ANALYSIS OF
BEAM
(TRANSVERSE DIRECTION)
192

TRANSVERSE DIRECTION DUE TO DEAD LOAD AND LIVE LOAD

AT ROOF BEAM: Assumed Beam Dimension = 0.30m x 0.50m

1' 1 2 3 4 4'
1.00 m 6.00 m 6.00 m 6.00 m 1.00 m

1.50 m
0.50 m
0.50 m
1.50 m

3.00 m
1.00 m 6.00 m

TRIBUTARY AREA CARRIED BY THE BEAM:

 FOR SPAN 1'-1, 4-4'

Tributary Area = Tributary area for 1′ − 1 = Tributary area for 4 − 4′

(b)(h) (1m)(0.5m)
Tributary Area = 2( ) = 2( )
2 2

𝐓𝐫𝐢𝐛𝐮𝐭𝐚𝐫𝐲 𝐀𝐫𝐞𝐚 = 𝟎. 𝟓 𝐦𝟐

 FOR SPAN 1-2, 2-3, 3-4

Tributary Area = constant for all beam from joint 1 to 4

(b1 + b2)(h) (6 m + 3m)(1.5m)


Tributary Area = 2( ) = 2( )
2 2

𝐓𝐫𝐢𝐛𝐮𝐭𝐚𝐫𝐲 𝐀𝐫𝐞𝐚 = 𝟏𝟑. 𝟓 𝐦𝟐


193

COMPUTATION OF LOAD PER SPAN:

 FOR SPAN 1'-1 and 4-4'

DEAD LOAD (UNIFORM LOAD)

WBEAM = 23.54 kN/m³ (0..30m x 0.50m) = 3.531 kN/m


1
WPLUMBING = 0.25 kN/m2 (0.5m2)(1𝑚) = 0.125 kN/m

1
WMECHANICAL & ELEC. FIXTURE = 0.25 kN/m2 (0.5m2)(1𝑚) = 0.125 kN/m

1
WSLAB = 23.54 kN/m3 (0.125m)(0.5m2) (1𝑚) = 1.471 kN/m

TOTAL W DL = 5.252 kN/m

DEAD LOAD (CONCENTRATED LOAD)

WPARAPET WALL = 16.5 kN/m3 (0.15m)(3m)(1.5m) = 11.138 kN

WPLASTERING = 0.24 kN/m2(1.5m)(3m)(2) = 2.160 kN

TOTAL PDL = 13.298 kN

LIVE LOAD (UNIFORM LOAD)

WMAINTENANCE = 1.9kN/m2 (0.5m2) (1/1m) = 0.95 kN/m

WROOF LL =1kN/m2(0.5m2)(1/1m) = 0.5 kN/m

TOTAL WLL = 1.45 kN/m

 FOR SPAN 1-2

DEAD LOAD (UNIFORM LOAD)

WBEAM = 23.54 kN/m³ (0.30m x 0.50m) = 3.531 kN/m


194

W PLUMBING = 0.25 kN/m2 (13.50 m²) (1 / 6 m) = 0.563 kN/m

W MECHANICAL & ELEC. FIXTURE = 0.25 kN/m2 (13.50m²) (1 / 6 m) = 0.563 kN/m

TOTAL W DL = 4.657 kN/m

LIVE LOAD (UNIFORM LOAD)

W LL = Wt. for maintenance = 1.9kN/m2 (13.5 m²) (1 / 6 m) = 4.275 kN/m

 FOR SPAN 2-3

DEAD LOAD (UNIFORM LOAD)

WBEAM = 23.54 kN/m³ (0.30m x 0.50m) = 3.531 kN/m

W PLUMBING = 0.25 kN/m2 (13.50 m²) (1 / 6 m) = 0.563 kN/m

W MECHANICAL & ELEC. FIXTURE = 0.25 kN/m2 (13.50m²) (1 / 6 m) = 0.563 kN/m

TOTAL W DL = 4.657 kN/m

LIVE LOAD (UNIFORM LOAD)

W LL = Wt. for maintenance = 1.9kN/m2 (13.5 m²) (1 / 6 m) = 4.275 kN/m

 FOR SPAN 3-4

DEAD LOAD (UNIFORM LOAD)

