GOVERNMENT OF TRIPURA
DEPARTMENT OF AGRICULTURE
(ENGINEERING WING)

HISTORY SHEET

i 4| ^r^
^ t+. t-^a. 4 r t^^t^A .:-0alD/2ot5'
11) l)n1q
Estimate No:- T.S No-..y..*./cE lAeri/DA/MGNREGA/TS/201s-16lDated ^^

l\lAME OF THE WORK:-Model Estimate for instatlation of _shatlow Tube well with 1'5

,. :

Department :' Department of Agriculture.

Scheme:- MGNREGA

of concerned DM & Collector'


Administrative Approval & Expenditure sanction :- As per communication

during 2015-16'
Fund Available / NotAvailable:- Available under MGNREGA Scheme

Director of Agriculture, Govl--of Tripura


Mention reference on which estimate is preparedi As per instruction by the
lsilll2}lsandmeetingheldon0lll2t20l5intheofficechamberof cE
trio.*.rono.F.21(12)-Agri/SS/2015-16/2112Dated,
(Agri)in this regard.

Estimate is revised :'No.

lf yes , mention the earlier T'S. No.:-Nil

REPORT:'

as per decision of the Director, Department of Agriculture, Agbrtala and


The estimate has been framed
(Agri) in his office
subsequently discussion helcl in the meeting conducted by the Chief Engineer
for finalization of
chamber held on oL/12/2075 vide notice no. F.1(65)-CE/AGRI/2014-15/950-55 Daled,2811112015
based on cunent RD approved rate (HPC
specification of this work. All necessary items have been included in the estimate
in the estimate.
uipiouuO rate). Beside this 3% for contingency & 1% labour CESS are considered

Estimate cost:- 31,200/- (Rupees thirty one thousand two hundred) only.

rate)'
Schedute of Rate:- As per RD Schedule & latest RD approved rate (HPC approved

Method :- DePartmental Execution'

Availability of site: Avaitable as finalized by the PRI Body'

Demarcation is done:-

Tentative completion time :' 10 (Ien) days'

ffir
i\

ffkfr;fr,
Junior Engineer Executive Engineer
Department of Agriculture
S up

De
erintb n di ig E n gi n e e r
partme nt of Agric ulture
d,,,5%
D ep a rtm e nt A gr ic u ltyr e
Department of Agriculture
i
r cl,
I oDl,
.ii ii

i:l
a
ii
''l

NAME OF THE WORK:-Model Estimate for installation of shallow Tube well tnritlr L.5 'i,i
HP under MGNREGA during 2015-16.
l ,t it

l.ji

r:i:
ANNEXURE-II :ir
'r:it

SL DESCRIPTION ACTIVITV OUT MATERIAI, LAB l,ir;


| :i
No PUT TO BE
MEASURED(!VIT
OUR
l,i
I ::;
I'
H UNIT) l,
.,
l,'
I il
I J 4
a!
5 l,:,
t.
t:,i
I Construction of Barak Bamboo scaffolding for I job l.,;i
drilling & Iowing of the tube-well in/c cutting a
t;
Barak US:2
lrlr r;j
tank 2.00 m X 2.00 m X 0.90 m size in drilling & : i'l

cutting the two tank with 0.30 m width & 0.15 m


Barnboo: 3
rlii
deep drain. il
Ii1l
:li
Coir rope = I ;: i

kg
.

GI wile:0.50

.,
Drilling & Boring of pilot hole in any soil strata by B0 mm dia N {.JS-2
manual means collection of soil samples of 32.00 m/ per
HS=
different strata met with during driliing at well I

various suitable levels, preservation of samples


sk= r

in polythene Bags sample boxes and disposed of


excess soil on mud including the cost for water
ete as required to maintain the project hole
properly as per specification & direction of the
Engg-in-change.

3 Reaming the pilot hole to an enlarged bore hole B0 mm dia N US-3


in any soil strata by manual means, disposal of 32.00 m/ per
excess soil an mud, including the cost of water HS=4
well
etc as required to maintain the bore hole
Ssl<-
properly as per specification and direction of the
2
Engineering - in - Charge.

