Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

1 2 3 4 5 6 7 8

F
HILL SIDE

HILL SIDE
E

E
VALLEY SIDE
D

VALLEY SIDE
C

C
B

B
TYPICAL CROSS SECTION OF REINFORCED EARTH COMPOSITE SYSTEM FOR
A

A
SINKING ZONE AT KM 3+800 BETWEEN RAVANGLA AND PHAMTUM

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

F
HILL SIDE
E

E
HILL SIDE

HILL SIDE
D

VALLEY SIDE
C

C
B

B
VALLEY SIDE
A

A
TYPICAL CROSS SECTION OF REINFORCED EARTH SLOPE STRUCTURE, SLOPE RETENTION SYSTEM & ROCK FALL
BARRIER SYSTEM FOR SLIDING ZONE AT 45KM AWAY FROM RAVANGLA BETWEEN TASHIDING AND YUKSOM
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

F
HILL SIDE
E

E
D

VALLEY SIDE
C

C
B

B
TYPICAL CROSS SECTION OF REINFORCED EARTH COMPOSITE SYSTEM FOR
SINKING ZONE AT 6 KM FROM DANTUM ON DANTUM UTTAREY ROAD
A

A
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
vertical sag of net max. 3%
eight transmission ropes post post post post post of post spacing
section 1 section 2 section n-1 section n
two top support ropes
concrete
and one bypass rope
foundation
lateral anchor rope

vertical rope
E

E
two bottom support ropes intermediate suspension spiral rope anchor
and one bypass rope (application see manual) in direction of rope
spiral rope anchor
in direction of rope

transmission rope retaining ropes


layout of anchor points D
lateral anchor rope
(details in

1.5m
top support rope,

fence height
ca.1.7 x ___
product manual RXE-5000)
bypass rope and vertical rope
1.5m 1.5m
H4 H3 H2 H1
fence height
ca. 0.3 x
D

D
bottom support rope,
bypass rope and
1.5m vertical rope B,E,F A,E,F C
9m post spacing post spacing post spacing post spacing
8-12m 8-12m 8-12m 8-12m

anchoring concrete foundation anchoring in loose soil: with tension and compression anchor
for all types of soil anchoring in bedrock: with rock anchors
spiral rope anchor
spiral rope anchor
C

C
two anchor bolts base plate with hinge
base plate with hinge

ƒ
concrete foundation head foundation area line 
Q
PL

tension anchor
stabilization tube
compression anchor
NOTE:
Rockfall, landslides, debris flows or avalanches are sporadic and unpredictable. Causes
can be e.g. human (construction, etc.) or
B

B
environmental (weather, earthquakes, etc.). Due to the multiplicity of factors
affecting such events it is not and cannot be an exact science that guarantees the safety
of individuals and property.
However, by the application of sound engineering principles to a predictable range
of parameters and by the implementation of correctly designed protection
measures in identified risk areas the risks of injury and loss of property can be reduced
substantially.
Inspection and maintenance of such systems are an absolute requirement to
ensure the desired protection level. The system safety can also be impaired by events
such as natural disasters, inadequate dimensioning parameters or failure to use the
A

A
prescribed standard components, systems and original parts; and/or corrosion (caused by
pollution of the environment or other man-made factors as
well as other external influences).

1 2 3 4 5 6 7 8
Front view Cross section
Intermediate wire rope anchors every ~ 25 m Intermediate wire rope anchors every ~ 25 m

If possible hanging
3.9 m
the mesh directly on
the wire rope anchors wire rope anchor min. Ø14.5 mm Generally going 1 - 3 m
over the edge of the rock face

shackle 3/4"

A
B

Top support rope min. Ø18 mm


Lateral boundary rope
min. Ø14 mm
wire rope anchor min. Ø14.5 mm
(optional)

Connection clip T3

~1.0 m
TECCO G65/3 mm
High tensile steel
3 wire rope clips NG 9/16" wire mesh Bottom support rope min. Ø14 mm
(optional) 3.9 m 3.9 m
Roll width Roll width

Detail A wire rope Ø18 mm Detail B

wire rope anchor min. Ø14.5 mm


4 wire rope clips NG 3/4"

Top support rope min. Ø18 mm


Loose seaming in the anchor area 4 wire rope clips NG 3/4"
shackle 3/4" If possible installation
Top support rope min. Ø18 mm of the wire rope anchors in dells

clip the mesh


together with a
T3 clip at
Seam wire rope ø6 mm
every diamond
or seam wire
rope Ø6 mm

Flip mesh around bottom


rope and clip together
with connection clip T3
(1 clip every 3rd diamond)

rockfall drape
Bottom support rope min. Ø14 mm 65/3 mm
(optional) System drawing
1 2 3 4 5 6 7 8

SOIL REINFORCEMENT Details of Ground Anchor PRE-QUALIFICATION REQUIREMENT OF THE SYSTEM | TECHNOLOGY PROVIDER TECHNICAL SPECIFICATION.

