Professional Documents
Culture Documents
SA-000-R-11131 - Rev T02 - 3100 - Piping Install - SP - Spec - Incl. App 5 - 31.01.2009
SA-000-R-11131 - Rev T02 - 3100 - Piping Install - SP - Spec - Incl. App 5 - 31.01.2009
January 2009
Sultanate of Oman
Ministry of Transport and Communications
Development of Salalah International Airport
Main Contract 5
Project Specification
Civil Works - 3100 Piping Installations, Common
Requirements
Special Specification
January 2009
Prepared PZ
Checked JMJ
Approved STJ/NIER
Main Contract 5, Project Specification 1
Civil Works - 3100 Piping Installations, Common Requirements, Special Specification
Table of Contents
3100 Piping installations - Common requirements 4
3101 General 4
3101.1 Scope 4
3101.2 Exclusions 4
3101.3 Definitions 5
3101.4 Abbreviations 5
3101.5 Functional requirements and materials 9
3101.6 Installation and execution 12
3101.7 Testing 14
3102 Steel piping 19
3102.1 General 19
3102.2 Functional requirements and materials 22
3102.3 Installation and execution 27
3102.4 Inspection and Testing 31
3103 Polyethylene piping 36
3103.1 General 36
3103.2 Functional requirements and materials 37
3103.3 Installation and execution 39
3104 Ductile iron piping 41
3104.1 General 41
3104.2 Functional requirements and materials 42
3104.3 Installation and execution 45
3104.4 Inspection and testing 47
3104.5 Documentation 47
3105 Buried piping 47
3105.1 General 47
3105.2 Standards and references 48
3105.3 Functional requirements and materials 48
3105.4 Piping materials 48
3105.5 Earthworks materials 49
Revision Log 87
Table of Appendices
Appendix 1 - Specification of Piping Classes
Appendix 2 - Branch connection for Thermowell
Appendix 3 - Sample Control forms, Welding
Appendix 4 - Specification of Coating Systems
Appendix 5 - Data Sheets for mechanical installations
3101 General
3101.1 Scope
This Specification sets out the requirements for piping systems and applies to
the design, materials, fabrication, installation, testing and commissioning.
3101.2 Exclusions
This specification applies only to the issues related to handling, workmanship,
fabrication, control, testing, certification, documentation etc. of piping
materials and ancillaries used for the establishment of the piping systems
included in the Main Contract 1.
3101.3 Definitions
"Approved" shall mean approved by the Engineer unless otherwise
stated.
"Design approval" Custom made products for the use of which a type
approval has not been granted shall obtain design
approval. This involves independent body reviewing
design, calculations, compliance with design codes and
standards and performing or witnessing the test, both
destructive and non-destructive, as required by design
codes, standards and/or authorities.
3101.4 Abbreviations
AES Alkali earth silicate
ANSI American National Standards Institute
API/IP American Petroleum Institute / Industry Practise
References
All Regulations, Codes and Standards etc. referred to in this Specification shall
apply as latest editions, unless otherwise stated.
Mandatory Regulations
• Sultanate of Oman. Ministry of Housing, Electricity and Water (MHEW).
Design Guidelines and Standards for water supply systems. September
1987.
Piping components
ANSI/ASME B16.10 Face-to-Face and End-to-End dimensions of valves.
ANSI/ASME B16.21 Non-metallic Flat Gaskets for Pipe Flanges
ANSI/ASME B16.34 Valves flanged, threaded and welding end.
ANSI/ANSI B16.36 Orifice flanges
API 6D / ISO 14313 Specification for Pipeline Valves
API 590 Steel line blanks
BS EN 593 Industrial valves. Metallic butterfly valves.
BS EN ISO 4126-1 Safety devices for protection against excessive
pressure. Safety valves
BS ISO 7121 Steel ball valves for general-purpose industrial
applications
BS 7350 Specification for double regulating globe valves and
flow measurement devices for heating and chilled
water systems
Design
The design is based on BS EN 13480 with the exception of aviation fuel
system.
The Contractor shall select the materials in accordance with applicable piping
class specifications.
Dead ends on piping systems, except for drains, instrumentation and similar,
shall be avoided where possible.
If dead ends can not be avoided these shall, where possible, be oriented such
they are free of debris, organic growth and corrosion substances etc.
Piping shall be routed such that the optimal piping layout is achieved in terms
of process requirements, drainability, ergonomics, operation, inspection and
maintenance.
Having considered these factors, the number of unions, fittings, valves and
welds shall be minimized.
Approval of design
Following commencement date, the Contractor shall perform detailed design
based on employer's minimum requirements to the piping design to ensure that
the solutions presented in the tender documents are acceptable. The design shall
include, but not be limited to, stress analyses of piping systems, chilled and
potable water in particular, seismic aspects, etc. The results of piping stress
analyses shall be submitted for the Engineer's approval together with other
design documentation prepared by the Contractor in accordance with the
General Contract Requirements (GCR).
Connections
Preferred branch connections on headers are indicated on each individual
Piping Class specification sheets, but, where required to suit the design/layout,
it is permissible to substitute reducing tees with other suitable standard
components.
For primary connection details, see the relevant Piping Class specification
sheet.
Valves
The valve selection shall be in accordance with relevant Piping Class
specifications and valve Data Sheets.
If not specifically called up as reduced bore (RB) on P&IDs, ball valves shall
be the full bore type.
Bolting, plugs for drain & vent, etc. shall be fabricated in material similar to the
valve, and material for these items shall never be of lower performance
specification than the valve material itself.
Valve types not specified on the applicable piping specification may be used,
subject to the Engineer's approval.
Valve handle extensions shall be used on valves where the piping system has a
requirement for insulation.
The valve handle extensions must be the valve supplier's approved item or
equivalent.
Seals to be installed below ground level shall be rated for 100 kPa.
The seal design shall permit axial pipe movement due to thermal expansion or
contraction.
After installation, the seals shall be visually inspected and the inspection shall
be documented.
Miscellaneous items
Temperature measurement
Thermowells shall be used for accurate temperature measurement.
Bolting
Bolting shall be in accordance with the relevant Piping Class specification and
BS EN 1515.
Bolts sizes M12 or ½" or larger shall be hot dip galvanised according to BS EN
ISO 1461.
Other
Special piping parts, (SPP), are defined as in-line components, other than
standard pipes and pipe fittings, modified for the particular purpose and not
included in the piping specification sheets.
Orifice flanges shall be in accordance with ASME B16.36, i.e. threaded, socket
or butt weld type in accordance with the piping specification.
The butt weld type shall be used in conjunction with either a nipple or a nipo-
flange.
Identification
General
All piping materials shall be purchased fully marked for identification.
Tagging
All tag numbered items such as valves shall have a hard-stamped stainless steel
tag permanently attached for identification.
Stamping
Stamping in permanent legible manner on piping materials is allowed only
using round nose stencils.
