The document outlines a shutdown job for MBF-1, listing 41 tasks across various areas. Key tasks include inspecting all valves for full open and close operation, rectifying any valve leakages, cleaning gas and air lines, checking the MCV and MSV, and changing the cooler ring on tuyere no. 10 in the furnace. The job covers maintenance and inspections of valves, lines, control valves, and repairs to prepare MBF-1 to restart operations.
The document outlines a shutdown job for MBF-1, listing 41 tasks across various areas. Key tasks include inspecting all valves for full open and close operation, rectifying any valve leakages, cleaning gas and air lines, checking the MCV and MSV, and changing the cooler ring on tuyere no. 10 in the furnace. The job covers maintenance and inspections of valves, lines, control valves, and repairs to prepare MBF-1 to restart operations.
The document outlines a shutdown job for MBF-1, listing 41 tasks across various areas. Key tasks include inspecting all valves for full open and close operation, rectifying any valve leakages, cleaning gas and air lines, checking the MCV and MSV, and changing the cooler ring on tuyere no. 10 in the furnace. The job covers maintenance and inspections of valves, lines, control valves, and repairs to prepare MBF-1 to restart operations.
1 All vulve inspection of full open & full close 2 Vulve Leakage rectification job 3 Gas & Air line should be clean 4 MCV & MSV to be check Stove 5 6 7 8 9 Furnace Tuyere no 10 cooler ring should be change 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41