For all site civil engineers

Er.Pawan Dhagate
Email- Pawan.dhagate@gmail.com
 M5 = 1:4:8
 M10= 1:3:6
 M15= 1:2:4
 M20= 1:1.5:3
 M25= 1:1:2
 1.FOOTINGS : 50 mm
 2.RAFT FOUNDATION.TOP : 50 mm
 3.RAFT FOUNDATION.BOTTOM/SIDES : 75 mm
 4.STRAP BEAM : 50 mm
 5.GRADE SLAB : 20 mm
 6.COLUMN : 40 mm
 7.SHEAR WALL : 25 mm
 8.BEAMS : 25 mm
 9.SLABS : 15 mm
 10.FLAT SLAB : 20 mm
 11.STAIRCASE : 15 mm
 12.RET. WALL : 20/ 25 mm on earth
 13.WATER RETAINING STRUCTURES : 20/30 mm
 6mm = 0.222Kg
 8mm = 0.395 Kg
 10mm = 0.616 Kg
 12mm = 0.888 Kg
 16mm = 1.578 Kg
 20mm = 2.466 Kg
 25mm = 3.853 Kg
 32mm = 6.313 Kg
 40mm = 9.865 Kg
 1feet-0.3048m
 1m-3.28ft
 1sq.m-10.76sq.ft
 1cu.m-35.28cu.ft
 1acre-43560sq.ft
 1cent-435.6sq.ft
 1hectare-2.47acre
 1acre-100cent-4046.724sq.m
 1ground-2400sq.ft
 1unit-100cu.ft-2.83cu.m 1square-100sq.ft
 V=(Pi/4)*Dia x DiaX L=(3.14/4)x D x D X 1
(for1m length) Density of Steel=7850 kg/ cub
meter
 Weight =
 Volume x Density=
 (3.14/4)x D x D X1x7850 (if D is in mm ) So =
((3.14/4)x D x D X1x7850)/(1000x1000) =
Dodd/162.27
 M10 ( 1 : 3.92 : 5.62)
 Cement : 210 Kg/ M 3
 20 mm Jelly : 708 Kg/ M 3
 12.5 mm Jelly : 472 Kg/ M 3
 River sand : 823 Kg/ M 3
 Total water : 185 Kg/ M 3
 Fresh concrete density: 2398 Kg/M 3
 M20 ( 1 : 2.48 : 3.55)
 Cement : 320 Kg/ M 3
 20 mm Jelly : 683 Kg/ M 3
 12.5 mm Jelly : 455 Kg/ M 3
 River sand : 794 Kg/ M 3
 Total water : 176 Kg/ M 3
 Admixture : 0.7%
 Fresh concrete density: 2430 Kg/ M 3
 M25 ( 1 : 2.28 : 3.27)
 Cement : 340 Kg/ M 3
 20 mm Jelly : 667 Kg/ M 3
 12.5 mm Jelly : 445 Kg/ M 3
 River sand : 775 Kg/ M 3
 Total water : 185 Kg/ M 3
 Admixture : 0.6%
 Fresh concrete density: 2414 Kg/ M 3
 Note: sand 775 + 2% moisture, Water185 -20.5
=164 Liters,Admixture = 0.5% is 100ml
 M30 ( 1 : 2 : 2.87)
 Cement : 380 Kg/ M 3
 20 mm Jelly : 654 Kg/ M 3
 12.5 mm Jelly : 436 Kg/ M 3
 River sand : 760 Kg/ M 3
 Total water : 187 Kg/ M 3
 Admixture : 0.7%
 Fresh concrete density: 2420 Kg/ M 3
 Note: Sand = 760 Kg with 2%
moisture(170.80+15.20)
 M35 ( 1 : 1.79 : 2.57)
 Cement : 410 Kg/ M 3
 20 mm Jelly : 632 Kg/ M 3
 12.5 mm Jelly : 421 Kg/ M 3
 River sand : 735 Kg/ M 3
 Total water : 200 Kg/ M 3
 Admixture : 0.7%
 Fresh concrete density: 2400 Kg/ M 3
 Note: sand = 735 + 2%,
 Water = 200- 14.7 =185.30,
 Admixture = 0.7%
 M40 ( 1 : 1.67 : 2.39)
 Cement : 430 Kg/ M 3
 20 mm Jelly : 618 Kg/ M 3
 12.5 mm Jelly : 412 Kg/ M 3
 River sand : 718 Kg/ M 3
 Water Cement ratio : 0.43
 Admixture : 0.7%
 Note: Sand = 718 + Bulk age 1%
 M45 ( 1 : 1.58 : 2.26)
 Cement : 450 Kg/ M 3
 20 mm Jelly : 626 Kg/ M 3
 12.5 mm Jelly : 417 Kg/ M 3
 River sand : 727 Kg/ M 3 + Bulk age 1%