A.) Grade & Properties of Tendon Materials


HTS wire in a cco rd a n ce wit h : EN- 1 0 1 3 8 - 3 / AS TM- A4 1 6 - 0 6 SINCE THE CONSTRUCTION OF REINFORCED EARTH SLOPE STRUCTURE, REINFORCED EARTH COMPOSITE SYSTEM,
F

F
SOIL NAILING WORKS AND ROCK FALL PROTECTION SYSTEM BY DRAPERY & ROCK FALL BARRIER SYSTEM ARE

Nominal Cross Yied load Ultimate Elongation Ult im a t e Bre a kin g Lo a d - 2 7 9 KN SPECIALIZED IN NATURE , THE WORK SHALL BE CARRIED OUT THROUGH A SPECIALIZED SYSTEM/TECHNOLGY
diameter Grade load S p e cifie d 0 . 1 % Pro o f Lo a d - 2 4 6 KN
section (kN)
PROVIDER. THE BIDDER MUST ENTER INTO MEMORANDUM OF UNDERSTANDING (MOU) WITH SUCH TECHNOLOGY
(mm2) (kN) (%) Ma xim u m Re la xa t io n - 2 . 5 %
St PROVIDER PRIOR TO BID SUBMISSION DATE AND SUBMIT THE MOU ALONG WITH THEIR BID .ELSE THE BID SHALL NOT BE
670/800 Bra n d s : TATA, US HA MARTIN CONSIDERED AS VALID. THE MOU SHALL BE EXCLUSIVE & BINDING FOR THE BIDDER AND SHALL NOT BE EXCLUSIVE FOR
22 375 251 300 7
(grade B.) Details of Triple Layer of Corrosion Protection
97) La ye r- 0 1 : Ep o xy Pa in t fo r t h e e n t ire le n g t h o f Te n d o n ANY ELIGIBLE TECHNOLOGY PROVIDER AND THEY CAN ENTER INTO MOU MORE THAN 1 BIDDER. THE TECHNOLOGY
St La ye r- 0 2 : Gre a s e fo r Fre e Le n g t h , Ce m e n t Gro u t wit h PROVIDER SHALL BE ONE SINGLE AGENCY FOR DESIGN, PREPARATION OF DRAWINGS, SUPPLY OF SPECIALIZED
670/800 Qu a rt zit e S a n d fo r Fixe d Le n g t h
25 491 329 393 7
(grade La ye r- 0 3 : HDPE In d ivid u a l S le e ve & Ou t e r Co rru g a t e d MATERIALS LIKE SOIL REINFORCEMENTS, FASCIA, ACCESSORIES, SOIL NAIL AND/OR GROUND ANCHORS, NON-WOVEN
97)
HA POLYMERIC STRIP REINFORCEMENT SPECIFICATION HDPE Du ct In Fre e Le n g t h Ce m e n t Gro u t wit h GEOTEXTILES, ROCK FALL BARRIER AND DRAPERY SYSTEM AND FOR ONSITE TECHNICAL GUIDANCE.
St
Properties Test Method Unit Minimum average roll value Co rru g a t e d HDPE Du ct In Fixe d Le n g t h
670/800
28 616 413 493 7 Ultimate C.) Grout, Cement, Additive details
(grade
E