WBEAM = 23.54 kN/m³ (0.30m x 0.50m) = 3.531 kN/m

W PLUMBING = 0.25 kN/m2 (13.50 m²) (1 / 6 m) = 0.563 kN/m

W MECHANICAL & ELEC. FIXTURE = 0.25 kN/m2 (13.50m²) (1 / 6 m) = 0.563 kN/m

TOTAL W DL = 4.657 kN/m


195

LIVE LOAD (UNIFORM LOAD)

W LL = Wt. for maintenance = 1.9kN/m2 (13.5 m²) (1 / 6 m) = 4.275 kN/m

POSITIONING OF DEAD LOAD

At Roof Beam

I. Solve for K where I=unity

𝐼 𝐿𝐶𝑀
K = (𝐿 ) ( )
𝐼

1 6
K1-1' = (1) (1) = 6

1 6
K4-4' = (1) (1) = 6

1 6
K1-2 =K2-1= (6) (1) = 1

1 6
K2-3 =K3-2= (6) (1) = 1

1 6
K3-4 =K4-3= (6) (1) = 1
196

II. Solve for Distribution Factor

𝐾 𝑜𝑓 𝑚𝑒𝑚𝑏𝑒𝑟
DF = ( ∑ 𝐾 @ 𝑗𝑜𝑖𝑛𝑡 )

DF1-1' = 0

DF1-2 = 1

1
DF2-1 = (1+1 ) = 0.5

1
DF2-3 = ( ) = 0.5
1+1

1
DF3-2 = (1+1 ) = 0.5

1
DF3-4 = (1+1 ) = 0.5

DF4-3 = 1

DF4-4' = 0

III. Solve for Fixed-End Moment

Dead Load

𝒘𝒍𝟐
FEM1-1' =FEM4-4' = ±( + 𝒑𝒍)
𝟐

5.252(1𝑚)2
FEM1-1' =FEM4-4' = ± [ + 13.298𝑘𝑁(1𝑚)]
2

FEM1-1' =FEM4-4' = ±15.924𝑘𝑁. 𝑚

𝒘𝒍𝟐
FEM = ±( 𝟏𝟐 )

4.657𝑘𝑁/𝑚(6𝑚)2
FEM1-2 =FEM2-1 = ± [ ]
12
197

FEM1-2 =FEM2-1 = ±(13.971𝑘𝑁. 𝑚)

4.657𝑘𝑁/𝑚(6𝑚)2
FEM2-3 =FEM3-2 = ± [ ]
12

FEM2-3 =FEM3-2 = ±(13.971𝑘𝑁. 𝑚)

4.657𝑘𝑁/𝑚(6𝑚)2
FEM3-4 =FEM4-3 = ± [ ]
12

FEM3-4 =FEM4-3 = ±(13.971𝑘𝑁. 𝑚)

POSITIONING OF LIVE LOAD CASE 1

At Roof Beam

Solve for Fixed-End Moment

Live Load

𝒘𝒍𝟐
FEM = ±( )
𝟐

(1.45𝑘𝑁/𝑚)(1𝑚)2
FEM1-1' =FEM4-4' = ± [ ]
2
198

FEM1-1' =FEM4-4' = ±0.73𝑘𝑁. 𝑚

𝒘𝒍𝟐
FEM = ±( 𝟏𝟐 )

0𝑘𝑁/𝑚(6𝑚)2
FEM1-2 =FEM2-1 = ± [ ]
12

FEM1-2 =FEM2-1 = ±(0𝑘𝑁. 𝑚)

4.275𝑘𝑁/𝑚(6𝑚)2
FEM2-3 =FEM3-2 = ± [ ]
12

FEM2-3 =FEM3-2 = ±(12.825𝑘𝑁. 𝑚)

0𝑘𝑁/𝑚(6𝑚)2
FEM3-4 =FEM4-3 = ± [ ]
12

FEM3-4 =FEM4-3 = ±(0𝑘𝑁. 𝑚)

POSITIONING OF LIVE LOAD CASE 2

At Roof Beam
199

Solve for Fixed-End Moment

Live Load

𝒘𝒍𝟐
FEM = ±( )
𝟐

0𝑘𝑁/𝑚)(1𝑚)2
FEM1-1' =FEM4-4' = ± [ ]
2

FEM1-1' =FEM4-4' = 0𝑘𝑁. 𝑚

𝒘𝒍𝟐
FEM = ±( 𝟏𝟐 )

4.275𝑘𝑁/𝑚(6𝑚)2
FEM1-2 =FEM2-1 = ± [ ]
12

FEM1-2 =FEM2-1 = ±(12.825𝑘𝑁. 𝑚)