4 providing & lowering of UPVC pipe as per IS: UPVC 50mrn dia UPVC pipe FIS=
L28L8 after washing of the bore hole by manual nominal bore. 50mrr NB I

means as per specification & direction of the :24.00m


RS pipe =24.00rn US_ i
Engg-ln-Charge.
:6.00rn
RS pipe:
6.00rr

\.,
i-)
1il \
l*--',^ i.\,^t6
t6 f'
:rl,
lli
ilil
:ii:
j: !i
r,ii;
Deveiopment & r,vashing the tube r'vell by using 1x30.00m-30.0rn Us: I
,,;i t:
j.ii t:
air compressor (Dlesel operated J until sand lree ':'1i i:
:'i'
Hs: I
iil lr
clear water is available as per direction of the t:
1,

Engineer in Charge. r;l'


ii,t
i
Providing and fitting fixing of pump having riir li
6 lNo PLrnrp: I no HS:I
iir
1.5HP motorfwater filled) suitable for 50 mm X
50 mm bore complete petrol start kerosene run
or diesel operated in all respect as per direction
of the Engg. - in-charge. (CRI/KSB/Worthington/
Taxmo /Lubi /Kirloskar) .

9 Providing and fitting fixing of G.l Bend / elbow in iJ40mmdia NB GI iJ40mmciia.


the pipelines in/c testing the joints, complete as bend=1no NB GI

per direction ofthe Engg-ln- change . bend =1 no

il 4Ommdia NB
10 Providing and fitting G.l reducer with pipe line lno 50mmX40 For
including testing of joints complete as per CPWD mm reduceq SI
specification and direction of the Engg-ln- no.9
change. =1no &l t.

Size : 50 mm X 40 mm Hs: I

N0TE:- This is a model estimate . As per site condition, measurement of work will be taken
into consideration for actual execution and accordingly, recorCed in MB/Fiel Book and wages
components to be fixed for corresponding volume of work for generation of FTO.

-
{Efizltr :.
Junior Engineer Executive Efiginber .:

O/O the superintending Engineer O/O the superintending Engineer


Department of agriculture Department of Agriculture

I (t
76 0:
il
lr
;j
,:

NAME OF THE WORK:-Model Estimate for installation of shallow Tube wetl;w!th 1.5,1
,] t:
HP under MGNREGA during ZO15-16. t
l
l
ANNEXT-]RE:III

REQUIREMENT OF MATERIALS /LAI]OUR COMPONENT AND FUND FOR'IIIE WOI1K

SL. NO DESCRIPTION UNIT REQUIREMENT COST I}ER COST OF


AS PER UNIT. WORK
ANNEXURE-II
I ) 4 5 6
1 Barak Barnboo no J 150.00 4s0.00
1 Coir rope kg r.00 50.00 50.00
3 UPVC m 24.00 9r.00 2 r 84.00
Pipe(50mm)
4 Strainer(50mm) No 4 261.00 1041.00
,!.80m each
5 Pump Motor No I I8,500.00 r8.s00.00
1.50 HP Diesel
start kerosene
run or diesel
operated
6 GI pipe(40mm) ITI 12.00 208.00 2496.00
7 GI Tee(4Omm) no I 68.00 68.00
8 Cutter (40mm) no I 150.00 r50.00
10 GI wire kg 0.50 50.00 25.00

11 HS M.Day 09 290.00 2610.00


t2 SK I'l.Day 1 254.0A 2s4.00.
13 S/SK M.Day 2 218.00 436.00
14 US M.Day 09 189.00 1701 .00
Rs29.968.1
Add l% Labour cess (+) Rs.300/-
Add3% contingencyforSign board and documentation etc (+) Rs.900/-
Rs.3 1, 1 68/-
Say Rs.31,200/-

\ ,.- O/O the superintyfrng. Engi neer


+rn,
Executive Engirnccr
46(i;
Super intCrrdir rg Errgirreer
Departrnent-of agri cLri t Lrre

O/O the superintending Engineer O/O the Chief Engineer


Department of Agriculture Department of A griculture
T.S No:-....[.?* /CE /A}rI/DA/MGNREGA/TS /20Ls-L6/Dated:04/12/2015. ,

Technically Approved for an amounting to 37,200|- (Rupees thirty one thousand two hundred)
bnly

Chief Engineer,
Department of Agriculture

'^! r^l
,/lt