Stainless steel materials shall be separated from carbon steel during storage and
fabrication, and shall be protected against weld spatter, grinding dust etc.
during installation, ensuring full anticorrosive surface.
All materials shall be handled and stored, such that the materials are not
damaged.
Delivery from prefabrication must include the seals necessary for protection.
Flange ends and weld grooves shall be protected by means of plastic caps or
other acceptable means of protection. Carbon steel materials shall be protected
against corrosion. All metallic pipes and fittings shall be prime coated before
shipment to protect against corrosion during transportation and storage. Use of
oils and bitumen paint will not be acceptable. Approved primer shall be used to
provide satisfactory protection against corrosion.
Before painting, coating or lining, all edges shall be chamfered with a radius of
2 mm or greater, inclusive of bolt holes.
All surface defects and contamination, e.g. skin laminations, weld spatter etc.,
shall be removed.
Caps or seals of an opening shall not be broken until final field construction is
to commence.
Pipe Connections
General
There are three types of pipe connections, i.e. welded, flanged and threaded.
The type of connection depends on the location of joint.
Flanged connections on buried pipes are not permitted and if for any reason
required, the flanged joint shall be located in a suitable pit/chamber.
Flange bolt holes shall be oriented as follows, unless otherwise indicated on the
Drawings:
• Flange face vertical - bolt holes shall straddle vertical centre line.
• Flange face horizontal - bolt holes shall straddle plant north-south centre
line.
Threaded connections are permitted for pipe sizes as defined in piping class
specification.
All connections to equipment and valves shall be either flanged or with three
piece unions for dismantling and removal.
Dimensional requirements
Dimensional requirements apply for all pipes supplied in accordance with
design drawings:
• as a complete spool
• as an individual spool piece
• as a spool for weld completion on site (field weld)
Spools for field welding on site shall have a 300 mm over length per connection,
unless otherwise noted.
Hook-up termination points for skids, modules etc. shall have a maximum
position tolerance of ± 6mm.
3101.7 Testing
Testing, general
In order to prove cleanliness, mechanical strength and tightness, each piping
system shall be treated to the degree outlined in this section.
All tests must be carried out according to relevant standards and procedures
approved by Engineer and shall be carried out to a successful conclusion and to
the Engineer's satisfaction.
Material to be used as test media other than mentioned in Table 3000.6.8 shall
be approved by the Engineer.
Definitions
Hydrostatic pressure test
A hydrostatic pressure test is carried out at a pressure determined in accordance
with the design code to prove mechanical strength of the component, normally
using water as test media.
Pneumatic pressure test can only be permitted where hydrostatic pressure test is
not practically possible.
Table 3101.6. (1): Status of instruments during flushing and pressure test
DO NOT INCLUDE IN
INCLUDE IN TEST
TEST
Analyzers X
Shut-off valve X
(note 1)
Check valve X
(note 1)
Control valve X
Flow instruments - D/P cell & bellows type X
Flow instruments - rotameters X
Flow meters - positive displacement type X
Flow meters - turbine type X
Flow indicating switches - bellows type X
Flow switches - vane type X
Gauge glasses X
Level instruments - displacer type X
(note 2)
Level inst. - D/P cell & bellows type X
Orifice plates X (note 3)
Pressure gauges X
Pressure instruments - all types X
Pressure regulators X
Pressure switches X
PSVs X
Equipment coils X
1. Ensure free flow through valve during test
2. Remove float
3. Install after hydro testing and line flushing
All test systems shall be reviewed to ensure that vents, drains, blind flanges,
flushing by-passes etc. are installed where required, whether or not shown on
the Drawings.
Instrument take off piping up to the first block valve shall be tested with the
piping or equipment to which it is connected.
Water for flushing and testing shall be of potable quality being clear, treated
water free of objectionable minerals, salts and organic materials.
Ball and control valves shall be fully open during flushing and three-quarters
open during pressure test, and drained afterwards.
All other valves shall be fully open during flush and pressure test.
Flushing
Prior to pressure and leak testing, all piping systems shall be first flushed as per
relevant standards unless otherwise agreed with the Engineer, until the inside of
the lines are considered thoroughly cleaned.
After flushing and testing, all lines shall be completely drained, unless
otherwise agreed with the Engineer.
Test pressure shall be in accordance with the relevant specifications and design
codes.
Due consideration should be given to dividing the systems into smaller parts,
recognizing the hazards of energy stored in compressed gas.
Any leaks or defects discovered by the tests shall be repaired and the system re-
tested at no additional cost to the Employer.
All temporary blanks and blinds shall be removed and all operating blinds
returned to the original operating position.
Valves, orifice plates, expansion joints and short pieces of piping, which have
been removed, shall be reinstalled with approved gaskets in place.
Lines being drained after testing shall have all vents open.
After lines have been drained, temporary supports shall be removed and
insulation and painting completed.
Spring supports provided with stops to carry the test load shall have these stops
removed after the pressure test.
Flanged joints, where test blinds have been removed, shall not be retested.
Special length bolting and gaskets shall be removed and replaced with line
class bolts and new gaskets.
Instruments, which were removed or blocked out for test, shall be reinstalled
and blocks placed in the normal operating position.
A gross leakage test using air may be conducted before the system leak test in
order to identify any large leaks.
A system leak test shall commence at 1.0 barg and a preliminary check shall be
made. Following which the pressure shall be gradually increased, allowing
equalization and intermediate check, until the final test pressure is reached,
followed by the final check.
A system leak test using an operating medium under operating conditions may
be used instead of the above test at the Engineer's discretion
Valve testing
Actuated valves shall be tested with actual actuator.
The test shall include opening of the valve with full differential pressure to
ensure that the actuator can operate the valve.
Stainless steel piping shall be pickled / passivated to restore the surface after
welding and remove any contamination, e.g. grinding dust etc.
Passivation and
Piping material
Description 3. Media Note 1
Code Note 1
Degreasing
Verification
rinsing
AVFU Aviation fuel CS Y Y - Y 1, 3 2 2 Y
CHWR/ Chilled water CS Y Y Y Y 1 1 1 -
CHWS
COND Condensate CS - - - - 1 1 1 -
CWS/ Condenser water CS / Y Y Y Y 1 1 1 -
CWR HDPE
FFW Fire fighting water CS - - - - 1 1 1 -
FFW Fire fighting water DI - - - - 1 1 1 -
IR Irrigation water CS - - - - 1 1 1 -
DW Potable water HDPE Y Y Y Y 1 1 1 -
DW Potable water DI Y Y Y Y 1 1 1 -
DW Potable water CS galv Y Y Y Y 1 1 1 -
Mothballing
Upon successful completion of all tests and commissioning of the piping
system, the entire installation shall be protected against degradation until
placing into operation. The Contractor shall prepare a protection procedure(s)
for submitting to the Engineer for review and approval and implement the
agreed means of protection to ensure that the system is in a "the ready for
operation" condition at all times.