 Water Cement ratio : 0.43
 Admixture : 0.7%
 M50 ( 1 : 1.44 : 2.23)
 Cement : 450 Kg/ M 3
 20 mm Jelly : 590 Kg/ M 3
 12.5 mm Jelly : 483 Kg/ M 3
 River sand : 689 Kg/ M 3 + Bulk age 12%
 Water Cement ratio : 0.36 (188 Kg)
 Admixture : 1.20%3
 Micro silica : 30 Kg
 Super flow 6.7% of cement
 1 cubic meter contains 500 bricksThe Standard
size of the 1st class brick is 190mmx 90mm
x90mm and motor joint should be 10mm
thickSo brick with motor=200 x 100 x
100.Volume of
 1st class brick = 0.19 x 0.09 X 0.09
=0.001539cu.m
 Volume of 1st class brick with motor =0.2 x 0.1
x0.1=0.002cu.mNo. on bricks per 1cu.m=
1/volume of1st classbrick withmotor=1/0.002=
500 no’s of bricks
 INCH = 25.4 MILLIMETRE
 FOOT = 0.3048 METRE
 YARD = 0.9144 METRE
 MILE = 1.6093 KILOMETER
 ACRE = 0.4047 HECTARE
 POUND = 0.4536 KILOGRAM
 DEGREE FARENHEIT X 5/9 – 32 = DEGREE CELSIUS MILLIMETRE= 0.0394
 INCHMETRE = 3.2808
 FOOTMETRE = 1.0936YARD
 A rope having length 100cm.You can form anyshape using this rope (Example:
Triangle,Rectangle, etc.,). Which shape will covers maximum area
 1 Newton = o.101971 kg
 1 mm2 = 0.01 cm2
 1 cm2 = 100 mm2
 1 mm2 = 20 N100 mm2 = 2000N
 1 cm2 = 2000N2000 N = 203.942 kgSo 20 N/ mm2 = 203.942 kg / cm2
 then volume is 1+1.5+3=5.5 and
 the total volume for using mix=1.57 m3
 then cement required=
 1/5.5*1.57=0.285m3*1440=411 kg. (8+bag)
 sandrequried=1.5/5.5*1.57=0.471m3aggregaterequired
=3/5.5*1.57=0.853m3
 the standard volume of dry mix mortar=1.57.. Ucan
check it in IS code also.
 Then volume is1+1.5+3=5.5 and the total volume for
usingmix=1.57 m3 then cement
required=1/5.5*1.57=0.285m3*1440=411
kg.(8+bag)sandrequried=1.5/5.5*1.57=0.471m3aggrega
terequired=3/5.5*1.57=0.853m3the standard volume of
dry mix mortar=1.57.. Ucan check it in IS code
 BAGS01. PCC 1:5:10 1440/5*0.45 129.60Kg 2.5902.
 PCC 1:4:8(M 7.5) 1440/4*0.45 162.00Kg 3.2403.
 PCC 1:2:4(M 15) 1440/2*0.45 324.00Kg 6.4804.
 PCC 1:3:6(M 10) 1440/3*0.45 216.00Kg 4.3205.
 RCC 1:2:4(M 15) 144/2*0.45 324.00Kg 6.4806.
 RCC 1:1.5:3(M 20) 1440/1.5*0.45 32.00Kg8.6407.
 RCC 1:1:2(M 25) 370.00Kg 7.4008.
 RCC M 30 410.00Kg 8.2009.
 RCC M35 445.00Kg 8.9010.
 RCC M40 480.00Kg 9.6011.
 Damp Proof CourseCM1:3,20mm tk 1440/3*0.022 10.56Kg 0.2112.
2"tk precast slab
 M15 324*0.05 16.20Kg 0.3213. 3"tk precast slab
 M15 324*0.075 24.30Kg0.4914.
 GC Masonry CM 1:7 1440/7*0.34 70.00Kg1.4015.
 Brick Work CM 1:6 1440/6*0.25 60.00Kg 1.2016.
 Brick Work CM 1:4, 115tk 1440/4*0.25*0.11510.35Kg 0.2117.
 Grano Flooring CC 1:1.5:3 1440/1.5*0.45*0.0521.60Kg 0.4318.
 Plastering CM 1:3, 12mm tk 1440/3*0.0146.72Kg 0.1319.
 Wall Plastering CM 1:4,12mm tk 1440/4*0.014 5.00Kg 0.1020.
