Professional Documents
Culture Documents
S2-Ground Improvement Techniques (516) .Text - Marked
S2-Ground Improvement Techniques (516) .Text - Marked
(GEOTECHNICAL ENGINEERING)
1. What are the site conditions when ground improvement is required for foundations? (9)
2. Describe various methods of ground improvement suitable for cohesive soil? (9)
www.ktubuddy.in
3. A clay layer 5m thick is consolidated with the help of drain well of diameter 30 cm
and spaced at 2.7m centre to centre. Determine the influence of the wells on the
the clay without wells would be equal to 20%. Make computations under two cases
5. Write short notes on (i) Rock bolt (ii) Soil guniting (iii) Micro piles. (9)
www.ktubuddy.in