the Kingdom
1
2 Housing sites Arar
Table Description The total price
3 No.
Numb
4 er
5 1 Road works 0
2 Rain water drainage system 0
6
3 Drinking water distribution system and fire 0
7
4 Sewage system 0
8
5 Irrigation network 0
9
6 Site Feed powered electric 0
10
7 Street lighting system and squares 0
11
8 Network Communications 0
12
9 Agriculture and coordinate the work site 0
13
Total 0
14
POQ.xlsx
D E F G H
Project
implementation of
infrastructure works
Housing sites
Arar
The total price
Unit Price
Quantity
Number Writing Number Writing
1 *** 0 ***
0 ***
194 150 *** 0 ***
0 ***
93.529 *** 0 ***
12 *** 0 ***
1 *** 0 ***
1 *** 0 ***
1 *** 0 ***
1 *** 0 ***
6 *** 0 ***
0 ***
26.717 *** 0 ***
0 ***
1,951 0
67 *** 0 ***
78 *** 0 ***
12 *** 0 ***
0 ***
69 *** 0 ***
44 *** 0 ***
52 *** 0 ***
39 *** 0 ***
20 *** 0 ***
44 *** 0 ***
0 ***
ROI Words
(SAR)
0 ***
0 ***
0 ***
0 ***
0 ***
0 ***
0 ***
ge system
D E F G H
Project
implementation of
infrastructure works
Housing sites
Arar
0 ***
Table 2: Page 1 of 8
41 *** 0 ***
41 *** 0 ***
58 *** 0 ***
33 *** 0 ***
35 *** 0 ***
0 ***
Table 2: Page 2 of 8
48 *** 0 ***
35 *** 0 ***
Zero 0 ***
41 *** 0 ***
50 *** 0 ***
55 *** 0 ***
63 *** 0 ***
80 *** 0 ***
0 ***
Table 2: Page 3 of 8
103 *** 0 ***
110 *** 0 ***
24 *** 0 ***
Zero 0 ***
Zero 0 ***
0 ***
Table 2: Page 3 of 8
2 *** 0 ***
22 *** 0 ***
5 *** 0 ***
1 *** 0 ***
1 *** 0 ***
3 *** 0 ***
0 ***
Table 2: Page 4 of 8
4 *** 0 ***
12 *** 0 ***
13 *** 0 ***
8 *** 0 ***
1 *** 0 ***
1 *** 0 ***
0 ***
Table 2: Page 5 of 8
170 *** 0 ***
81 *** 0 ***
0 ***
Table 2: Page 6 of 8
1,100 *** 0 ***
7 *** 0 ***
0 ***
Table 2: Page 7 of 8
1 *** 0 ***
0 ***
Table 2: Page 8 of 8
ROI Words
(SAR)
0 ***
0 ***
0 ***
0 ***
0 ***
0 ***
0 ***
0
0 ***
0 ***
ble water and fire
D E F G H
Project
implementation of
infrastructure works
Housing sites
Arar
13 *** 0 ***
0 ***
84 *** 0 ***
18 *** 0 ***
55 *** 0 ***
0 ***
2 *** 0 ***
51 *** 0 ***
51 *** 0 ***
0 ***
638 *** 0 ***
0 ***
tribution system and fire
Words
***
***
***
***
***
em
D E F G H
Project
implementation of
infrastructure works
Housing sites
Arar
Quantity
Unit Price The total price
0
2,501 *** ***
0
1,524 *** ***
0
674 *** ***
0
371 *** ***
0
157 *** ***
0
164 *** ***
0
151 *** ***
0
244 *** ***
0
303 *** ***
0
0 ***
51 *** ***
0
59 *** ***
0
75 *** ***
0
75 *** ***
0
150 *** ***
0
76 *** ***
0
321 *** ***
0
0 ***
63 *** ***
0
39 *** ***
0
28 *** ***
0
13 *** ***
0
7 *** ***
0
3 *** ***
0
3 *** ***
0
2 *** ***
0
0 ***
10,643 *** ***
0
38 *** ***
0
1 *** 0 ***
1 *** 0 ***
0 ***
price (SAR)
Words (SAR)
***
***
***
***
***
work
D E F G H
Project
implementation of
infrastructure works
Housing sites
Arar
Quantity Unit Price The total price
0 ***
600 *** 0 ***
1,000 *** 0 ***
10 *** 0 ***
0 ***
7 *** 0 ***
47 *** 0 ***
0
120 *** 0 ***
98 *** 0 ***
0 ***
1 *** 0 ***
55 *** 0 ***
18 *** 0 ***
0 ***
6,500 *** 0 ***
0 ***
1 *** 0 ***
1 *** 0 ***
3 *** 0 ***
0 ***
3 *** 0 ***
2 *** 0 ***
0 ***
405 *** 0 ***
0 ***
392 *** 0 ***
388 *** 0 ***
6 *** 0 ***
4 *** 0 ***
160 *** 0 ***
4 *** 0 ***
0 ***
4 *** 0 ***
2 *** 0 ***
8 *** 0 ***
8 *** 0 ***
4 *** 0 ***
2 *** 0 ***
2 *** 0 ***
0 ***
2 *** 0 ***
1 *** 0 ***
90 *** 0 ***
75 *** 0 ***
0 ***
1 *** 0 ***
2 *** 0 ***
36 *** 0 ***
18 *** 0 ***
42 *** 0 ***
20 *** 0 ***
0 ***
2 *** 0 ***
36 *** 0 ***
2 *** 0 ***
4 *** 0 ***
2 *** 0 ***
4 *** 0 ***
2 *** 0 ***
0 ***
price (SAR)
Words (SAR)
***
***
***
***
***
***
***
***
***
***
***
***
***
***
***
***
trothermal
D E F G H
Project
implementation of
infrastructure works
Housing sites
Arar
Zero
13 *** 0 ***
3 *** 0 ***
0 ***
269 *** 0 ***
45 *** 0 ***
0 ***
22.064 *** 0 ***
0 ***
615 *** 0 ***
5 *** 0 ***
6 *** 0 ***
0 ***
price (SAR)
Words (SAR)
***
***
***
***
***
ary table
stem
D E F G H
Project
implementation of
infrastructure works
Housing sites
Arar
Table 7: Page 1 of 7
Quantity Unit Price The total price
8 *** 0 ***
28 *** 0 ***
0 ***
Table 7: Page 2 of 7
Quantity Unit Price The total price
Table 7: Page 3 of 7
Quantity Unit Price The total price
0 ***
Table 7: Page 4 of 7
3 # 0 # NAME?