0𝑘𝑁/𝑚(6𝑚)2
FEM2-3 =FEM3-2 = ± [ ]
12

FEM2-3 =FEM3-2 = (0𝑘𝑁. 𝑚)

4.275𝑘𝑁/𝑚(6𝑚)2
FEM3-4 =FEM4-3 = ± [ ]
12

FEM3-4 =FEM4-3 = ±(12.825𝑘𝑁. 𝑚)

THIRD POSITIONING OF LIVE LOAD

At Roof Beam
200

Solve for Fixed-End Moment

Live Load

𝒘𝒍𝟐
FEM = ±( )
𝟐

0𝑘𝑁/𝑚)(1𝑚)2
FEM1-1' =FEM4-4' = ± [ ]
2

FEM1-1' =FEM4-4' = 0𝑘𝑁. 𝑚

𝑤𝑙2
FEM = ±( 12 )

4.275𝑘𝑁/𝑚(6𝑚)2
FEM1-2 =FEM2-1 = ± [ ]
12

FEM1-2 =FEM2-1 = ±(12.825𝑘𝑁. 𝑚)

4.275𝑘𝑁/𝑚(6𝑚)2
FEM2-3 =FEM3-2 = ± [ ]
12

FEM2-3 =FEM3-2 = ±(12.825𝑘𝑁. 𝑚)

4.275𝑘𝑁/𝑚(6𝑚)2
FEM3-4 =FEM4-3 = ± [ 12
]
201

FEM3-4 =FEM4-3 = ±(12.825𝑘𝑁. 𝑚)

AT SECOND FLOOR BEAM: Assumed Beam Dimension = 0.30m x 0.50m

5 6 7 8
6.00 m 6.00 m 6.00 m

1.50 m

1.50 m

3.00 m
6.00 m

TRIBUTARY AREA CARRIED BY THE BEAM:

 FOR SPAN 5-6, 6-7,7-8

Tributary Area = constant for all beam from joint 5to 8

(b1 + b2)(h) (6 m + 3m)(1.5m)


Tributary Area = 2( ) = 2( )
2 2

𝐓𝐫𝐢𝐛𝐮𝐭𝐚𝐫𝐲 𝐀𝐫𝐞𝐚 = 𝟏𝟑. 𝟓 𝐦𝟐

COMPUTATION OF LOAD PER SPAN:

 FOR SPAN 5-6

DEAD LOAD (UNIFORM LOAD)


202

WBEAM = 23.54 kN/m³ (0.30m x 0.50m) = 3.531 kN/m

WSLAB = 23.54 kN/m³ (0.150m) (13.50 m²) (1 / 6 m) = 7.945 kN/m

W FLOOR FINISH = 1.10 kN/m2 (13.50 m²) (1 / 6 m) = 2.475 kN/m

W PLUMBING = 0.25 kN/m2 (13.50 m²) (1 / 6 m) = 0.563 kN/m

W MECHANICAL & ELEC. FIXTURE = 0.25 kN/m2 (13.50m²) (1 / 6 m) = 0.563 kN/m

WWALL = 16.5 kN/m3 (0.15m)(3m) = 7.425 kN/m

WPLASTERING = 0.24 kN/m2(3m)(2) = 1.44 kN/m

TOTAL W DL = 22.471 kN/m

LIVE LOAD (UNIFORM LOAD)

W LL = Wt. live load = 4.8kN/m2 (13.5 m²) (1 / 6 m) = 10.8 kN/m

 FOR SPAN 6-7

DEAD LOAD (UNIFORM LOAD)

WBEAM = 23.54 kN/m³ (0.30m x 0.50m) = 3.531 kN/m

WSLAB = 23.54 kN/m³ (0.150m) (13.50 m²) (1 / 6 m) = 7.945 kN/m

W FLOOR FINISH = 1.10 kN/m2 (13.50 m²) (1 / 6 m) = 2.475 kN/m

W PLUMBING = 0.25 kN/m2 (13.50 m²) (1 / 6 m) = 0.563 kN/m

W MECHANICAL & ELEC. FIXTURE = 0.25 kN/m2 (13.50m²) (1 / 6 m) = 0.563 kN/m

TOTAL W DL = 13.606 kN/m

LIVE LOAD (UNIFORM LOAD)

