Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Project: RR-Upgrade Drainage System ETAP Page: 1

Location: RIYADH REFINERY 16.0.0C Date: Apr 11, 2018


Contract: BI-10-00787 Enhancement Scope SN: SASEC-OTI

Engineer: SASEC-JRB Revision: Base


Study Case: LFM-787
Filename: BI-10-00787 Config.: LFM787

Maximum voltage Study case( All motor loads are switched off)

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

1-TR-1 Transformer 60.000 6.915 11.5 6.801 11.3

1-TR-2 Transformer 60.000 5.156 8.6 5.134 8.6

1ATX-304 (S-27) Transformer 16.000

1ATX-305 (S-27) Transformer 16.000

1ATX-306(S-28) Transformer 10.000

1ATX-307(S-28) Transformer 10.000

15TR1-3 Transformer 4.560

15TR1-4 Transformer 1.782 0.395 22.2 0.394 22.1

15TR2-3 Transformer 4.560

15TR2-4 Transformer 1.782 0.253 14.2 0.251 14.1

15TR3-4 Transformer 2.228 0.031 1.4 0.031 1.4

15TR4-4 Transformer 2.228 0.043 1.9 0.043 1.9

22TR5-4 Transformer 2.000 0.280 14.0 0.280 14.0

22TR6-4 Transformer 2.000

25XFR301 Transformer 2.656 0.260 9.8 0.260 9.8

25XFR302 Transformer 2.656 0.256 9.7 0.256 9.6

25XFR303 Transformer 2.656 0.944 35.6 0.931 35.1

25XFR304 Transformer 2.656 0.474 17.8 0.470 17.7

27TX-301 Transformer 3.125 0.130 4.1 0.129 4.1

27TX-302 Transformer 3.125 0.140 4.5 0.140 4.5

27TX-303 Transformer 3.125

27TX-304 Transformer 3.125 0.292 9.3 0.291 9.3

28TX-303 Transformer 3.125 0.147 4.7 0.146 4.7

28TX-304 Transformer 3.125 0.129 4.1 0.129 4.1

28TX-305 Transformer 3.125 0.216 6.9 0.216 6.9

28TX-306 Transformer 3.125 0.246 7.9 0.245 7.8

040-T301 Transformer 2.500 1.059 42.4 1.055 42.2

1201XFR101 Transformer 2.000

BLDA-XFRA Transformer 0.750 0.452 60.3 0.441 58.8

BLDGB-XFRB Transformer 0.750 0.484 64.6 0.472 62.9

FIRE-TRG Transformer 0.500 0.041 8.1 0.040 8.1

GT1 Transformer 40.000 20.079 50.2 18.684 46.7

GT2 Transformer 40.000 4.015 10.0 3.979 9.9


Project: RR-Upgrade Drainage System ETAP Page: 2
Location: RIYADH REFINERY 16.0.0C Date: Apr 11, 2018
Contract: BI-10-00787 Enhancement Scope SN: SASEC-OTI

Engineer: SASEC-JRB Revision: Base


Study Case: LFM-787
Filename: BI-10-00787 Config.: LFM787

Maximum voltage Study case( All motor loads are switched off)

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
(Amp) Amp (MVA)
ID Type % MVA % MVA %