 Laying Pressed Tiles Overa CM 1:4, 20mm tk 1440/4*0.022 7.92Kg
0.1621.
 Ceramic Tiles, Marble,Granite, Caddapah SlabCM 1:4, 20mm tk
1440/4*0.022 7.92Kg 0.1622.
 Hollow Block MasonryCM 1:6, 200mm tk/m¬2¬ 10.00Kg 0.20
 01. Any Concrete Work(PCC, RCC) 0.45*35.315= 20.00
 02. Damp Proof CourseCM `1:3, 20mm tk 1.00
 03. 2"tk Precast slab M15 1.00
 04. 3"tk Precast slab M15 1.50
 05. SS Masonry in CM 1:7 15.00
 06. Brick Work in CM 1:6 15.00
 07. Brick Work in CM 1:4,115mm tk 2.00
 08. Grano Flooring in CC 1:1.5:3 1.00
 09. Plastering in CM 1:3, 12mm tk 1.00
 10. Wall Plastering CM 1:4, 12mm tk 1.00
 11. Laying Pressed Tiles over a CM 1:4, 20mm tk1.00
 12. Ceramic Tiles, Marble, Granite, Cuddapah slab CM
1:4, 20mm tk 1.00
 01. Any Concrete Work 32.00 cft
 02. Grano Flooring in CC 1:1.5:3, 50mm tk 1.60cft
 03. Grano Flooring in CC 1:1.5:3, 75mm tk 2.40cft
 04. Grano Flooring in CC 1:1.5:3, 100mm tk 3.20cft
 05. Bricks/cum 450.00 Nos
 06. Size Stone/ cum 90.00 Nos
 07. Rough Stone 10.00 cft
 08. Bond Stone/ cum 10.00 Nos
 09. Cement Paint/100 Sft 2.00 Kg
 10. White Cement/100 Sft 2.00 Kg
 11. Janathacem/100 Sft 1.50 Kg
 12. Enamel Paint/100 Sft - 2 Coats 1.25 Litre
 13. Wall Putty/100 Sft 10.00 Kg
 14. Plaster of Paris/100 Sft 25.00 Kg
 15. Distember/100 Sft 2.00 Kg
 16. Cement Primer 0.60 Litre0.40 Litre
 17. Weathering CourseLime 12.50 KgBrick bats 32.00 Kg
 18. Providing Sand Gravel Mix- CumSand 20.00 CftGravel
40.00 Cft
 19.WBM - 75mm tk - 1st Layer - 10 SqmMetel(60-40 mm)
35.00 CftGravel 10.00 Cft
 20. Pressed Tiles - Sqm 20.00 Nos
 21. Hollow Block - 200mm tk 14.00 Nos
 CONVERSION TABLE:
 01. 1 RM 3.28 Rft
 02. 1 Sqm 10.76 Sft
 03. 1 Cum 35.32 Cft
 04. 1 Inch 2.54 cm
 05. 1 sft 0.09Sqm
 06. 1 Acre 0.04 Hectare
 07. 1 Hectare 2.47 Acres
 08. 1 Cft 0.028 Cum
 09. 1 Feet 12.00 Inch
 10. 1 Feet 0.305 M
 11. 1 Cum 1000.00 Litre
 01. Concrete 25 kN/m3
 02. Brick 19 kN/m3
 03. Steel 7850 Kg/m3
 04. Water 1000 Lt/m3
 05. Cement 1440 Kg/m3
 06. 1Gallon 4.81 Litres
 07. Link 8" = 200mm
 08. 1 Hectare 2.471 acr(10000m2)
 09. 1 Acr 4046.82m2 = 100 cent
 01. Compression 38d
 02. Tension 47 & 60d
 03. 1 Cent 435.60 Sft
 04. 1 Meter 3.2808 ft
 05. 1 M2 10.76 ft2
 06. 1 Feet 0.3048m
 07. 1 KN 100Kg
 08. 1kN 1000N
 09. 1 Ton 1000Kg = 10,000 N = 10 kN
 10. 1 kG 9.81N
 M5=2.54Bg/m3,
 M7.5=3.18Bg/m3,
 M10=4.32Bg/m3,
 M20=8.64Bg/m3,
 M25=12.9 Bg/m3,
 M40=500+100Kg/m3
 Water absorption 12 to 15%
 Compressive strength = 36Kn/cm2
 230mm Wall/m3 = 460 Bricks + 20Cft Sand
+66Kg CementSSM 1:7/m3 = Slize 95 + Soiling
8 Cft +60.5 KgCurrent = 1000 Watts = 1 Unit,
Er.Pawan Dhagate
M/s Ajinkya Constructions
M- 9822 932 788