W LL = Wt. live load = 4.8kN/m2 (13.5 m²) (1 / 6 m) = 10.8 kN/m

 FOR SPAN 7-8


203

DEAD LOAD (UNIFORM LOAD)

WBEAM = 23.54 kN/m³ (0.30m x 0.50m) = 3.531 kN/m

WSLAB = 23.54 kN/m³ (0.150m) (13.50 m²) (1 / 6 m) = 7.945 kN/m

W FLOOR FINISH = 1.10 kN/m2 (13.50 m²) (1 / 6 m) = 2.475 kN/m

W PLUMBING = 0.25 kN/m2 (13.50 m²) (1 / 6 m) = 0.563 kN/m

W MECHANICAL & ELEC. FIXTURE = 0.25 kN/m2 (13.50m²) (1 / 6 m) = 0.563 kN/m

WWINDOWS, GLASS, FRAME and SASH =0.38 kN/m2(13.50m2)(1/6 m) = 0.855 kN/m

TOTAL W DL = 14.889 kN/m

LIVE LOAD (UNIFORM LOAD)

W LL = Wt. live load = 4.8kN/m2 (13.5 m²) (1 / 6 m) = 10.8 kN/m

POSITIONING OF DEAD LOAD

At Second Floor Beam

22.471 kN/m
13.606 kN/m 14.889 kN/m

5 6 7 8
6.00 m 6.00 m 6.00 m

I. Solve for K where I=unity


204

𝐼 𝐿𝐶𝑀
K = (𝐿 ) ( )
𝐼

1 6
K5-6 =K6-5= (6) (1) = 1

1 6
K6-7 =K7-6= (6) (1) = 1

1 6
K7-8 =K8-7= (6) (1) = 1

II. Solve for Distribution Factor

𝐾 𝑜𝑓 𝑚𝑒𝑚𝑏𝑒𝑟
DF = ( ∑ 𝐾 @ 𝑗𝑜𝑖𝑛𝑡 )

DF5-6 = 1

1
DF6-5 = (1+1 ) = 0.5

1
DF6-7 = (1+1 ) = 0.5

1
DF7-6 = (1+1 ) = 0.5

1
DF7-8 = (1+1 ) = 0.5

DF8-7 = 1

III. Solve for Fixed-End Moment

Dead Load

𝒘𝒍𝟐
FEM = ±( 𝟏𝟐 )

22.471𝑘𝑁/𝑚(6𝑚)2
FEM5-6 =FEM6-5 = ± [ ]
12

FEM5-6 =FEM6-5 = ±(67.413𝑘𝑁. 𝑚)


205

13.606𝑘𝑁/𝑚(6𝑚)2
FEM6-7 =FEM7-6 = ± [ ]
12

FEM6-7 =FEM7-6 = ±(40.818𝑘𝑁. 𝑚)

14.889𝑘𝑁/𝑚(6𝑚)2
FEM7-8 =FEM8-7 = ± [ ]
12

FEM7-8 =FEM8-7 = ±(44.667𝑘𝑁. 𝑚)

POSITIONING OF LIVE LOAD CASE 1

At Second Floor Beam

10.8 kN/m

5 6 7 8
6.00 m 6.00 m 6.00 m

Solve for Fixed-End Moment

Live Load

𝒘𝒍𝟐
FEM = ±( 𝟏𝟐 )

0𝑘𝑁/𝑚(6𝑚)2
FEM5-6 =FEM6-5 = ± [ ]
12

FEM5-6 =FEM6-5 = 0 𝑘𝑁. 𝑚


206

10.8𝑘𝑁/𝑚(6𝑚)2
FEM6-7 =FEM7-6 = ± [ ]
12

FEM6-7 =FEM7-6 = ±(32.4𝑘𝑁. 𝑚)

0𝑘𝑁/𝑚(6𝑚)2
FEM7-8 =FEM8-7 = ± [ ]
12

FEM7-8 =FEM8-7 = 0 𝑘𝑁. 𝑚

POSITIONING OF LIVE LOAD CASE 2

At Second Floor Beam

10.8 kN/m 10.8 kN/m

5 6 7 8
6.00 m 6.00 m 6.00 m

Solve for Fixed-End Moment

Live Load

𝒘𝒍𝟐
FEM = ±( 𝟏𝟐 )

10.8𝑘𝑁/𝑚(6𝑚)2
FEM5-6 =FEM6-5 = ± [ ]
12
207

FEM5-6 =FEM6-5 = ±(32.4𝑘𝑁. 𝑚)