Piping materials
Pressure parts
Flanges shall be in accordance with BS EN 1092-1 unless otherwise specified
in Piping Class specifications.
Pipes for the fuel hydrant system shall conform to API 5L.
Connections
Preferred branch connections on headers are indicated on each individual
Piping Class specification sheet, but, where required to suit the design/layout, it
is permissible to substitute "reducing tees" with "o’lets".
For primary connection details, refer to the relevant Piping Class specification
sheets.
Other
Pressure retaining fittings which are not made to approved standards, as e.g.
ASME B16.9, ASME B16.5 and BS EN 1092-1, shall be type approved or
alternatively design approved.
The design shall not include partly penetrated welds and all o’lets shall be fully
welded. O’lets shall be type approved or alternatively design approved.
The bends manufactured from longitudinal welded pipe shall have the weld
seam placed in the tensile zone between 10 and 45 degrees from the neutral
axis.
The bends manufactured from spiral welded pipe shall not contain skelp-end
welds.
Each end of the bend shall have a straight tangential length not less than the
nominal diameter.
The deviation from the stated bend angle shall not exceed 0.5 degree.
Minor defects may be removed by grinding provided that the minimum wall
thickness is maintained and the grinding does not exceed 300 mm in any
direction.
NDE
The wall thickness shall be verified measured along the longest arc together
with any area where defects have been ground out.
The finished bends shall be examined by magnetic particle or dye penetrant for
cracks.
Marking
The approved bends shall be marked as follows:
• Manufacturer's mark
• Contract identification number
• Design pressure (refer to Data Sheet)
• Design factor (refer to Data Sheet)
• Angle of bend (refer to Data Sheet)
• Material grade
• Unique bend number
• Inspection authority mark
Design
The isolating coupling shall be designed in accordance with ASME VIII Div. 1
or PD 5500.
Construction
Bolted or threaded joints are not permitted. The design of welds joining
coupling element and pipe pup-pieces shall permit radiographic examination of
joining welds.
Bore shall be not less than 90% of abutting pipe internal diameter.
Refer to specific Data Sheets for abutting pipe dimensions and material
specifications.
Materials
Materials shall be fully killed fine grain carbon steel conforming to specified
standards as indicated in this Specification.
Pipe pup-pieces may be free issued to the Supplier by the Contractor. If this is
not the case, pup-piece material shall be in accordance with the relevant Piping
Class Specification, and shall be the same diameter and wall thickness as the
line into which it will be installed.
Seals and dielectrics shall be inert and resistant to any blend of organic or
inorganic corrosion inhibitors and biocide microbiological growth inhibitors.
The isolating coupling Supplier shall obtain from the Contractor necessary
information regarding inhibitors to ensure appropriate selection of seal and
dielectric material.
Surface treatment
The bore of the isolation coupling assemblies shall be lined with a coating as
specified or to be approved by the Engineer, with minimum DFT of 300
microns, having electrical and abrasion resistance properties to prevent a
decrease in electrical resistance across the isolation coupling such as caused by
debris bridging the isolating ring.
All forgings shall be magnetic particle tested over the entire surface.
Hydrostatic testing
Each coupling shall be hydrostatically pressure tested to 1.7 times the system
design pressure as stated in the Data Sheet.
The pressure test is accepted with the full test pressure applied for a minimum
of 15 minutes for DN ≤ 450 mm or 30 minutes for DN > 450 mm.
Electrical test
The isolation couplings shall be electrically tested in a fully dried condition.
The strength test shall be by 5000 V AC, 50 Hz shall be applied for a period of
not less than one minute during which no puncture of coating or formation of
sparks may occur, and the leak current differential shall not exceed 2 mA.
Marking
The approved couplings shall be marked as follows:
• Manufacturer's mark
• Contract identification number
• Design pressure (refer to Data Sheet)
• Design factor (refer to Data Sheet)
• Allowable bending moment
• Material grade of pipe pup-pieces
• Unique coupling number
• Inspection authority mark
Weld bevels for butt weld of pipes and fittings shall be in accordance with the
relevant Welding Procedure Specification (WPS).
Welding requirements
Welding processes
Acceptable welding processes are as specified in BS EN ISO 4063, being:
Other welding processes are not acceptable unless agreed with the Engineer
prior to fabrication.
Welding consumables
All consumables shall be low hydrogen type with maximum 5 ml hydrogen/100
g weld metal (mercury method in accordance with BS EN ISO 3690).
Other consumables are not acceptable unless approved by the Engineer prior to
qualification of welding procedures or fabrication.
Wet or damaged electrodes, contaminated flux, and rusty filler wire shall be
rejected.
The qualification tests shall be performed on the same material as stated in the
relevant piping class specification.
The documentation for WPQR and production tests shall ensure traceability
between material including welding consumables and the material certificate.
The WPS shall only refer to one WPQR which shall include both the low and
high heat input level.
Welders' Qualification
Prior to the performance of any production welding, welders and welding
operators shall qualify for the relevant welding procedures according to
BS EN 287-1. Approval testing of welders - Fusion welding. Part 1: Steel.
Identification of welders
Welder's Performance Qualification (WPQ) certificates with photograph shall
be used unless otherwise agreed prior to fabrication.
The welder or operator shall mark his welds with his symbol.
A record shall be kept of the welder's or operator's work during the latest 12
months and be available for the Engineer at all times.
All welds shall be marked with a weld number and welder's designation.
These marks may be removed after completion and approval of the weld.
Welded connections
Adjacent sections of welded pipe that are joined by butt welding shall have the
longitudinal seams positioned so that they are at least 15 degrees apart.
Should the strikes occur, they shall be repaired in accordance with the
procedures approved by Contractor's QA department and Engineer's approved
welding repair procedure.
Tack welds
Tack welds shall be of a minimum length of four times the base metal thickness
or 50 mm, which is the lesser, and shall be carried out in accordance with an
approved welding procedure.
Tack welds that form part of the completed weld shall be ground to a feather
edge, and completely fused with the root run.
Cracked tack welds shall be completely removed by grinding and shall not be
incorporated into the finished weld.
Weld interruption
Welding shall not be discontinued until 25% of the weld thickness or 3 passes
are complete, whichever is more stringent.
At this stage, the weld profile should be con- cave, particularly at the weld
material/parent plate interface.
Weld repairs
All corrective work consisting of removal of defects and deposition of repair
welds shall be carried out in accordance with the qualified repair welding
The resulting cavity shall be clean, free from scale and have a contour to permit
ease in repair welding.
The production tests shall be taken directly from the production welds when it
is technically possible and the Engineer reserves the right to select the test
welds.
All costs related to the production tests shall be to the Contractor’s account.
If the production test does not fulfil the requirements, the cause of failing shall
immediately be established and brought to the attention of the Employer.
The Employer or his representative may specify further testing or the rejection
of the represented production welding.
