KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
P16C / BBR84, Bandar Bukit Raja, 1. Ladder
Klang, Selangor. Date: Date:

1. Ladder
HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

(4) Place a warning sign.


Uneven Ground -Serious injury / fatality (5) Safe and adequate access.
2 5 10 Project Manager
- Collapse -Damage to property (5) Check ground condition.
(6) To provide appropriate PPE. Site Manager
Site Agent
Site Engineer
(4) Provide proper working platform for workers.
Working at height - Provide proper access for workers i.e. steel ladder. Site Supervisor
-Serious injury / fatality 2 5 10
- Fall of person (5) PTW SHO / SSS
(6) To provide appropriate PPE.
EO
Scaffolder
1 Ladder
(4) Provide proper working platform for workers. Work Leader
Unsecure objects -Serious injury / fatality - Provide safety access to work area.
2 5 10 Machinery opr/
- Falling objects -Damage to property - Barricade / cordon the activity area to warn public.
(6) To provide appropriate PPE. Driver
Signalman
Wet surface (5) Working area free from obstruction by any material. Banksman
-Minor injury 2 3 6
- Slipping (6) To provide appropriate PPE.
Rigger
Welder
(5) Training & Briefing. Workers
Lightning exposure -Serious injury / fatality 2 5 10 (5) Stop work during thunderstorm.
(6) To provide appropriate PPE.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Ladder (Cont’d)
HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

(5) Training & Briefing. Project Manager


Rain / storm / wind exposure -Minor injury 2 2 4 (5) Stop work during thunderstorm.
Site Manager
(6) To provide appropriate PPE.
Site Agent
Site Engineer
Site Supervisor
--Heat stress (4) Good / open ventilation at working area.
- To provide shelter/ rest area & drinking facilities SHO / SSS
Hot weather (low productivity) 2 3 6 (5) Take a 2-3 minutes rest after every 2 ( two ) hours.
- Skin burn EO
(6) To provide appropriate PPE.
Ladder Scaffolder
1
Work Leader
Machinery opr/
(5) Manual handling / lifting should be carry out with
Heavy load Driver
- Negligible Injury 1 3 3 correct method.
- Improper method of handling (6) To provide appropriate PPE. Signalman
Banksman
Rigger
(4) Spray water to reduce the dust. Welder
Dust exposure - Negligible Injury 1 3 3 (6) To provide appropriate PPE.
Workers

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)