E
Tensile Strength ASTM D6637 kN 20 25 37.5 50 65
97) Gro u t p ro p e rt ie s in a cco rd a n ce wit h BS EN- 4 4 5 - 1 9 9 7 , SUCH SPECIALIZED SYSTEM PROVIDER MUST MEET THE FOLLOWING ELIGIBILITY CRITERIA :-
St Width mm 49 49 49 49 49 BS EN- 4 4 5 - 1 9 9 7 & BS EN- 4 4 7 - 1 9 9 7
670/800 Long Term Design
Gra d e o f Ce m e n t - OPC- 4 3 Gra d e
30 707 474 566 7 kN 11.76 14.70 22.05 29.40 38.23 1. THE SYSTEM PROVIDER | AGENCY SHOULD BE A FIRM ESTABLISHED UNDER INDIAN COMPANY'S ACT AND
(grade Strength Ad d it ive - Ma s t e r Flo w- 1 5 0 ( BAS F) , CEBEX- 1 0 0 ( FOS ROC)
97) a n d In t rp la s t - NN( S IKA) MUST BE EXISTING IN INDIA FOR MINIMUM TWENTY (20) YEARS. THE CERTIFICATE OF INCORPORATION SHALL
Wa t e r ce m e n t ra t io : 0 . 3 6 TO 0 . 4 0
Do s a g e o f a d d it ive : 0 . 4 % TO 0 . 5 % ( o r a s p e r BE SUBMITTED AS A DOCUMENTARY PROOF TO THIS EFFECT ALONG WITH THE BID.
m a n u fa ct u re r re co m m e n d a t io n )

Flu id it y : 1 1 t o 2 0 S e co n d s ( Flo w Co n e Ap p a ra t u s ) 2. THE SYSTEM PROVIDER/AGENCY MUST HAVE COMPLETED :-


Ble e d in g : 2 % t o 4 % a ft e r 3 h o u rs a n d 0 % a ft e r 2 4 h o u rs
Vo lu m e Ch a n g e : ( - ) 1 % t o ( + ) 5 %
Co m p re s s ive S t re n g t h : 2 0 MPA a ft e r 3 d a ys , 3 0 MPA 2.1. AT LEAST FIVE LAKH (5,00,000) SQ.M. OF REINFORCED EARTH WALL IN INDIA . COMPLETION CERTIFICATE
Aft e r 7 d a ys a n d 3 5 MPA a ft e r 2 8 d a ys
SHALL BE SUBMITTED ALONG WITH THE BID AS A DOCUMENTARY PROOF.

01
D

(30Nos.) 2.2. AT LEAST THREE (3) PROJECT INVOLVING SOIL NAIL IN INDIA INVOLVING DESIGN, SUPPLY AND/OR
INSTALLATION OF WORKS.

2.3. AT LEAST ONE (1) PROJECT INVOLVING REINFORCED EARTH COMPOSITE STRUCTURE IN INDIA
INVOLVING DESIGN, SUPPLY AND/OR INSTALLATION OF WORKS.

2.4. AT LEAST ONE (1) PROJECT WITH GROUND ANCHOR SYSTEM INVOLVING DESIGN, SUPPLY AND / OR
INSTALLATION WORKS. CASE STUDY OR CONTRACT AGREEMENT OR WORK ORDER MUST BE SUBMITTED.

02 02
3. THE ANNUAL AVERAGE TURNOVER OF THE SYSTEM PROVIDER/AGENCY MUST BE MINIMUM INR FORTY (40)
CRORES IN THE LAST FIVE (5) FINANCIAL YEARS. AUDITORS CERTIFICATE SHALL BE SUBMITTED AS A
C

C
DOCUMENTARY EVIDENCE.

4. THE TECHNOLOGY PROVIDER/AGENCY MUST BE AN ISO-9001 CERTIFIED COMPANY FOR THE LAST 10
YEARS. FULLY AUTHENTICATED REGISTRATION CERTIFICATE SHALL BE SUBMITTED TO SUBSTANTIATE
THIS CLAUSE.

5. THE SYSTEM PROVIDER MUST SUPPLY THE HIGH TENSILE WIRE MESH AND ROCK FALL BARRIER APPROVED
BY EUROPEAN TECHNICAL COMMITTEE (ETSE).

6. THE SYSTEM PROVIDER OR ANY OF ITS SISTER COMPANY MUST POSSESS BBA CERTIFICATION OF THE
REINFORCED EARTH SYSTEM AND THE SOIL REINFORCING POLYMERIC STRAP MUST BE ISO-9001 AND
B

B
CE CERTIFIED.

X X GENERAL NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METER UNLESS OTHERWISE STATED.
2. DETAILED DESIGN SHALL BE DONE BY CONDUCTING DETAILED SOIL INVESTIGATION AS REQUIRED
FOR DESIGN.
A

A
TOP PLAN AT SEMI PERFORATED PIPE SECTION X-X

1 2 3 4 5 6 7 8