If, for any reasons, the Engineer or other parties have reason to believe that a
weld contains unacceptable defects, the Contractor shall use any of the above or
alternative methods to determine the acceptability of the weld.
Qualification Requirements
The execution of all types of examination methods intended to be employed
during fabrication shall be qualified in accordance with relevant standard.
Examination Organization
The organization performing NDE shall be a manufacturer's NDE department
covered by a certified quality system according to EN ISO 9000 series or an
authorised independent inspection organization accredited according to EN
45001.
The Engineer shall approve prior to commencing any testing procedures other
examination organizations if so required.
The organization shall employ minimum one level 3 person certified according
to BS EN 473.
Examination Personnel
All personnel shall be certified in accordance with BS EN 473.
Other qualifications shall be agreed by the Engineer, who reserves the right to
require re-examination or rejection of NDE personnel.
Procedures
All NDE shall be performed in accordance with procedures which have been
approved by the responsible Level 3 personnel and the Employer in accordance
with the requirements of the applicable standards.
Reporting
The Contractor shall document the examinations in reports in accordance with
the requirements of the applicable standard with regard to examination
technique and results.
The reports shall include the parameters required for reproducing the
examination.
Before final NDE, the following resting periods shall have elapsed after
welding:
• C-Mn steel: 16 hours.
The following procedure can be used as an alternative for C-Mn steel to the 16-
hour hold between completing a weld and performing the final NDE for
approval:
• After completion, the welding and its surroundings are heated up to
minimum 200°C.
• The 200°C is maintained for 2 hours per 50 mm in thickness, minimum 2
hours.
• The weld is allowed to cool freely.
• NDE is performed after cooling to the temperature required for
performance of the examination.
Sequence of Examination
100% visual examination shall always be performed prior to other
examinations.
Surface Conditions
The surface and the adjacent area to be examined shall be clean and free of all
dirt, grease, paint, spatter, heavy oxidation etc. that may interfere with the
examination.
Random Examination
Where random examination is required, a complete examination of welds with
an accumulated length or number of welds corresponding to the specified
percentage of the welds in the lot shall be carried out.
The lot is defined as welds for piping for the given system.
Where practical, the selection shall ensure that the work product of each welder
or welding operator carrying out the production welding is included.
Where welding repair is required, the repair area including 100 mm on either
side shall be re-examined for external defects prior to welding.
Welding repairs (or replaced welds) shall be examined with the methods
prescribed for the original weld.
Table 3102.4. (1): Selection of examination method for detection of internal defects
Table 3102.4. (2): Selection of examination method for detection of external defects
Radiographic Examination
Examination technique to be in accordance with BS EN 1435 Class B.
Ultrasonic Examination
Examination technique: BS EN 1714 Level B
Visual examination
Examination technique: BS EN 970
Acceptance level: All areas with indications exceeding the signal from a 1 mm
deep notch shall be further investigated with MT or PT
All pressure piping components in HDPE potable water and fire fighting water
piping networks shall, as a minimum, conform to pressure Class PN16, refer to
piping Class Specification AP01.
HDPE suction pipes between tank and pump house, HDPE main supply line
from municipal metering chamber to the tank farm, HDPE condensate pipes
and buried interconnecting piping in the Chiller Plant shall as a minimum
conform to pressure Class PN10, refer to piping Class Specification AP02.
The HDPE fittings shall be compatible with the supplied pipe. The fittings shall
be suitable for butt fusion jointing.
All HDPE piping components shall be purchased from the same manufacturer
and shall be manufactured in like materials. In case the Contractor chooses
components manufactured from unlike materials the Contractor shall obtain an
approval of his selection of materials from the Engineer based on verification
of compatibility by performance of tests as specified in BS EN 12201.
The steel flange ring is connected to the carbon steel piping by a standard
flange by an expansion joint.
The HDPE pipe is protected by mass concrete around the pipe to a level of 200
mm above the pipe.
Marking
As for HDPE fittings.
The jointing procedure by butt welding shall be qualified and the test joints
shall be subject to tensile test in accordance with BS EN 12201.
Field butt weld fusion shall not proceed until a test joint has passed the bent
strap test carried out in accordance with applicable standard.
Cleaning of the hot plate of joining machine shall be carried out using
methylated spirit or alcohol. Use of chemical solvents is not permitted.
The beads of the completed joints shall not be removed either externally or
internally.
The HDPE Pipe and fittings shall be field joined by butt fusion welding using
the process of heat fusion.
The necessary equipments, tools, tackles etc. including plastic pipe welding
machine, hand tools, protection covers and tents etc. shall be provided by the
Contractor and shall be approved by the HDPE line pipe manufacturer and the
Engineer.
The Contractor shall prepare a method statement covering the jointing work to
be carried out and a detailed procedure for each type and size of the joint. These
shall be in accordance with the HDPE pipe manufacturer's recommendation.
Separate procedures shall be prepared for shop fabrication, test of welder's
qualification, site joining works and repair welding works.
In order to ensure cleaning of the pipeline with the use of foam pigs, particular
attention shall be paid to the need for effective internal cleaning of each
completed joint. The Contractor in consultation with the pipe manufacturer
shall propose a method for cleaning the internal joints, for review and approval,
in the detailed jointing procedure.
Each joint shall be inspected and certified by the pipe manufacturer to have
been executed in accordance with the approved jointing procedures. Inspection
or witnessing of the make up of the joints by the pipe manufacturer shall not
absolve the Contractor of his responsibilities to provide a fit for purpose joint
and the final guarantee for the system shall lie with the Contractor.
The procedure and method of butt fusion welding shall be in line with the
procedure outlined in ASTM D2657.
The Contractor shall, prior to welding, ensure that the pipe ends are clean,
parallel to the mating surface and are perpendicular to the centreline of the pipe.
Mismatch between walls thicknesses of mating pipes shall not be more than
10% of the design wall thickness.
Cleaning of the hot plate shall be carried out using methylated spirits or alcohol
as recommended by the equipment manufacturer.
The mating surfaces during the process of welding shall not be separated by
more than 0.6mm.
The fusion temperature, heating up pressure, bead width, heating through time,
change over time, pressure raising time, welding pressure and cooling time
shall be as per pipe manufacturer’s recommendations.
First fusion of the day performed by each crew with the same machine and
piping to be used that day shall be visually and destructively tested to confirm
joint integrity, operating procedure and fusion machine set-up.
The test shall be bent strap test in accordance with applicable standard.
The pipeline testing shall be carried out in accordance with the Standard
MHEW-5.4.5 of the "Red book"; hydro testing.
The Contractor shall prepare a written test procedure for pressure and leak
testing and shall obtain approval of the procedure from the pipe manufacturer.
The procedure shall include but not be limited to definition of test section
length, method of preparation for test, test medium, pipeline filling, method of
pressurizing and pressurizing equipment, duration of tests, acceptance criteria.