0𝑘𝑁/𝑚(6𝑚)2
FEM6-7 =FEM7-6 = ± [ ]
12

FEM6-7 =FEM7-6 = 0 𝑘𝑁. 𝑚

10.8𝑘𝑁/𝑚(6𝑚)2
FEM7-8 =FEM8-7 = ± [ ]
12

FEM7-8 =FEM8-7 = ±(32.4𝑘𝑁. 𝑚)


208

MOMENT DISTRIBUTION

METHOD FOR

TRANSVERSE SECTION
191

TRANSVERSE DIRECTION
ROOF BEAM
DEAD LOAD
JOINT 1 2 3 4
MEMBER 1-1' 1-2 2-1 2-3 3-2 3-4 4-3 4-4'
K 6 1 1 1 1 1 1 6
CYCLE DF 0.00000 1.00000 0.50000 0.50000 0.50000 0.50000 1.00000 0.00000
1 FEM 15.92400 -13.97100 13.97100 -13.97100 13.97100 -13.97100 13.97100 -15.92400
BAL 0.00000 -1.95300 0.00000 0.00000 0.00000 0.00000 1.95300 0.00000
2 CO 0.00000 0.00000 -0.97650 0.00000 0.00000 0.97650 0.00000 0.00000
BAL 0.00000 0.00000 0.48825 0.48825 -0.48825 -0.48825 0.00000 0.00000
3 CO 0.00000 0.24413 0.00000 -0.24413 0.24413 0.00000 -0.24413 0.00000
BAL 0.00000 -0.24413 0.12206 0.12206 -0.12206 -0.12206 0.24413 0.00000
4 CO 0.00000 0.06103 -0.12206 -0.06103 0.06103 0.12206 -0.06103 0.00000
BAL 0.00000 -0.06103 0.09155 0.09155 -0.09155 -0.09155 0.06103 0.00000
TOTAL 15.92400 -15.92400 13.57430 -13.57430 13.57430 -13.57430 15.92400 -15.92400
SBR 18.55000 13.97100 13.97100 13.97100 13.97100 13.97100 13.97100 18.55000
EMR 0.39162 -0.39162 0.00000 0.00000 -0.39162 0.39162
V 18.55000 14.36262 13.57938 13.97100 13.97100 13.57938 14.36262 18.55000
R 32.91262 27.55038 27.55038 32.91262
192

TRANSVERSE DIRECTION
ROOF BEAM
LIVE LOAD CASE 1
JOINT 1 2 3 4
MEMBER 1-1' 1-2 2-1 2-3 3-2 3-4 4-3 4-4'
K 6 1 1 1 1 1 1 6
CYCLE DF 0.00000 1.00000 0.50000 0.50000 0.50000 0.50000 1.00000 0.00000
1 FEM 0.72500 0.00000 0.00000 -12.82500 12.82500 0.00000 0.00000 -0.72500
BAL 0.00000 -0.72500 6.41250 6.41250 -6.41250 -6.41250 0.72500 0.00000
2 CO 0.00000 3.20625 -0.36250 -3.20625 3.20625 0.36250 -3.20625 0.00000
BAL 0.00000 -3.20625 1.78438 1.78438 -1.78438 -1.78438 3.20625 0.00000
3 CO 0.00000 0.89219 -1.60313 -0.89219 0.89219 1.60313 -0.89219 0.00000
BAL 0.00000 -0.89219 1.24766 1.24766 -1.24766 -1.24766 0.89219 0.00000
4 CO 0.00000 0.62383 -0.44609 -0.62383 0.62383 0.44609 -0.62383 0.00000
BAL 0.00000 -0.62383 0.53496 0.53496 -0.53496 -0.53496 0.62383 0.00000
TOTAL 0.72500 -0.72500 7.56777 -7.56777 7.56777 -7.56777 0.72500 -0.72500
SBR 1.45000 0.00000 0.00000 12.82500 12.82500 0.00000 0.00000 1.45000
EMR -1.14046 1.14046 0.00000 0.00000 1.14046 -1.14046
V 1.45000 -1.14046 1.14046 12.82500 12.82500 1.14046 -1.14046 1.45000
R 0.30954 13.96546 13.96546 0.30954
193