NFS-XFR Transformer 0.750 0.072 9.5 0.071 9.5

P63XFR(1)301 Transformer 1.000 0.315 31.5 0.312 31.2

T1 Transformer 1.500 0.608 40.6 0.596 39.8

T1-COMBLDG Transformer 0.750 0.113 15.0 0.112 14.9

T2 Transformer 0.225 0.195 86.5 0.192 85.3

T3-1 Transformer 0.225 0.160 70.9 0.158 70.4

T4 Transformer 1.500 0.648 43.2 0.641 42.7

T-161A Transformer 1.000 0.167 16.7 0.166 16.6

TR-AREA-53-1 Transformer 0.225 0.035 15.7 0.035 15.6

TR-AREA53-2 Transformer 0.225 0.035 15.7 0.035 15.6

TX-9-1 Transformer 0.500 0.048 9.6 0.048 9.5

TX-11A Transformer 8.911

TX-11B Transformer 8.911

TX-12A Transformer 2.785 0.691 24.8 0.685 24.6

TX-12B Transformer 2.785 0.546 19.6 0.544 19.5

TX-13A Transformer 1.094

TX-13B Transformer 1.094

TX-22A(EXIST) Transformer 2.656 0.791 29.8 0.780 29.4

TX-31B Transformer 1.500 0.444 29.6 0.439 29.2

TX-51(Exist) Transformer 1.722 0.243 14.1 0.241 14.0

TX-81 Transformer 0.500 0.072 14.4 0.072 14.3

TX-91 Transformer 0.500 0.127 25.3 0.125 25.1

TX-101 Transformer 1.500 0.337 22.4 0.333 22.2

TX-111 Transformer 1.000 0.144 14.4 0.143 14.3

TX-121 Transformer 1.000 0.076 7.6 0.076 7.6

TX-131 Transformer 0.500 0.241 48.2 0.238 47.6

TX-131A Transformer 0.500 0.249 49.7 0.244 48.9

TX-131B Transformer 0.500 0.384 76.8 0.374 74.8

TX-171A Transformer 10.000 0.018 0.2 0.018 0.2

TX-171B Transformer 10.000 0.018 0.2 0.018 0.2

TX-181A Transformer 2.000 0.302 15.1 0.301 15.0

TX-181B Transformer 2.000 1.751 87.5 1.699 85.0

XFR-CHILER Transformer 2.000 0.238 11.9 0.237 11.8

Z30-XFR-01 Transformer 1.000 0.153 15.3 0.153 15.3

Z35-1-XFR(T)3007 Transformer 0.300 0.079 26.3 0.078 26.0


Project: RR-Upgrade Drainage System ETAP Page: 3
Location: RIYADH REFINERY 16.0.0C Date: Apr 11, 2018
Contract: BI-10-00787 Enhancement Scope SN: SASEC-OTI

Engineer: SASEC-JRB Revision: Base


Study Case: LFM-787
Filename: BI-10-00787 Config.: LFM787

Maximum voltage Study case( All motor loads are switched off)

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
(Amp) Amp (MVA)
ID Type % MVA % MVA %

Z35-1-XFR(T)-3008 Transformer 0.500 0.042 8.4 0.042 8.3

Z35-1A-XFR(T)-3001 Transformer 0.750 0.074 9.8 0.073 9.8

Z35-1A-XFR(T)-3002 Transformer 0.750 0.060 8.0 0.060 8.0

Z35-20-XFR(T)-3003 Transformer 2.500 1.586 63.4 1.546 61.9

Z35-20-XFR(T)-3004 Transformer 3.125 2.284 73.1 2.204 70.5

Z36-01-XFR(T)-301 Transformer 2.785 0.412 14.8 0.411 14.8

Z36-01-XFR(T)-302 Transformer 2.785 0.229 8.2 0.229 8.2

Z36-024-TR1-2 Transformer 2.000 0.008 0.4 0.008 0.4

Z36-024-TR2-1 Transformer 14.591

Z36-024-TR2-2 Transformer 2.000 0.077 3.9 0.077 3.9

Z36-024TR1-1 Transformer 14.258

Z36-26-XFR(T)-301 Transformer 5.792

Z36-26-XFR(T)-302 Transformer 5.792

Z36-26-XFR(T)-303 Transformer 2.785 0.116 4.2 0.116 4.2

Z36-26-XFR(T)-304 Transformer 2.785 0.070 2.5 0.070 2.5

Z36-26-XFR(T)-305 Transformer 2.785 0.218 7.8 0.217 7.8

Z36-26-XFR(T)-306 Transformer 2.785 0.223 8.0 0.222 8.0

Z91-100-XFR-301 Transformer 1.275 0.118 9.2 0.118 9.2

Z91-100-XFR-302 Transformer 1.500 0.116 7.7 0.116 7.7

Z35-1A-XFR(T)-3001REACTOR Reactor 1600.00 58.45 3.65

* Indicates a branch with operating load exceeding the branch capability.

You might also like