23 Fig. 3.3.4. The primary structure here is rein-


14 forced concrete. The facade posts are fixed to
24
the main structure via a cast-in slotted channel.
The connection of the upper facade panel must
be impervious to vapour diffusion. Sunshading
13
in front of the facade should be fixed independ-
ently of the facade construction (warranty prob-
21 1 2 7 12 lems). A fascia panel conceals the sunshading
installation.
3.3.4