TRANSVERSE DIRECTION
ROOF BEAM
LIVE LOAD CASE 2
JOINT 1 2 3 4
MEMBER 1-1' 1-2 2-1 2-3 3-2 3-4 4-3 4-4'
K 6 1 1 1 1 1 1 6
CYCLE DF 0.00000 1.00000 0.50000 0.50000 0.50000 0.50000 1.00000 0.00000
1 FEM 0.00000 -12.82500 12.82500 0.00000 0.00000 -12.82500 12.82500 0.00000
BAL 0.00000 12.82500 -6.41250 -6.41250 6.41250 6.41250 -12.82500 0.00000
2 CO 0.00000 -3.20625 6.41250 3.20625 -3.20625 -6.41250 3.20625 0.00000
BAL 0.00000 3.20625 -4.80938 -4.80938 4.80938 4.80938 -3.20625 0.00000
3 CO 0.00000 -2.40469 1.60313 2.40469 -2.40469 -1.60313 2.40469 0.00000
BAL 0.00000 2.40469 -2.00391 -2.00391 2.00391 2.00391 -2.40469 0.00000
4 CO 0.00000 -1.00195 1.20234 1.00195 -1.00195 -1.20234 1.00195 0.00000
BAL 0.00000 1.00195 -1.10215 -1.10215 1.10215 1.10215 -1.00195 0.00000
TOTAL 0.00000 0.00000 7.71504 -7.71504 7.71504 -7.71504 0.00000 0.00000
SBR 0.00000 12.82500 12.82500 0.00000 0.00000 12.82500 12.82500 0.00000
EMR -1.28584 1.28584 0.00000 0.00000 1.28584 -1.28584
V 0.00000 11.53916 14.11084 0.00000 0.00000 14.11084 11.53916 0.00000
R 11.53916 14.11084 14.11084 11.53916
194

TRANSVERSE DIRECTION
ROOF BEAM
LIVE LOAD CASE 3
JOINT 1 2 3 4
MEMBER 1-1' 1-2 2-1 2-3 3-2 3-4 4-3 4-4'
K 6 1 1 1 1 1 1 6
CYCLE DF 0.00000 1.00000 0.50000 0.50000 0.50000 0.50000 1.00000 0.00000
1 FEM 0.00000 -12.82500 12.82500 -12.82500 12.82500 -12.82500 12.82500 0.00000
BAL 0.00000 12.82500 0.00000 0.00000 0.00000 0.00000 -12.82500 0.00000
2 CO 0.00000 0.00000 6.41250 0.00000 0.00000 -6.41250 0.00000 0.00000
BAL 0.00000 0.00000 -3.20625 -3.20625 3.20625 3.20625 0.00000 0.00000
3 CO 0.00000 -1.60313 0.00000 1.60313 -1.60313 0.00000 1.60313 0.00000
BAL 0.00000 1.60313 -0.80156 -0.80156 0.80156 0.80156 -1.60313 0.00000
4 CO 0.00000 -0.40078 0.80156 0.40078 -0.40078 -0.80156 0.40078 0.00000
BAL 0.00000 0.40078 -0.60117 -0.60117 0.60117 0.60117 -0.40078 0.00000
TOTAL 0.00000 0.00000 15.43008 -15.43008 15.43008 -15.43008 0.00000 0.00000
SBR 0.00000 12.82500 12.82500 12.82500 12.82500 12.82500 12.82500 0.00000
EMR -2.57168 2.57168 0.00000 0.00000 2.57168 -2.57168
V 0.00000 10.25332 15.39668 12.82500 12.82500 15.39668 10.25332 0.00000
R 10.25332 28.22168 28.22168 10.25332
195

TRANSVERSE DIRECTION
SECOND FLOOR BEAM
DEAD LOAD
JOINT 5 6 7 8
MEMBER 5-6 6-5 6-7 7-6 7-8 8-7
K 1 1 1 1 1 1
CYCLE DF 1.00000 0.50000 0.50000 0.50000 0.50000 1.00000
1 FEM -67.41300 67.41300 -40.81800 40.81800 -44.66700 44.66700
BAL 67.41300 -13.29750 -13.29750 1.92450 1.92450 -44.66700
2 CO -6.64875 33.70650 0.96225 -6.64875 -22.33350 0.96225
BAL 6.64875 -17.33438 -17.33438 14.49113 14.49113 -0.96225
3 CO -8.66719 3.32438 7.24556 -8.66719 -0.48113 7.24556
BAL 8.66719 -5.28497 -5.28497 4.57416 4.57416 -7.24556
4 CO -2.64248 4.33359 2.28708 -2.64248 -3.62278 2.28708
BAL 2.64248 -3.31034 -3.31034 3.13263 3.13263 -2.28708
TOTAL 0.00000 69.55029 -69.55029 46.98199 -46.98199 0.00000
SBR 67.41300 67.41300 40.81800 40.81800 44.66700 44.66700
EMR -11.59171 11.59171 3.76138 -3.76138 7.83033 -7.83033
V 55.82129 79.00471 44.57938 37.05662 52.49733 36.83667
R 55.82129 123.58410 89.55395 36.83667
196

