Opinion On Time Extension of MSC
Opinion On Time Extension of MSC
Opinion On Time Extension of MSC
The main objective of services under Terms of References (TOR) is to assist PD and
PMU so that they could manage their duty in connection with the implementation of
the RTIP-II Project efficiently and effectively.
Page 1 of 4
Current Activities of MSC
Diagram
MSC
R1 R2
Page 2 of 4
Role of MSC
Implementation:
Field Visits due to Time Schedule ordered by PD perform usually behind scheduled
construction sites. The purpose of visiting are supervise and advice the construction
sites in order to work according to Quality Control Manual. Therefore, I review the
conditions of site environments before site visiting with the concerned materials
which are Design, Drawings and Specifications. Road Design Typical Sections
include Quality Control Assurance (This book was published by MSC in July 2014).
The field Visit Report contains the data analyzed by pending problems in sites and
actual conditions of Engineering and Technical which need improvement or revise
items based on Quality Assurance Manuals.
Reports
Monthly Progress report, Quarterly Progress Report and Annual Progress Report by
Regular Physical and Financial Progress Monitoring are prepared and submit World
Bank through PD in RTIP-II.
Moreover, Reports of Social cum Resettlement and Environmental areas are prepared
and submit by MSC Senior Specialists which cannot be prepared by D&SC (R-1 & R-
2) because they have only Junior Social and Environmental Specialists.
Conclusion
The on-going RTIP-II has to perform better Engineering Management (Time Schedule
Management and Financial Management) due to Design, Drawings, standard Road
Section, Specification and Quality Assurance Manual even institutional items. The
paragraph of “output-based approach” is the principle of roadway preparation and
standard requirement for roadway construction.
Finally, better reports based on above mentions to World Bank through Project
Director are also very important.
Page 3 of 4
Attachments:
i. List of MSC staffs
ii. Field Visit Reports (Example)
iii. Quality Assurance Manual
Page 4 of 4