The completed pipeline shall be pressure and leak tested in accordance with the
above procedure. The tests shall be witnessed by Engineer. The tests shall be
documented by test records.
Documentation
The documentation shall include the following:
• Receiving control records
• Material certificates
• Certificates of conformance with ANSI NSF 61
• Jointing qualification procedure test records
• Jointing procedure
• Records of daily verification of jointing parameters
• Records of daily joint tests
• Jointing log
• Records of qualification of jointing personnel
• Records of qualification of NDE personnel
• Records of visual inspection
General
All components shall be suitable for service in a potable water system. The
suitability shall be certified in accordance with ANSI/NSF 61.
All piping components in ductile iron piping system shall be in accordance with
piping specification Class AD01 enclosed with this Specification.
The flanged pipes shall be ductile iron pipes Class K9 with welded flanges
PN16. Flange drilling shall be in accordance with BS EN 1092-2.
The flanged joints shall either be a joint with a rotatable flanges or a joint with
integral flanges depending on the fitting and nominal diameter.
The gasket material for flanged joints and for push-on joints shall be EPDM in
accordance with BS EN 681-1.
Internal protection
Pipes shall be internally lined with sulphate resisting cement by a high speed,
centrifugal process. The cement mortar lining shall be in accordance with ISO
4179, with the thickness given in following table:
80 - 300 4 2.5
350 - 600 5 3.5
700 - 1200 6 4.5
1400 - 2000 9 7.0
The water used in the cement mortar shall be potable, free from injurious
quantities of organic matter, alkali, salt or other impurities that might reduce
the strength, durability etc. of lining.
The cement used shall be a sulphate resisting Portland Cement meeting the
requirements of ASTM C-150 Type II, ASTM C-150 Type V, and the chemical
requirements of BS 4027.
All material used for internal linings of pipe, socket and spigot shall be non-
toxic, and certified as compatible for use in contact with potable water.
External protection
Pipes and fittings
All pipes and fittings shall have a protective polyurethane coating, of thickness
normally 900 µm but not less than 700 µm according to AFNOR NFA 48.851.
Internal socket ends and external spigot ends of pipes shall be protected with
epoxy coating of thickness no less than 300 µm.
Marking
The piping components shall be marked as follows.
• Nominal diameter
• Nominal pipe length
• Class designation of pipes
• Material
• SFC (Suitable for cutting) - pipes only
• Batch number
• Type of lining
• Manufacturer's name or trademark
• Year of manufacture
The socket and spigot pipes shall have two circumferential lines on the spigot
to provide visual means of checking that the spigot is properly inserted in the
joint
Flange gaskets
• Gasket type
• Nominal diameter
• Usage code
• Material
• Manufacturer's name or trademark
• Mould reference
• Year of manufacture
Bolting
Bolting material and grade stamped on bolt head and nut side
Transition couplings
General
A fixed coupling shall be installed at the interfaces between buried piping and
piping installations in buildings.
The coupling shall be a double flanged ductile iron pipe with puddle flange to
ensure water tightness between the pipe and the wall. The coupling shall be cast
into the concrete foundation wall.
Marking
As for ductile iron fittings.
In the event that pipes shall be cut on site it is only permitted to be carried out
on pipes supplied and marked "SFC" on the socket faces (Suitable for cutting).
The pipe socket chamber and spigot shall be cleaned with particular attention to
the gasket seat.
If the pipe spigot has not already been marked, it shall be marked at the
distance from the spigot end equal to socket depth minus 10mm.
Lubricating paste shall be applied to the exposed surface of gasket and mating
pipe spigot and chamfer.
The pipe shall be pushed into socket of mating pipe until the mark is in line
with socket face.
The selection of equipment used for jointing of socket and spigot pipes shall
ensure that no damage to the pipes will be done. The equipment shall distribute
the jointing force evenly and ensure straight movement of the pipe being
jointed.
Cutting of pipes
The cutting of pipes is permitted only on pipes designated as suitable for
cutting. Prior to cutting, it shall be verified that the new spigot cut area is within
the tolerances of the spigot.
The cutting of pipes for inserting valves, fittings or closure shall be carried out
without damage to the pipe or the protective wrapping and coating, and with a
smooth end at right angles to the axis of the pipe. The method of cutting and
equipment used for cutting shall be approved by the Engineer.
After cutting the spigot, the chamfer shall be restored to facilitate assembly and
to prevent damage to the gasket. The dimensions of chamfer shall be in
accordance with pipe manufacturer's recommendation.
Thrust blocks
The concrete thrust blocks shall be provided at pipeline ends and direction
changes to contain the hydraulic thrust of socket and spigot lines under
pressure.
In-lieu of the use of thrust blocks in highly congested areas the use of
restrained, self-anchoring joints is preferred.
The pipeline testing shall be carried out in accordance with the Standard
MHEW-5.4.5 of the "Red book"; hydro testing.
The Contractor shall prepare a written test procedure for pressure and leak
testing and shall obtain approval of the procedure from the pipe manufacturer.
The procedure shall include but not be limited to definition of test section
length, method of preparation for test, test medium, pipeline filling, method of
pressurizing and pressurizing equipment, duration of tests, acceptance criteria.
The completed pipeline shall be pressure and leak tested in accordance with the
above procedure. The tests shall be witnessed by Engineer. The tests shall be
documented by test records.
3104.5 Documentation
The documentation shall include the following.
• Material reception control records
• Material certificates
• Lubricating paste data sheet
• Certificate of hydrostatic test pressure at works
• Certificates of conformance with AISI/NSF 61
• Jointing procedures
• Pressure and leak test procedures
• Records of visual inspection
• Records of internal lining thickness control
• Records of external coating thickness control
• Drawings and calculations of thrust blocks
The standards related to earthworks associated with lying of pipes are listed in
Special Specification 200, Earthworks.
The high point vents and low point drains shall be located in concrete pits at
locations as shown on the drawings.
On the long runs of pipe, the expansion joints shall be installed as indicated on
the Drawings. The joints shall be placed in concrete pits.
The buried sections of carbon steel and HDPE shall be fully welded. Use of
flanged or other types of detachable joints on pipes in buried sections is not
permitted. If for any reason the Contractor decides that the detachable joint is
necessary, a suitable chamber or pit shall be provided with prior approval by
Engineer.
The piping materials for potable water distribution and condensate collection
networks shall be in accordance with piping specification class AP01, doc. no.
AL-905-P-11203.
The piping materials for potable water pipeline connecting to the municipal
distribution system and buried condenser water connection between cooling
towers and chiller plant building shall be in accordance with piping
specification Class AP02, Document no. AL-905-P-11204.
The piping materials for fire fighting water distribution system shall be in
accordance with piping specification Class AD01, Document no. AL-905-P-
11205.
Preparation of trenches
The preparation of trenches shall be in accordance with Clause 207 in Special
Specification 200, Earthworks.
Lying of pipelines
Before the pipes are laid they shall be carefully cleaned inside to remove any
soil, stones or other deleterious matter.