TRANSVERSE DIRECTION
SECOND FLOOR BEAM
LIVE LOAD CASE 1
JOINT 5 6 7 8
MEMBER 5-6 6-5 6-7 7-6 7-8 8-7
K 1 1 1 1 1 1
CYCLE DF 1.00000 0.50000 0.50000 0.50000 0.50000 1.00000
1 FEM 0.00000 0.00000 -32.40000 32.40000 0.00000 0.00000
BAL 0.00000 16.20000 16.20000 -16.20000 -16.20000 0.00000
2 CO 8.10000 0.00000 -8.10000 8.10000 0.00000 -8.10000
BAL -8.10000 4.05000 4.05000 -4.05000 -4.05000 8.10000
3 CO 2.02500 -4.05000 -2.02500 2.02500 4.05000 -2.02500
BAL -2.02500 3.03750 3.03750 -3.03750 -3.03750 2.02500
4 CO 1.51875 -1.01250 -1.51875 1.51875 1.01250 -1.51875
BAL -1.51875 1.26563 1.26563 -1.26563 -1.26563 1.51875
TOTAL 0.00000 19.49063 -19.49063 19.49063 -19.49063 0.00000
SBR 0.00000 0.00000 32.40000 32.40000 0.00000 0.00000
EMR -3.24844 3.24844 0.00000 0.00000 3.24844 -3.24844
V -3.24844 3.24844 32.40000 32.40000 3.24844 -3.24844
R -3.24844 35.64844 35.64844 -3.24844
197

TRANSVERSE DIRECTION
SECOND FLOOR BEAM
LIVE LOAD CASE 2
JOINT 5 6 7 8
MEMBER 5-6 6-5 6-7 7-6 7-8 8-7
K 1 1 1 1 1 1
CYCLE DF 1.00000 0.50000 0.50000 0.50000 0.50000 1.00000
1 FEM -32.40000 32.40000 0.00000 0.00000 -32.40000 32.40000
BAL 32.40000 -16.20000 -16.20000 16.20000 16.20000 -32.40000
2 CO -8.10000 16.20000 8.10000 -8.10000 -16.20000 8.10000
BAL 8.10000 -12.15000 -12.15000 12.15000 12.15000 -8.10000
3 CO -6.07500 4.05000 6.07500 -6.07500 -4.05000 6.07500
BAL 6.07500 -5.06250 -5.06250 5.06250 5.06250 -6.07500
4 CO -2.53125 3.03750 2.53125 -2.53125 -3.03750 2.53125
BAL 2.53125 -2.78438 -2.78438 2.78438 2.78438 -2.53125
TOTAL 0.00000 19.49063 -19.49063 19.49063 -19.49063 0.00000
SBR 32.40000 32.40000 0.00000 0.00000 32.40000 32.40000
EMR -3.24844 3.24844 0.00000 0.00000 3.24844 -3.24844
V 29.15156 35.64844 0.00000 0.00000 35.64844 29.15156
R 29.15156 35.64844 35.64844 29.15156
198

