Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Year of birth 1966

Current Location/Address
City or Town Naga, Cebu
Country PHILIPPINES

Permanent/Home Location/Address
Country PHILIPPINES

Languages
Primary Language Fluency
English Read, write and speak fluently

Nationalities
Main Nationality PHILIPPINES

Experience Classification
Job Function Years Experience
Planning / Scheduling 17
Engineer
Industry Years Experience
Oil and Gas 14
Petrochemical - 3
Refinery

Qualifications
Highest Qualifications Degree

Qualification Subject Establishment/Country Year


Degree BS in Mechanical University of the Visayas-Cebu, 1988
Engineering Phils

Computer Skills and Software Used


Excellent Computer Skills - Software used: MS Project, Excel, Word, Power Point, Primavera (P3, P3e, P6).

Work Locations
Are you willing to move or relocate?
Yes - I will travel domestically
Yes - I will relocate domestically
Yes - I will travel internationally
Yes - I will relocate internationally

Availability
Start Immediately? Available Now
Earliest Start Date Given 4 weeks notice

Ideal Next Job


Open to all offers except in Saudi Arabia.

Required Salary & Conditions


Minimum salary of USD 5,000 per month plus paid housing, transportation and food allowance.

Employment History
Total Years of Work 21
Experience:
Commenced Full 1989
Time Work:
Name CABGOC / Chevron Corp.
Job Title: Planning Engineer
Duration From : 2006 To: 2009

Summary
A total of 20 years experienced in Construction Industry and Oil & Gas Operations (including 5 years in
Engineering/Procurement/Construction), a combination of 17 years in Middle East, European countries and Africa in Gas/Oil
Refinery and Petrochemical Plant. Directly involved in Project Planning and Controls using the latest version of Primavera
Project Planner (P3/P3e/P6), MS Office and 3 years in the Philippines for Mechanical works.

Work Experience
Cabinda Gulf Oil Co./Chevron Corp. Production Operations IPP Asset Planner
Malongo Base, Angola - Africa
December 2006 – December 2009 Assigned in Area B and Sanha Complex (Offshore)
•Activities specifically included within the scope are: To integrate the planning of functional groups, resources and assets
across the Business Unit to achieve. 
Ensure all activities in Operations, Maintenance, Well Intervention, Corrosion Team, Rig moves and Projects are captured in
Integrated Planning Process schedule. Close coordination with Operations, Maintenance Group, Facilities Engineers and
Contractors. Responsible for scheduling of Turnaround and shutdowns activities, Well construction and Intervention drilling
works. Capital upgrade and replacement activities on existing facilities. Identify critical activities that include production
losses, shutdown/shut-ins and high profile work. Participate safety, staff meetings and other meetings for the facilities.
Conduct planning meetings regularly with participation of Operations, Maintenance group and Contractors. Provide training
in Project Controls (Planning) related works for our Assistant Planners (Angolan National Employee).

Petrofac International Ltd. Project Controls Engineer (Planning)


Sharjah, UAE
January 2006 – December 2006 Project: Facility Upgrade & Relocation of U/G Process Piping for GCs 3, 4, 6, 7, 8, 21, 23,
BS 140 & BS 150
Client: Amec / Kuwait Oil Company (KSC)
Value: $680 Million US Dollar Project
• Assigned in Kuwait Central Office.
Responsible for Construction reports for internal and to client. Coordination /interfaces with site planning engineers.
Preparation of misc. reports such as Daily, Weekly and Monthly Progress Reports for both internal and for the client. Other
report required as per contractual requirements. Check/review Sub Contractor’s planning documents. Such as weekly,
monthly reports, quantity/commodity reports, P3 schedule updates and resources loading. Project monitoring and controls.

Petrofac International Ltd. Project Controls Engineer (Planning/Cost)


Sharjah, UAE
April 2005 – January 2006 Project: Replacement of North Kuwait Crude Oil Export System
Client: Fluor / Kuwait Oil Company (KSC)
• Assigned in UAE - Sharjah Main Office.
Preparation of misc. reports as per contractual requirements. Project monitoring and controls. Responsible for preparation of
Weekly Progress Measurement System (PMS) update / S-Curves – EPC (Construction from site inputs), Weekly & Monthly
Internal and Client Reports. Prepare Monthly Progress Invoice to Client and check Sub-Contractors progress Invoice.
Prepare Monthly Progress Presentation to Client. Prepare miscellaneous schedules. Assist in preparation/costing for CVR
(Contract Variation Request). Attend Monthly Meeting with Client. 