During the pipe lying of continuous fusion joint systems, allowance shall be
made for movement due to the thermal expansion/contraction of the material.
This effect is most pronounced at the end connections to fixed positions and at
branch connections.
The Contractor shall prepare the written procedures for laying of each type of
pipeline. The procedure for laying of HDPE piping shall be prepared in co-
operation with the selected HDPE pipe manufacturer. The procedures shall be
submitted to the Engineer for review and approval. The Contractor shall
include in the procedures the non-buried sections of systems and the sections
passing though concrete chambers.
The pipes shall be installed at the depth and with spacing as shown on the
drawings.
In general, the depth of soil cover over the pipelines shall be 1500mm. The
exceptions are crossings with other underground installations which may
The depth of cover less than 1500mm is permitted at branches for connections
to the buildings.
The pipes shall be laid such that the full length of the pipelines is in contact
with the bedding, which shall be 100mm thick. Pipeline invert levels shall not
deviate more than ±20mm from the level shown on longitudinal profile
drawings.
Backfilling
Upon successful completion of non destructive examination, completion of
insulation and after obtaining of final approval for pipe laying the trenches shall
be backfilled in accordance with Clause 207 in Special Specification 200,
Earthworks.
Anchorages and thrust blocks for pipes, valves and fittings in HDPE
piping network
No anchorages are required as pipes are welded or fitted to appurtenances by
means of traction resistant flanges.
Road crossing
The construction work shall be in accordance with the design drawings.
The bellows design shall consider the design pressure coincident with the full
fluid design temperature.
If two-ply construction is specified, each ply shall be designed for full fluid
design pressure and temperature.
A provision shall be made for leak detection and testing between the plies.
The cover shall not prevent the required thermal movement of the joint.
The cover shall be equipped with an indicating device to axial, lateral and
angular joint movement.
The bellows material shall be in accordance with the specification in the Data
Sheet.
All cold formed materials other than austenitic stainless steel or nickel alloy
shall be stress relieved after forming.
3106.4 Marking
The QA approved expansion joint shall be marked as follows:
• Manufacturer's mark
• Contract identification number
• Design pressure (refer to Data Sheet)
• Design factor (refer to Data Sheet)
• Allowable movements
• Allowable moments
• Material grade
• Unique joint number
• Inspection authority mark
Design
The design of pipe support up to and including 10 kN shall be in accordance
with ANSI MSS-SP58 and ANSI MSS-SP 69, and shall fulfil the requirement
from the pipe stress analysis.
For supports above 10 kN, the design shall be in accordance with appropriate
structural codes and a detailed drawing produced and issued to the Engineer for
review and approval.
The design shall include the requirements for welding and NDE into
consideration.
Support spacing
The Contractor shall determine the maximal spacing of pipe supports for each
pipe material type and pipe size for operating conditions based on the following
criteria:
The following formulae can be used for determining the maximum allowable
pipe span.
5WL4 WL2
d= * 105 S=
384 EI 8Z
where:
The modulus of elasticity and maximum allowable bending stress for HDPE
piping shall be obtained from HDPE pipe manufacturer and the results of
calculations shall be approved by the pipe manufacturer.
Piping shall be installed with sufficient spacing to allow for easy dismantling
and shall be appropriately supported with particular attention at equipment
connection points, valves etc. so that the weight shall not bear on the
connection flanges.
Liberal allowance shall be made for thermal movements of the pipes by means
of loops or inclusion of expansion joints together with appropriate supporting
of pipes.
Materials
Material for pipe supports shall be BS EN 10025 grade Fe 360.
All bolts and nuts shall be delivered and marked according to BS EN ISO 898.1
and 898.2, Class 8.8 unless otherwise approved by the Engineer.
Material and heat treatment shall be in accordance with BS EN ISO 898.1, item
4 table 2. Further, material shall be micro and low alloy types, hardened and
tempered.
All bolts, nuts and washers shall be hot dip galvanised according to
BS EN ISO 1461, and shall not be acid treated.
The diameter of washer holes shall be 1 mm larger than bolt size for bolts up to
18 mm and 1.5 mm for larger bolts.
Materials, bolts etc. for pipe supports shall be delivered with BS EN 10204,
Certificate 2.1.
Bolts shall fully penetrate nuts, but no more than 6 mm beyond the nuts on pipe
supports.
Closed hollow box sections shall be used unless otherwise approved by the
Engineer to minimize corrosion and to ease maintenance inclusive of painting.
Low friction slide units shall be made from TICO B/PT (or equal) sheet pre-
bonded to a steel backing plate, with a stainless steel slide plate on the top.
Pipe shoes shall have stainless steel plate 3 mm thick welded to the underside
of the shoe.
Pipe shoes shall rest on PTFE sliding plate permanently fixed to the top of
supporting steel.
The Contractor shall propose for the Engineer's approval the method of fixing
the PTFE plate to the steel.
Between pipe and clamps or U-bolt min. 2 mm neoprene sheet or other suitable
material shall be used.
3107.3 Manufacture
Pipe supports and items for these shall be treated according to approved surface
treatment procedure.
All parts not subject to subsequent welding shall be galvanised and painted.
Where the pipe is expected to slide, there shall be PTFE, POM or other low
friction material between the pipe and the support. This also includes horizontal
restraints.
Tolerances
Maximum allowable clearance between sliding surfaces in guided supports is 5
mm above and on both sides of the pipe.
If the clearance is larger than allowed, the slide plates must be adjusted by
inserting galvanised steel plates of the same size as the slide plate.
Slide plates in sliding supports under a pipe must always be in contact with one
another.
The Contractor shall prepare detailed design drawings and, together with
necessary calculations submit for the Engineer's review and approval. Due
consideration shall be given to earthquake (seismic) loading.
HANGER d 88.9 mm
ALT.1 GUIDED SLIDE SUPPORT d 273.3 mm ALT. 2 GUIDED SLIDE SUPPORT d 273.3 mm
SLIDE SUPPORT
Pipes passing through wall penetrations equipped with seals shall be supported
adjacent to wall penetration to prevent transfer of load to the seals.
Scope
All not corrosion resistant components shall be protected by suitable protective
coating as defined in this Section.
Classification of Areas
All external areas on structures, piping and equipment shall be classified in
accordance with Table 3000.10.2 (1).
Supervision
The Contractor shall arrange for an authorise technical representative of the
selected coating manufacturer to be in attendance at the site to advise on the
application of his company's product(s), so that the coating will conform to
both this Specification and to the coating manufacturer's requirements.
Coating
Wherever possible paint and thinner / cleaner material containing low levels of
low Volatile Organic Compounds (VOC) shall be selected.
The paints shall comply with local requirements as to the maximum allowable
VOC.
Systems
Coating systems shall be selected in accordance with Table 3000.10.2.(1) and
topcoat colours in accordance with Table 3000.10.2.(2).
