This document provides a cost estimate for road construction work from the gate to the Lugano Cluster in CitraLand Palembang, Indonesia. It includes the costs for preparatory work, constructing the main road out of concrete K-300 with a thickness of 25cm and wire mesh, drainage work including excavation and installation of pipes and grates, and additional work like plastic curbs and manholes. The total cost is calculated by summing the costs of these different elements of the construction work.
This document provides a cost estimate for road construction work from the gate to the Lugano Cluster in CitraLand Palembang, Indonesia. It includes the costs for preparatory work, constructing the main road out of concrete K-300 with a thickness of 25cm and wire mesh, drainage work including excavation and installation of pipes and grates, and additional work like plastic curbs and manholes. The total cost is calculated by summing the costs of these different elements of the construction work.
This document provides a cost estimate for road construction work from the gate to the Lugano Cluster in CitraLand Palembang, Indonesia. It includes the costs for preparatory work, constructing the main road out of concrete K-300 with a thickness of 25cm and wire mesh, drainage work including excavation and installation of pipes and grates, and additional work like plastic curbs and manholes. The total cost is calculated by summing the costs of these different elements of the construction work.
Pekerjaan Jalan Beton Dari Gerbang Menuju Cluster Lugano
No. Uraian Pekerjaan Satuan Volume Harga Satuan Jumlah harga I Pek. Persiapan 1 Mob - demob alat Ls 1,00 2 Pengukuran & as built drawing Ls 1,00 3 keamanan Ls 1,00 4 Direksi keet Ls 1,00 Subtotal I II Pek. Jalan Utama 1 Pembentukan, penyiapan badan jalan & pemadatan vibro m2 10.725,80 2 Cor Beton K-300, t=25cm, wiremesh m6 - 1 lapis m3 2.681,45 termasuk dowel p=80cm tiap jarak 50 cm dia. 19mm, sealer aspal Subtotal II III Pek. Saluran 1 Galian Tanah u/ saluran m3 1.505,37 2 Pas. Gorong-gorong dia. 60 cm termasuk dudukan & kuncian m' 612,70 3 Pas. Gorong-gorong dia. 80 cm termasuk dudukan & kuncian m' 200,00 4 Pas. Gorong-gorong dia. 100 cm termasuk dudukan & kuncian m' 190,70 5 Sal. Pipa wavin AW dia. 3" panjang 3m - 2bh, tiap inlet 6m' incld acess unit 168,00 6 Grill besi uk. 20x30cm, tiap inlet 6m', plat strip 3x30mm unit 168,00 Subtotal III IV Pek. Lain - Lain 1 Plastic cor m2 10.725,80 2 Kansteen Slipform k-300 uk. 60x15 cm m' 1.710,58 3 Manhole bata plester aci, uk. 80 x 80 cm, include tutup beton bh 31 Subtotal IV Total