Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

Considerations for Lean

Tooling Solutions
Paul D. Parent
ProSol LLC, Sterling Sintered Technologies,
Human Side of Lean Tech Group
for SME Cutting Tools & Tooling
Systems Tech Group
Contact paul@prosol.us
Introduction
My Background
Goal of this presentation
Target audience
Our Definitions
Tooling: Components and support accessories
that form or otherwise add value to the actual
part we are creating.

Solution: Waste reducing response to a customer


or stake holder need, not an unsolicited offer to
address a situation not defined by stakeholders.
Lean (Manufacturing)
A systematic approach to identifying and
eliminating waste (non-value-added activities)
through continuous improvement by flowing
the product at the pull of the customer in
pursuit of perfection

-- The MEP Lean Network


Lean Principles: 7 & 1 Wastes
„ Waiting „ Overproduction
„ Excess travel „ NVA processing
„ Excess motion
„ Excess Inventory
„ Defects
„ Underutilized people
Tooling Improvement Focus
Traditional Lean
„ Less time-in-the-cut „ Speeds that support
equals longer life and takt time
faster cycle time „ +Predictable, tool life
„ Reduction of value „ Total/Life cycle cost of
adding time system
„ Lower purchase cost „ Cycles within takt time
„ Reduction in non-value-
added (NVA) time also
Lean Tooling Solutions
Supports customer
demand
„ Quantity CUSTOMER
DEMAND
„ Quality
„ Delivery
„ Cost Lean
Tooling
Solution
Lean Tooling Solutions
Tooling must meet process demand as defined
by lean filters: minimal waste
„ Quantity required CUSTOMER
„ Defect free DEMAND

„ Free of NVA processing


„ Reliably (=whenever required)

Pr
Wait-free

g
„
in

oc
ol

es
To

s
Waste free
Audience: Please suggest some waste that
affects lean tooling solutions

„ Underutilized tools- we bought too many


and they sit unused (excess inventory)
„ Poor quality: they don’t perform as they should
„ Misapplied tools, overkill for the job, waste of $
„ Excess Travel: machines too far apart
„ Poor planning too much stock left on casting,
material and NVA processing waste.
Waste that impacts tool
performance
Waiting:
„ Signoff of requisitions
„ For delivery
„ Access (lines at crib, looking for supervisor)
„ Replenishment
„ Availability: For tool to come out of another
machine
Unnecessary Travel:
„ Searching
„ To tool crib, other storage areas
Waste that impacts tool
performance
Non Value-Add Processing:
„ Inefficient cycles-extra cuts
„ Sub-optimized speeds and feeds
„ Finishes that don’t add value- just time
„ “Safe” programming-long after the process is
proven (still in training wheels)
„ Poor application/tool match
Lean Tooling Solutions
Enabled by a lean support system
„ Reliable, adequate equipment
and processes CUSTOMER
DEMAND
„ Replenishment system
„ Information, technical
cooperation

Pr
g
in

oc
Lean
ol

es
Tooling
To

s
Solution

Support System
Support system
NEEDS Lean Practices
„ Reliable, adequate „ PM, TPM
equipment and methods
„ SPC, SQC
„ Standardized methods
„ Mistake proofing
¾ Replenishment system ¾ Supply kanban/ visual controls
supports
¾ Access POUS and 5-S

™ Teamwork (not group-


™ Responsive, support
squabble or pass-the-problem)
Continuous Improvement Culture
KAIZEN
Screw cell
Problem Solution
„ Screw-making cells „ Implement POUS of
consumable tooling and
„ 250 feet from crib parts
„ Must turn in old to get „ Load cart with replaced tools
replacement and turn in at end of shift
„ Avg. 1 trip/hr ( 7 min) „ From 4000 ft. To 500 ft
travel per shift (std. travel)
for replacement tools
„ 54 minutes to 7 minutes
„ 16 shifts /week „ 87% reduction
Couldn’t produce to takt time
Problem Solution
„ Bottleneck CNC drilling „ Replaced with $28.00 coated
centers carbide 3 flute drill
„ Drilling 1215 steel, brake „ Ran at 40 IPM
field cups „ Tool life 3-weeks CPK
„ Feed 14 IPM doubled
„ Trouble holding depth „ Met takt time with quality
„ Jobber drill w/helical point improvements do to triple
„ $1.80 drill cost >1 per shift feed rate and time saved not
adjusting offsets and
replacing drills.
Die life
Problem Solution
„ Unreliable die life
„ Discovered during Kaizen
„ Does could last 2 hrs or 3 event
days
„ Implemented system for
„ Intermittently affected about
45 machines balancing coolant every 24
hours (PM)
„ Engineering could find no
correlation between die „ Never add water, always
material and hardness and make-up mix
poor tool life „ Problem vanished
„ No standardized system „ Reduced down-time for tool
monitoring coolant condition replacement and stock-outs
When people don’t seem interested
in lean
„ Start with their problem (not your fix)
„ Be coaches, mentors, and teammates not authorities or
experts
„ Avoid criticizing or perfecting other peoples ideas
„ Advocate for the guy or gal on the floor; support their
needs
„ Support every improvement
„ Constantly build upon innovation (breakthrough
methods) with daily continuous improvement (kaizen)
„ As long as you’re moving forward
Implementing Lean Tooling
Solutions
„ Kaizen events-
„ Team projects, and goals (work well
in cellular mfg.)
„ Ongoing pursuit of continuous
improvement (Kaizen) on pull from
process owners.
Tool solutions as systems
Lean solutions begin with a clear understanding of
need from a process owner’s perspective.
Solutions include:
„ Choice: what tool
„ Total cost: not merely purchase cost
„ Procurement: methods
„ Replenishment: methods
„ Access: find it when you need it
„ Support: technical,equipment/ special , C.I.
„ Application parameters

ALL THE SUPPORT IT TAKES FOR THE TOOL TO BE A


CONTRIBUTER AND NOT A CONSTRAINT
Question & Answer
Thank you
for participating!

For more information, visit/contact:

The SME Human Side of Lean Tech Group:


www.sme.org/lean

The SME Cutting Tools & Tooling Tech Group:


www.sme.org/tools

You might also like