The Engineer may accept alternative coating systems, but only if the
performance of the coating systems is documented with field references and by
pre-qualification test certificates.
Such certificates shall, as minimum, record results from cyclic climatic tests
and adhesion tests, as indicated below.
Thinners
Only thinners specified by the paint manufacturer shall be used.
The mixing and thinning directions given by the paint manufacturer shall be
followed.
Abrasives
Abrasives for blasting shall be grit or a mixture of grit and shot. Size of
abrasives particles for blast cleaning shall be such that the prepared surface
profile height (anchor pattern profile) is in accordance with the requirements
for the applicable coating system.
Blasting abrasives shall be dry, clean and free from contaminants, which will
be detrimental to the performance of the coating.
Compressed Air
The compressed air supply for abrasive blasting shall be free from water and
oil.
Adequate separators and trays shall be provided and these shall be emptied
regularly.
At the start of each work section or when resuming work after a natural break, a
blast of air alone shall be directed against a clean, white sheet of absorbing
paper for 15 seconds.
If any droplets or other contamination is shown, the source shall be found and
eliminated, and the test repeated until no deposits are observed.
Steel materials
Steel, subject to surface preparation on site, shall, as a minimum requirement,
be in accordance with rust-grade B according to BS EN ISO 8501-1.
They shall be removed prior the application of the coating systems unless a
separate approval from the Engineer has been obtained.
When shop primer is applied, and not removed it shall also be compatible with
the welding and approved by the paint manufacturer as compatible with the
specified paint system.
Storage
Storage of coating materials at Contractor premises before use must be in
accordance with the paint manufacturer's specifications, for example, regarding
temperature conditions.
All coating materials and solvents shall be stored in the original container
bearing the manufacturer’s label and instructions.
Each product shall have a batch number giving full traceability of production.
Application
Preparation of Surfaces
All steel shall be cleaned for weld flux, residue oil, grease and salt or any other
deleteriating substance prior to blasting by steam cleaning or with suitable
emulsion cleaner to be followed by fresh water washing and drying.
Solvent swabbing shall be used only on minor areas, using rags and copious
volumes of solvent; cleanliness of such areas shall be demonstrated by their
ability to support a continuous film of clean water.
Steel Preparation
All sharp edges and welds, which do not have a smooth ripple finish, shall be
ground to give a rounded contour corresponding to a minimum edged radius of
2 mm.
Where such defects have been revealed during blast cleaning, and dressing has
been performed, the dressed area shall be re-blasted to the specified standard.
All welds shall be inspected and if necessary repaired prior to final blast
cleaning of the area.
Surface pores, cavities etc shall be removed by suitable dressing or weld repair.
Pickling of Welds
Where low hydrogen (Alkaline) welding materials have been used, all welded
areas are to be washed off with a 5 per cent phosphoric acid and then
thoroughly rinsed with clean fresh water before any surface treatment takes
place.
Alternatively, the said welded areas shall be cleaned by high pressure clean
(potable) fresh water rinsing (10 – 20 MPa) in a two step rinsing operation.
Blast Cleaning
All steel to be dry blasted to min. Sa 2½ according to BS EN ISO 8501-1. The
anchor profile of the surface shall be Medium to Coarse (G) by ISO Surface
Profile Comparator, according to BS EN ISO 8503, unless the coating
manufacturer specifically sets stricter requirements for the specific product.
Steel to be galvanised and painted at a later date shall also be blast cleaned as
noted. Inhibitive washing to prevent rusting after blast cleaning shall not be
undertaken.
Dust, blast abrasives etc shall be removed from the surface after blast cleaning
such that the particle quantity and particle size do not exceed rating 2 according
to BS EN ISO 8502-3.
Galvanised Surfaces
On hot dip galvanised steel process salts, oil and grease shall be removed as for
degreasing. Inclusions of zinc ash in the coating as well as sharp edges, sags
and runs shall be removed by grinding.
The galvanised surface shall, prior to painting, be light grit blasted to secure an
acceptable bonding of paint.
Unpainted Surfaces
The following items shall not be coated unless otherwise specified:
• Aluminium, non-insulated stainless steel, chrome plated, nickel plated,
copper, brass, plastic or similar.
If stainless steel is connected to carbon steel, the stainless steel part shall be
coated 50 mm beyond the weld zone onto the stainless steel.
The coating for stainless steel parts shall not contain any traces of zinc.
Coating General
The coating shall be applied according to international prescribed practice and
in accordance with the manufacturer's data sheets and/or instructions.
The coating manufacturer shall provide a painting specification for each coating
system to be used, containing at least the following information for each
product:
• Surface pre-treatment requirements
• Film thickness (max., min. and specified)
• Maximum and minimum re-coating intervals at relevant temperatures.
• Information on thinners to be used (quantities and type).
• Other relevant information on application.
The Contractor shall choose contrasting colours for each individual coat in
order to ensure complete coverage of successive coats.
Colours shall always be applied in the same order so that the stage of painting
may be ascertained by the colour.
Skips, runs, sags and drips shall be avoided. Each coat shall be free from
pinholes, blisters and uncovered spots.
When this time limit is reached, the pot and other equipment shall be emptied
and cleaned, and the remaining material discarded in accordance with the laid
down Health, Safety and Environmental procedures.
Atmospheric Conditions
No coating shall be applied when the relative humidity of the air is outside the
limits given below.
No coating shall be applied during fog, mist, rain or when the surrounding air
temperature is below the paint manufacturer's specification and
recommendations, or if the steel surface temperature is less than 3 ˚Celsius
above the dew point.
Curing
Each coat shall be allowed to cure for the time specified by the paint
manufacturer.
All coating metals shall be supplied with product data sheets and quality
control certificates, and be marked with coating metal manufacturer’s name,
manufacturing standard, metal composition weight and date of manufacture.
For items which will be welded after spraying, 5-10 cm measured from the
bevel area shall be left uncoated and shall be protected by masking during
spraying.
The surface after spraying shall be uniform and free of lumps, loosely adherent
spattered metal, bubbles, ash formation, defects and uncoated spots.
Before application of any further coat, any damage to the previous coat shall be
repaired to the satisfaction of the Engineer.
The treating and handling of the substrate shall be done in such a manner that
the product in its final condition will have a continuous and uniform coating.
Before the metal spraying operation starts, the area 30-40 cm in distance from
the weld zone shall be cleaned to ensure that all contamination is removed.
Heavy duty hot dip galvanising with minimum 610 g/m2 deposit of zinc applied
in accordance with ASTM A123, A143, A153 and / or A385 is also acceptable.
The galvanised finish shall be continuous, smooth and free from flux stains,
slag and other impurities.
Repair
All damage to the coating system shall be repaired.
Repair Painting
All repair paint to be applied in accordance with Section 3109.3.2, subject to
paint manufacturer's data sheets or instructions and the Engineer's approval.
The cleaned area shall be painted with two layers of zinc rich epoxy to min.