TRANSVERSE DIRECTION
SECOND FLOOR BEAM
LIVE LOAD CASE 3
JOINT 5 6 7 8
MEMBER 5-6 6-5 6-7 7-6 7-8 8-7
K 1 1 1 1 1 1
CYCLE DF 1.00000 0.50000 0.50000 0.50000 0.50000 1.00000
1 FEM -32.40000 32.40000 -32.40000 32.40000 -32.40000 32.40000
BAL 32.40000 0.00000 0.00000 0.00000 0.00000 -32.40000
2 CO 0.00000 16.20000 0.00000 0.00000 -16.20000 0.00000
BAL 0.00000 -8.10000 -8.10000 8.10000 8.10000 0.00000
3 CO -4.05000 0.00000 4.05000 -4.05000 0.00000 4.05000
BAL 4.05000 -2.02500 -2.02500 2.02500 2.02500 -4.05000
4 CO -1.01250 2.02500 1.01250 -1.01250 -2.02500 1.01250
BAL 1.01250 -1.51875 -1.51875 1.51875 1.51875 -1.01250
TOTAL 0.00000 38.98125 -38.98125 38.98125 -38.98125 0.00000
SBR 32.40000 32.40000 32.40000 32.40000 32.40000 32.40000
EMR -6.49688 6.49688 0.00000 0.00000 6.49688 -6.49688
V 25.90313 38.89688 32.40000 32.40000 38.89688 25.90313
R 25.90313 71.29688 71.29688 25.90313
191

SHEAR AND MOMENT

DIAGRAM FOR

TRANSVERSE SECTION
192

SHEAR AND MOMENT DIAGRAM DUE TO DEAD LOAD

TRANSVERSE SECTION AT ROOF BEAM

13.298 kN 13.298 kN
KKKKKkN kN KKKKKkN kN

5.252 kN/m 5.252 kN/m


4.657 kN/m

1m 6m 6m 6m 1m

14.363 kN 13.971 kN 13.579 kN 18.550 kN


13.298 kN

-13.298 kN
-18.550 kN -13.579 kN -13.971 kN -14.363 kN

7.382 kN.m
6.225 kN.m 6.223 kN.m

-13.574 kN.m -13.574 kN.m


-15.924 kN.m -15.924 kN.m
193

SHEAR AND MOMENT DIAGRAM DUE TO LIVE LOAD CASE 1

TRANSVERSE SECTION AT ROOF BEAM

4.275 kN/m

1.45 kN/m 1.45 kN/m

1m 6m 6m 6m 1m

12.825 kN

1.45 kN
1.140 kN

- 1.140 kN
-1.450 kN

-12.825 kN

11.670 kN.m

-0.725 kN.m -0.725 kN.m

-7.568 kN.m -7.568 kN.m


194

SHEAR AND MOMENT DIAGRAM DUE TO LIVE LOAD CASE 2

TRANSVERSE SECTION AT ROOF BEAM

4.275 kN/m 4.275 kN/m

14.111 kN
11.539 kN

-11.539 kN
-14.111 kN

15.573 kN.m 15.573 kN.m

-7.715 kN.m
195

SHEAR AND MOMENT DIAGRAM DUE TO LIVE LOAD CASE 3

TRANSVERSE SECTION AT ROOF BEAM

4.275 kN/m

15.397 kN
12.825 kN
10.253 kN

-10.253 kN
-12.825 kN
-15.397 kN

12.295 kN.m 12.295 kN.m

3.806 kN.m

-15.430 kN.m -15.430 kN.m


196

SHEAR AND MOMENT DIAGRAM DUE TO DEAD LOAD

TRANSVERSE SECTION AT SECOND FLOOR BEAM

22.471 kN/m
14.889 kN/m
13.606 kN/m

55.821 kN 52.497 kN
44.579 kN

-37.057 kN 36.837 kN

-79.005 kN

69.333 kN.m
45.567 kN.m

3.480 kN.m

-46.982 kN.m

-69.550 kN.m
197

SHEAR AND MOMENT DIAGRAM DUE TO LIVE LOAD CASE 1

TRANSVERSE SECTION AT SECOND FLOOR BEAM

10.8 kN/m

32.400 kN

3.248 kN

-3.248 kN

-32.400 kN

29.109 kN.m

-19.491 kN.m -19.491 kN.m


198

SHEAR AND MOMENT DIAGRAM DUE TO LIVE LOAD CASE 2

TRANSVERSE SECTION AT SECOND FLOOR BEAM

10.8 kN/m 10.8 kN/m

35.648 kN
29.152 kN

-29.152 kN
-35.648 kN

39.344 kN.m 39.344 kN.m

-19.491 kN.m
199

SHEAR AND MOMENT DIAGRAM DUE TO LIVE LOAD CASE 3

TRANSVERSE SECTION AT SECOND FLOOR BEAM

10.8 kN/m

38.897 kN
32.400 kN
25.903 kN

-25.903 kN
-32.400 kN
-38.897 kN

31.063 kN.m 31.063 kN.m

9.619 kN.m

-38.981 kN.m -38.981 kN.m