Petrofac International Ltd. Project Controls Engineer (Planning)


Sharjah, UAE
August 2004 – March 2005 Project: BTC Pipeline and Facility Project
Client: British Petroleum (BP)
• Assigned in Baku-Azerbaijan, IPA1 site.
Project monitoring/controls and close coordination with sub contractor. Prepare miscellaneous reports as per contractual
requirements. Update P3 Schedule weekly and submitted to Baku Office. Responsible for the preparation of Commissioning
Schedule and Progress Measurement System (PMS).

Petrofac International Ltd. Project Controls Engineer (Planning)


Sharjah, UAE
November 2001 – July 2004 Project: Dorood Project Onshore Facilities & New Plant
Client: TOTAL / Elf Petroleum, Iran
Value: $250 Million US Dollar Project
• Assigned in Sharjah Head Office and Iran site.
Responsible for the preparation of detailed Construction Schedule (P3), Progress Measurement System (PMS) and
Commodity & Resources loading in the Construction. Prepare of miscellaneous reports for Engineering and Procurement
stage of the project at Head Office. Perform all other works assigned by the Head of Department. Project monitoring/controls
and close co-ordination with Client and Sub-Contractor at job site. Preparation of miscellaneous reports for client as per
contractual requirements. Prepare internal reports, weekly and monthly for management review. Participate partly in
Commissioning schedule and progress update.

M. Al-Mojil Group (MMG) Project Controls Engineer (Planning/Cost)


Dammam, Saudi Arabia
October 1994 - October 2001
• Assigned in PCD Head Office and various Projects of MMG Kingdom wide.

PCD Head Office - Directly responsible to the compilation and summary of Project Management Control Reports from the
projects. Participate for Pre-construction scheduling works (Primavera, P3) on the stage bidding projects. Receiving Controls
Records/Maintenance of all Departmental Records and Equipment. Perform all other work assigned by the Project Controls
Manager.

Project Assignment – Assigned as a Sr. Planning & Scheduling in all scope of works in the contract (multi discipline). Duties
includes Coordination, Planning & Scheduling of works (Primavera, P3) to ensure profitable and timely compliance of Project
activity requirements. Responsible for project controls work in accordance with Clients requirements and standard MMG
project controls procedures. Prepare Construction Schedule with resource loading. Coordinate closely with Field Operations,
monitor progress and cost commitments/trends and analyse against the budget cost & man-hours, material deliveries. The
Management carefully evaluated the results of these reviews for subsequent action. Attend weekly progress meeting and
any other Client meetings as required in the project. Responsible for proper implementation of standard cost engineering
procedures and practices which includes, but not limited to: cost data gathering; monitoring and consolidation; cost data
analysis against the budget; forecasting of cost at project completion; cost monitoring of all material commitments and
subcontracts; man hours monitoring and quantity tracking for progress and productivity measurement; change orders
control; review of cost charging and reporting of incurred project revenues based on construction progress to MMG
management.

Projects Assignment (Kingdom of Saudi Arabia):


Kemya Interconnecting Lines & Mech’l. Works - Jubail
Qassim Product Supply System – Riyadh/Qassim
Yanbu Cement Expansion - Yanbu, Al-Sinaiyah
Arabian Industrial Fibers Co. - Yanbu, Al-Sinaiyah

M. Al-Mojil Group (MMG) Field Engineer


Dammam, Saudi Arabia Projects: Project: Hawtah Oil Field and Marjan GOSP 2 – Offshore (Riyadh and Tanajib, K.S.A.)
June 1992 - August 1994 Clients: Lummus Alireza Crest/Flour Daniel
Responsible for requisition/received of field Construction materials for Mechanical/Piping and Civil/Structural works. Conduct
actual inventory and follow-up outstanding balance of materials to the client. Field and client coordination, assist field in the
execution of construction works (including refurbishment) and assist client inspector in the inspection if necessary.
Documentation works.

LOCAL ASSIGNMENT – PHILIPPINES


Omnitech Builders/Alltech Contractor Inc./Apo Cement Corp. - Millwright/Expediter
Cebu and Manila Philippines
(1989 – 1992) Projects: National Power Corp.(NPC)/Hi Cement Expansion Project /Apo Cement Corporation (Clients: Asia
Brown Bovery (ABB)/Hi Cement/Apo Cement Corporation). 
Rehabilitation of one (1) unit Gas Turbine in Thermal II, under the supervision of Asia Brown Bovery. Assigned in Preventive
Maintenance, requisition/received of all incoming mechanical materials for the plant. Conduct actual inventory and follow-up
outstanding balance of materials to the Purchasing Dept. Responsible for all reports related to Preventive Maintenance for
PM Superintendent action. Installation of new mechanical equipment and piping in the Cement Plant. Assist regular
mechanical maintenance in the refurbishment of mechanical equipment during plant shutdown works.

You might also like