ETABS Concrete Design Engineer

Project
Subject

ACI 318-08/IBC 2009 BEAM SECTION DESIGN Type:Sway Special Units: KN-m (Envelope)

Level : LANTAI3 L=4.250


Element : B160 D=0.500 B=0.250 bf=0.250
Section ID : B2 ds=0.000 dct=0.040 dcb=0.040
E=25742456.77 fc=30000.000 Lt.Wt. Fac.=1.000
fy=400000.003 fys=250000.000

Phi(Bending): 0.900
Phi(Shear): 0.750
Phi(Seis Shear): 0.600
Phi(Torsion): 0.750

Flexural Reinforcement for Major Axis Moment


------- End-I --------- --------- Middle -------- --------- End-J ---------
Rebar Area Rebar % Rebar Area Rebar % Rebar Area Rebar %
8.979E-04 0.718 3.222E-04 0.258 0.001 0.818 Top (+2 Axis)
4.343E-04 0.347 3.964E-04 0.317 4.919E-04 0.393 Bot (-2 Axis)

Design Mu Station Loc Design Mu Station Loc Design Mu Station Loc


-139.591 0.250 -39.360 2.699 -157.441 4.000 Top (+2 Axis)
69.795 0.250 55.006 2.699 78.721 4.000 Bot (-2 Axis)

Controlling Combo Controlling Combo Controlling Combo


COMB3 COMB3 COMB3 Top (+2 Axis)
COMB3 COMB3 COMB3 Bot (-2 Axis)

Shear Reinforcement for Major Shear (V2)


------- End-I --------- --------- Middle -------- --------- End-J ---------
Rebar Av/s Rebar Av/s Rebar Av/s
O/S 0.003 O/S

Design Vu Station Loc Design Vu Station Loc Design Vu Station Loc


294.116 0.250 239.711 2.699 275.047 3.188

Controlling Combo Controlling Combo Controlling Combo


COMB3 COMB3 COMB3

Torsion Reinforcement
------- Shear --------- ------ Longitudinal -----
Rebar At/s Rebar Al
5.401E-04 5.766E-04

Design Tu Station Loc Design Tu Station Loc


11.402 4.000 3.955 2.210

Controlling Combo Controlling Combo


COMB3 COMB3

O/S #45 Shear stress due to shear force and torsion together exceeds maximum allowed

ETABS v9.7.4 - File:DETAIL - KN-m Units February 5,2018 22:10


ETABS Concrete Design Engineer
Project
Subject

ACI 318-08/IBC 2009 BEAM SECTION DESIGN Type:Sway Special Units: KN-m (Envelope)

Level : LANTAI3 L=4.250


Element : B160 D=0.500 B=0.250 bf=0.250
Section ID : B2 ds=0.000 dct=0.040 dcb=0.040
E=25742456.77 fc=30000.000 Lt.Wt. Fac.=1.000
fy=400000.003 fys=250000.000

Phi(Bending): 0.900
Phi(Shear): 0.750
Phi(Seis Shear): 0.600
Phi(Torsion): 0.750

Flexural Reinforcement for Major Axis Moment


------- End-I --------- --------- Middle -------- --------- End-J ---------
Rebar Area Rebar % Rebar Area Rebar % Rebar Area Rebar %
8.135E-04 0.651 2.910E-04 0.233 9.174E-04 0.734 Top (+2 Axis)
4.810E-04 0.385 3.683E-04 0.295 5.586E-04 0.447 Bot (-2 Axis)

Design Mu Station Loc Design Mu Station Loc Design Mu Station Loc


-127.236 0.250 -35.604 2.699 -142.414 4.000 Top (+2 Axis)
77.037 0.250 44.881 2.699 88.977 4.000 Bot (-2 Axis)

Controlling Combo Controlling Combo Controlling Combo


COMB3 COMB3 COMB3 Top (+2 Axis)
COMB3 COMB3 COMB3 Bot (-2 Axis)

Shear Reinforcement for Major Shear (V2)


------- End-I --------- --------- Middle -------- --------- End-J ---------
Rebar Av/s Rebar Av/s Rebar Av/s
0.003 0.002 0.003

Design Vu Station Loc Design Vu Station Loc Design Vu Station Loc


248.303 0.250 210.365 2.699 249.969 4.000

Controlling Combo Controlling Combo Controlling Combo


COMB3 COMB3 COMB3

Torsion Reinforcement
------- Shear --------- ------ Longitudinal -----
Rebar At/s Rebar Al
4.989E-04 5.850E-04

Design Tu Station Loc Design Tu Station Loc


10.532 4.000 3.709 2.210

Controlling Combo Controlling Combo


COMB3 COMB3