Arabian Bemco Contracting Co.

KSA
Power Plant Project-10
RISK ASSESSMENT

Assessment No: Assessed By: Activity: Flushing/Chemical Treatment

Risk Risk
Hazard Persons at Risk Rating Proposed Control Measures Rating
S L R S L R
Power Tools • Lead Man 5 5 25 • Flushing Crew Shall Be Trained & Competent. 5 1 5
• Rotating Parts • Flushing Crew • Work Crews Will Use Appropriate PPE.( Safety Goggles,
• Electrocution From Damage Cables • Supervisor Face Shields, Dust Mask )
• Inhalation (Dust) • General Helpers • STARRT Talks For All Crews by Supervisor/Foreman.
• Dust/Objects In Eye • Power Tools Training As Tool Box Talks Topic.
• Power Tools And Cables Shall Be Inspected Daily And
Color Coded Prior To Start Of Work.
• Damage or Defective Power Tools Shall Be Tagged Out Of
Service And Immediately Returned To The Tool Room for
Repair.
• Grounding/Earthling Will Be Provided On All Mobile
Generators.

Noise (Equipment) • Lead Man 5 4 20 • Work Crews Will Use Appropriate PPE (Ear Muff, Ear 4 1 4
• Ear Damage • Flushing Crew Plug).
• General Helpers • STARRT Talks For Crews Working In Noisy Environment.
• Supervisor • Noise (Ear Protection) As Training In Tool Box Talks Topic.
• Inspector • Ensure Appropriate Barricades (Tape) & Sign Boards “Ear
Protectors Must Be Worn In This Area” Placed Around In
The Equipment.
• All Silencers Must Be Inspected For Maintenance To Ensure
The Proper Condition Of Equipment Prior To Start Of Work.
• All Equipment On Site Must Utilize Silencer.

of 1 Page 6
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT

Assessment No: Assessed By: Activity: Flushing/Chemical Treatment

Risk Risk
Rating Rating
Manual Handling • Supervisor 5 5 25 • STARRT Talks For Crews. 5 1 5
• Lead Man • Manual Handling As Tool Box Talks Topic.
• Flushing Crew • Work Crews Will Use Appropriate PPE. ( Safety Goggles,
• General Helpers Welder Gloves, Argon Gloves)
Hazard Persons at Risk Proposed
• Plan The Route Control
Before You Lift. Measures
• Keep Work Area & Walkways Clear.
• Allow Rest Periods.
• Workers Are Trained To Move Feet Instead Of Twisting
Body.

Hazardous Substances • Supervisor 5 5 25 • STARRT Talks For Crews Working In Hazardous 5 1 5


• Skin Burning • Lead Man Substances.
• Eye Irritations • Flushing Crew • Hazardous Communication Program Shall Be Implemented.
• Health Impairment-Inhalation • General Helpers • Material Safety Data Sheet (MSDS) Shall Be Posted On Site.
• Fire • Inspector • Workers Shall Be Instructed On The Proper Use Of
Materials In Accordance With MSDS Requirements.
• MSDS Requirements for Transport, Storage, Use and
Disposal Shall be Implemented.
• Work Crews Will Use Appropriate PPE. ( Hand Gloves,
Safety Goggles, Face Masks, Cover All and Respirators)
• Control of Substances Hazardous To Health Training As
Tool Box Talks Topic.
• Appropriate Training Prior To Start Of Work.
• First Aid Kit Will Be Available.
• STARRT Talks for Crews Working In Hazardous Substances.
• Control of Substances Hazardous To Health Training As Tool
Box Talks Topic.
• Appropriate Training Prior To Start of Work.

of 2 Page 6
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT

Assessment No: Assessed By: Activity: Flushing/Chemical Treatment

Risk Risk
Rating Rating
Hazard Persons at Risk • Work Crews Proposed ControlPPE.
Will Use Appropriate Measures
• Sufficient Water Available For Eye And Skin Wash.
Compressed Air • Supervisor 5 4 20 • Pressure Testing Crew Shall Be Trained And Competent. 4 1 4
• Air Impact • Lead Man • Work Crews Will Use Appropriate PPE
• Eyes • Flushing Crew • STARRT Talks For All Crews.
• Skin • Inspector • Compressed Air Training As Tool Box Talks Topic.
• Hose Whip Check • General Helpers • Provide Adequate Fire Protection (Provision Of Sand, Fire
Blanket, and Fire Watchman & Fire Extinguisher).
• Air Hose Must Be Keeping Free Of Grease And Oil.
• Hose Ends Must Be Secured To Prevent Whipping.
• Compressed Air Shall Be Identified the Maximum Working
Pressure.
• Proper Training Prior To Start Of Work.
• Compressed Air System Shall Be Inspected Regularly.
• Proper Communication During Operation
• First Aid Kit Will Be Available.

