Organizational BIM Assessment Profile

Current Target Total


BIM Planning Element
Level Level Possible
Strategy 0 Err:509 Err:509
BIM Uses Err:509 Err:509 Err:509
Process Err:509 Err:509 Err:509
Information Err:509 Err:509 Err:509
Infrastructure Err:509 Err:509 Err:509
Personnel Err:509 Err:509 Err:509
Totals Err:509 Err:509 Err:509

BIM Assessment Profile


#REF! #REF!
1
1

0.8

0.6

0.4

0.2

0
Category Description Level of Maturity
0 1 2

BIM Project Team has completed


Experience the team has Team has no Team has assisted in
Execution discrete BIM Uses but
with planning for BIM on experience with BIM BIM Planning with
Planning has not composed a
projects planning on a project other teams
Experience BIM plan

Team has collaborated


Team has not
Willingness of the team to on previous projects, Team has experience
collaborated with other
Collaboration collaborate with others but is not willing to and is willing to share
teams and does not
Experience and their experience share information with other
encourage
collaborating model/information team members
collaboration
fluidly

Competence of the
Team has not Team has not
project team in Team has implimented
BIM Tools implimented BIM and implimented BIM, but
implimenting various BIM BIM to a limited extent
is not willing to do so is willing to
tools

Team does not Team does not


Team does not
Ablities of the impliment BIM but impliment BIM but
Technical impliment BIM or any
organization to preform utilizes limited extensively uses
Capabilities other electronic
BIM electronic electronic
technology
communication tools communication tools

TOTAL
l of Maturity Score Possible
3 4 5

Team has integrated Team has developed a


Team has led BIM BIM planning into standard BIM
1 5
planning on projects standard operating Execution Plan to use
procedures on projects

Team leads
collaboration efforts
Team is willing to co- Team encourages co-
and encourages 2 5
locate for a project location on all projects
information sharing
among parties

Team has implimented


Team encourages all
BIM on many projects Team impliments BIM
parties to impliment 2 5
if required by the tools on all projects
BIM tools on all project
owner

Team Uses BiM to a Team impliments Team is innovative in


limited extent and cutting edge developing new
1 5
electronic technologies on technologies and BIM
communication tools projects uses

6 20