NAME?
0 # NAME?
Table 7: Page 5 of 7
Quantity Unit Price The total price
3 # 0 # NAME?
NAME?
2 # 0 # NAME?
NAME?
0 # NAME?
Table 7: Page 6 of 7
520 # 0 # NAME?
NAME?
20 # 0 # NAME?
NAME?
20 # 0 # NAME?
NAME?
0 # NAME?
Table 7: Page 7 of 7
sthetic (SAR)
Words (SAR)
***
***
***
***
# NAME?
# NAME?
# NAME?
# NAME?
etwork
D E F G H
Project
implementation of
infrastructure works
Housing sites
Arar
*** ***
1 0
*** ***
9 0
*** ***
2 0
*** ***
1 0
*** ***
1 0
0 ***
Table 8: Page 1 of 9
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
42 0
*** ***
96 0
*** ***
81 0
*** ***
782 0
*** ***
155 0
*** ***
48 0
*** ***
10 0
0 ***
Table 8: Page 2 of 9
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
3 0
*** ***
1 0
*** ***
2 0
*** ***
2 0
*** ***
10 0
0 ***
Table 8: Page 3 of 9
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
112 0
*** ***
19 0
*** ***
877 0
*** ***
36 0
*** ***
6,453 0
*** ***
783 0
0 ***
Table 8: Page 4 of 9
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
15 0
*** ***
15 0
*** ***
4 0
*** ***
5 0
*** ***
1 0
*** ***
2 0
*** ***
1 0
*** ***
2 0
0 ***
Table 8: Page 5 of 9
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
5,647 0
*** ***
1,637 0
*** ***
1,379 0
*** ***
1,252 0
*** ***
1,046 0
*** ***
601 0
*** ***
364 0
*** ***
202 0
*** ***
78 0
*** ***
67 0
0 ***
Table 8: Page 6 of 9
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
18 0
*** ***
4 0
*** ***
10 0
*** ***
12 0
*** ***
29 0
*** ***
11 0
*** ***
15 0
*** ***
13 0
*** ***
1 0
0 ***
Table 8: Page 7 of 9
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
972 0
*** ***
770 0
*** ***
628 0
*** ***
673 0
*** ***
936 0
*** ***
360 0
*** ***
442 0
*** ***
258 0
*** ***
7 0
0 ***
Table 8: Page 8 of 9
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
78 0
0 ***
Table 8: Page 9 of 9
sthetic (SAR)
Words (SAR)
***
***
***
***
***
***
***
***
***
***
Landscaping
D E F G H
Project
implementation of
infrastructure works
Housing sites
Arar
60 *** 0 ***
85 *** 0 ***
0 ***
Table 9: Page 2 of 6
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
17 0
*** ***
365 0
*** ***
45 0
*** ***
40 0
310 *** 0 ***
*** ***
20 0
*** ***
20 0
*** ***
20 0
*** ***
20 0
45 *** 0 ***
15 *** 0 ***
25 *** 0 ***
20 *** 0 ***
35 *** 0 ***
335 *** 0 ***
7 *** 0 ***
35 *** 0 ***
13 *** 0 ***
0 ***
Table 9: Page 3 of 6
Unit Price The total price
Quantity
Number Writing Number Writing
11 *** 0 ***
*** ***
250 0
0 ***
Table 9: Page 4 of 6
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
9 0
30 *** 0 ***
220 *** 0 ***
*** ***
195 0
0
0
135 *** 0 ***
*** ***
255 0
*** ***
1,090 0
*** ***
8,255 0
*** ***
87.88 0
*** ***
9,015 0
*** ***
26,000 0
0 ***
Table 9: Page 5 of 6
Unit Price The total price
Quantity
Number Writing Number Writing
*** ***
17,820 0
*** ***
11,425 0
*** ***
14,260 0
*** ***
*** ***
2,305 0
*** ***
20 0
*** ***
2 0
0 ***