Working At Heights • Supervisor 5 5 25 • Working At Heights Training As Tool Box Talks Topic. 5 1 5
• Fall Person • Lead Man • STARRT Talks for Crews Working At Heights.
• Fall Material • Flushing Crew • Scaffold Erection by Competent Person.
• General Helpers • Scaftag Inspection Approval before Use.
• Inspector • Safety Full Body Harness Required (Fall Protection).

Foreign Body on Eye • All 5 4 20 • STARRT Talks For All Crews. 4 1 4


• Work Crews Will Use Appropriate PPE.( Welding Masks,
Safety Goggles )
• Eye Protection Training as Tool Box Talks Topic.

of 3 Page 6
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT

Assessment No: Assessed By: Activity: Flushing/Chemical Treatment

Risk Risk
Rating Rating
Electrical Works • Supervisor 5 5 25 • Electricians Shall Be Trained & Competent. 5 1 5
• Fire & Explosion • General Helpers • Helper Shall Be Trained & Competent.
• Electrocution • Flushing Crew • Work Crews Will Use Appropriate PPE.
• Lead Man • Safe Insulated Tools Will Be Used In Order To Carry Out
Hazard Persons at Risk Proposed Control Measures
Electrical Work.
• STARRT Talks For All Crews Involve In Site Electricity.
• Site Electricity Training as Tool Box Talks Topic.
• Lock Out/Tag out System.
• First Aid Kit Will Be Available.

Electrical Equipment • Supervisor 5 5 25 • Work Crews Will Use Appropriate PPE. 5 1 5


• Fire & Explosion • Lead Man • Grounding/Earthling Will Be Provided On All Mobile
• Electrocution • Flushing Crew Electrical Generators.
• General Helpers • Ground Fault Circuit Interrupter (GFCIs) / Earth Leakage
Circuit Interrupter (ELCBs) Will Be Provided For All Areas
Having A Wet Atmosphere Where Electrical Equipment or
Portable Electrical Tools May Be Used.
• Equipment Shall Be Maintained In A Good Condition And
Color Coded.
• STARRT Talks for All Crews.
• Site Electricity Training As Tool Box Talks Topic.
• Lock Out/Tag out System.
• Power Tools & Cables Inspected And Color Coded.

Slips, Trips And Fall • Supervisor 5 5 25 • STARRT Talks for Crews. 5 1 5


• Lead Man • Work Crews Will Use Appropriate PPE.
• Flushing Crew • Check The Route Prior To Start Of Work.
• Inspector • First Aid Kit Will Be Available.
• Helpers • Housekeeping Training As Tools Box Talks Topic.
of 4 Page 6
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT

Assessment No: Assessed By: Activity: Flushing/Chemical Treatment

Risk Risk
Rating Rating
Hazard Persons at Risk Proposed Control Measures
• Always Check The Area Free From Unnecessary Materials.
• Work Place Shall Be Maintained In A Good Condition That
Is Clean And Tidy.

General Welfare • All 5 4 20 • Work Crews Will Use Appropriate PPE. 4 1 4


• Dust Masks Required In Windy/Dusty Condition.
• Provide Sufficient Cool Drinking Water Near Workers.
• Provide Sufficient Toilets In Close Vicinity Of Workers.
• Provide Shaded Rest Areas In Close Vicinity Of Workers.
• Provide Sufficient Lights Near Workers At Night.
• Employees Shall Be Trained on Heat Stress Prevention,
Recognition And Treatment.

Fluid Spills From Vehicles Equipment • Environment 5 4 20 • Daily Inspection of Equipment for Leaks. 4 1 4
• Ground Contamination • Routine Preventive Maintenance Program.
• Water Contamination • Maintenance Performed By Competent Persons.
• Drip Pans Sheets Used during Service and all joint point of
hoses.
• Spills Kit (Sand) Available In Service Area.
• Impervious Material under Fuel Tanks (Bounded) Fuelling
Area, Service Area.
• Impervious Material under Waste Oil Storage Area.
• Proper drainage system.
• Barricade the area and sign board posted (Danger Flushing in
progress) all around the area.

of 5 Page 6
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT

Assessment No: Assessed By: Activity: Flushing/Chemical Treatment

Risk Risk
Rating Rating
Hazard Persons at Risk Proposed Control Measures
Originator Signature: Sajid Ali Date: 18-09-2015

of 6 Page 6
Arabian Bemco Contracting Co. KSA
Power Plant Project-10
RISK ASSESSMENT

Assessment No: Assessed By: Activity: Flushing/Chemical Treatment

Risk Risk
Rating Rating
Hazard Persons at Risk Proposed Control Measures
Originator Signature: Sajid Ali Date: 18-09-2015

of 6 Page 6