SONATRACH
CUM HOURS 13,96 26,000 BIT 1 0,63 Pf (cc) 0,20 NaCL Brine (mg/L)
FUEL & WATER MUD LOSSES MOTOR&TURBINE (day/cum) SHOCK SUB 14,0 12,00 35,00 1,18 1,65 SENONIAN
FUEL: SURF: 41,0 m³ MOTOR: / JAR
WATER: 210,00 m³ HOLE: TURBINE: / BHA
AV DP: DP/CSG: STRING: 0,0 ANNULUS: 12,0 TQ.on BTM: TQ.off BTM:
AV DC: Jets Vel ( m/s): PITS: 397,0 TOTAL 409,0 BELOW JAR: ABV. JAR:
CARBONATE DE SOUDE 0,025 1,250 0,400 0,850 SOUDE CAUSTIQUE 0,025 1,200 0,550 0,650
CMC LVT 0,025 1,000 1,000 AVADETER 0,165 1,320 0,330 0,990
SURVEY DATA
MD INC AZI TVD N/S (-) E/W (-) VS DLS MD INC AZI TVD N/S (-) E/W (-) VS DLS
(m) (°) (°) (m) (m) (m) (m) (°/30m) (m) (°) (°) (m) (m) (m) (m) (°/30m)
PERSONNEL DATA
COMPANY NO HOURS NAMES COMPANY NO HOURS NAMES
SH-DDO 2 0,00 S,BENSEMCHA+S,DOUADI SARL BECHIRI / WATER TRUCK 1 0,00 F,BENGASMI
DML MUD LOGGING 3 0,00 A,BELABBAS AVA MUD 2 0,00 M,AMROUNE
SLB/COPS 3 0,00 H,KARA SH/ MEC 1 0,00 A.SAOUD
ENTP 40 0,00 L.BENACHI SARL LAOUINIE / WATER TRUCK 13 0,00 A,YOUSFI
SH RIG ASSISTANT 1 0,00 K,MESSAOUD AVA WAST MANAGEMENT 2 0,00 H,SALEM
LIGABUE CATRING 18 0,00 N,ABBASSEN HIMAYA PLUS 31 0,00 S,MIKAOUSSI
SH MECANIQUE TRAINEE 1 0,00 A,KIRECHE
OPERATIONS SUMMARY
FROM-TO HRS PHASE CODE SUB DESCRIPTION FROM-TO NPT NPT DETAIL NPT Co Op Co BILL
00:00-21:00 21,00 26" 02 P E START DRILLING 26" HOLE SECTION 12,0-34,0 ENTP T1
* M/U BIT 26 "+ BIT SUB + SHOCK SUB +02 DC 11"
* Pre-spud meeting with all crews
* Start Drilling with reduced parameters (no mud losses)
* WOB= 2-5T RPM 40-70 rpm Q= 500-1300 lpm Pr= 40 psi
* ROP Daily/Cummul : WOC= 1,38 // 1,38 m/hr WC= 1,17 // 1,17m/hr
21:00-23:30 2,50 26" 06 N I POOH 26"BHA HOLE SECTION 34,0-0,0 DPRB STAB SH/FOR ENTP T1
**Communication on surface
**L/D BIT 26 "+ BIT SUB + SHOCK SUB +02 DC 11"
23:30-00:00 0,50 26" 12 N J RIG UP ENTP & COPS SURFACE EQUIPMENT 0,0-0,0 DPRB STAB SH/FOR ENTP T1
Distance between water well and rig location (km): 20 km DP OUED NOUMER
** ON SITE:
** CRD MUD LOGGING CABINE
** AVA CABINE+SOLID CONTROL MATERIALS +MUD PRODUCT. .
** SH MATERIALS PROGRAM
** cementing unit & crew + Water tank +Silos
* 46 JTS 18"5/8 87.5# K55 BTC + 200 JTS 13"3/8 68# N80 BTC + 04 JTS 7" 32# P 110 BTC
* 02 PUP JOINT 13"3/8 +02 PUP JOINT 9"5/8 + 02 PUP JOINT 7"
* 02 X-O FULL JOINT 7" 32# P110 N.VAM BOX * BTC PIN
* 30" CONDUCTOR PIPE
* SHOCK SUB 11"
* BIT SUB 8 5/8X 7 5/8
** ENTP FUEL RIG/CAMP STORAGE :/m3, USED m3
********************************** NEEDS AND MISSING EQUIPMENT****************
* NEED STINGER 4"1/2 IF
* CARTOUCHE IMPRIMANTE HP LASER JET P3005 PCL6 (51A)
* V-SAT DOWN FROM OLD WELL GED-2
** RECTIFIER (onduleur)
OpenWells Printed: février 09, 2017 at 6:33 am SHDDR v5.0_22/Nov/2014
Page 3 sur 3