125 micron D.F.T., or, after agreement with the Engineer, be according to the
recommendation of the paint supplier.
The surfaces shall be accessible until final inspection has been successfully
conducted.
Steel Surface
Surface cleanliness shall be estimated by comparison with the standard sheets
of BS EN ISO 8501-1 and BS EN ISO 8502-3.
If suspicion exists that the surface is oily, a thin film of clean, potable water
shall be sprayed over it.
Coating General
All coats of paint shall be inspected for coverage and general appearance.
Supervision of the painting work shall be carried out according to
BS EN ISO 12944-7 and BS EN ISO 12944-8.
Transparent areas and sags are not acceptable. Any coat shall be completed
before over-coating.
Primer
Attention shall be given to zinc dust on surfaces after spraying with zinc rich
primer.
Attention shall also be given to cracked zinc coats. Cracked coats shall to be
repaired as per the prescribed procedures.
Intercoat
Visual inspection shall be made for pinholes in the second coat when zinc rich
primer is applied.
Thickness Measurements
Thickness measurement shall be performed on zinc rich primer, where
applicable and on the completed coating system within the over-coating
interval.
Equipment
Dry film thickness shall be measured according to BS EN ISO 2808.
The measuring probe must not leave any marks on the surface.
Wet film gauges may be used only for guidance during the spraying process.
Marks left by the gauge must be repaired immediately.
During use, the calibration shall be checked in order to maintain the accuracy
valid for the gauge.
3108.5 Documentation
Daily log
A daily log shall be maintained, which as a minimum should contain:
• Air temperature, relative humidity and dew point
• Identification of area(s) to be coated
• Surface temperature at work start and stop
• Painting progress/time lapse between coats
Coating Manual
The Contractor shall prepare a "coating manual", described in
BS EN ISO 12944-8.
This manual shall describe all activities in connection with the coating work,
including repairs, and for each application, the surface preparation and the
specific coating system, sequence of colours, the selected product manufacturer
and the control procedures.
The manual shall have an approval from each product manufacturer and the
Engineer before the work commences.
Documentation of compliance
Documentation shall consist of a statement of compliance with the applicable
regulations, codes and standards and the coating manufacturer(s)'
recommendations and requirements.
The coating manual for the specific work shall be included with documentation.
Scope
The work comprises thermal insulation of the following equipment:
• All chilled water pipes and fittings within the chiller plant area
• Supports adjacent to chilled water pipes and components where
condensation may occur
• All components integrated in the chilled water piping network such as
valves, automatic air vents, expansion compensators flow measuring
devices, strainers, air and dirt separators, pipe branches for drain valves,
pressure and temperature gauges, sensors etc.
• Chilled water pump houses
• Pressurization plant where circulation of chilled water occurs
• Thermal storage tank
• All other components with risk of condensation of cold surfaces
• Stainless steel drip trays where insulation cannot be applied due to
geometry or access.
References
Thermal insulation
ASTM D1622 Standard Test Method for Apparent Density of Rigid
Cellular Plastics
ASTM E 84-07 Standard test method of surface burning characteristics
of burning materials (Flame spread rating)
BS EN ISO 1182 Reaction to fire tests for building products. Non-
combustibility test
BS EN 1604 Thermal insulating products for building applications.
Determination of dimensional stability under specified
temperature and humidity conditions
BS EN 1608 Thermal insulating products for building applications.
Determination of tensile strength parallel to faces
BS EN 1609 Thermal insulating products for building applications.
Determination of dimensional short term water
absorption by partial immersion
BS 5422 Method for specifying thermal insulating materials for
pipes, tanks, vessels, ductwork and equipment
operating within the temperature range -40°C to
+700°C
BS 5970 Code of practice for thermal insulation of pipework
and equipment in the temperature range of -100°C to
+870°
BS EN ISO 12248 Thermal insulation for buildings, equipment and
industrial installations - calculation rules
BS EN 12667 Thermal performance of building materials and
products. Determination of thermal resistance by
means of guarded hot plate and heat flow meter
General design
The insulation thickness shall be calculated in accordance with BS-EN ISO
12241, and based upon project requirements for heat loss, energy input etc.
All insulation shall be covered with weather protection designed and installed
to prevent ingress of water during normal operation throughout the design life.
Minimum free space between the flange and the nearest part of the insulation
shall be equal to the bolt length +25 mm.
All designs shall allow for necessary room for insulation and insulation jackets
and preformed boxes.
The complete insulation shall consist of the following layers starting from the
pipe or component surface outwards:
Materials
General
All insulation materials shall have a neutral pH value.
Materials shall not release toxic (see IMO Resolution A.653(16)) or corrosive
gases when exposed to fire.
Insulation material
Insulation shall be made of flexible elastomeric foam (FEF), closed cell
insulation. Alternatively insulation shall be made of rigid closed cell low
density polyisocyanurate (PIR) or polyurethane (PUR) foam pipe insulation
sections with inner diameter to match pipe outside diameter. Insulation density
to be 50 kg/m3 and 80 kg/m3 for pipe supports. All PIR and PUR insulation to
have factory applied reinforced aluminium foil laminate covering. All sections
shall be tightly fitted to the pipes or components with a suitable adhesive
approved by the manufacturer of the insulation material.
Thickness of insulation
The minimum insulation thickness for various insulation materials depending
on the pipe size shall be in accordance with doc. no. AL-000-M-10101,
'Insulation thickness calculation, Recommended insulation thicknesses for
pipes and ducts'.
Metallic jacketing: general
Metallic jacketing shall be stainless steel or aluminium-alloy.
Stainless steel sheets for pipes and vessels up to DN 450 shall have a minimum
thickness of 0.5 mm.
For dimensions above DN 450, the minimum thickness shall be 0.7 mm.
Non-metallic jacketing
Types of non-metallic jacketing shall be subject to the Engineer's approval.
When a rigid type of insulation is used, provision shall be made for longitudinal
expansion and contraction of the pipe
The evaporator water boxes and other components requiring ready access shall
be insulated with removable metal boxes lined with insulation and secured with
spring locks. The Contractor shall consult the manufacturer of the equipment to
obtain his recommendations regarding the method of equipment insulation.
Piping insulation
Surface preparation prior to insulation on piping, equipment, vessels, tanks,
valves, flanges, pipe penetration, etc. shall be according to Section 3108:
Protective coatings.
Insulation on long vertical pipe runs shall be supported with rings spaced on
3600 mm maximum centres installed on the piping. The Contractor shall
propose a ring material and fastening method for the Engineer's approval.
Tailor made jackets shall fit the actual valve/flange/equipment and secure
minimum 100 mm overlap to the incoming insulated pipe.
A gasket shall be provided on the overlap between the pipe insulation and
removable jacket.
In the choice to use jackets or boxes, close attention shall be paid to such items
as the geometry of the equipment, weather condition, mechanical impact, high
pressure washing and use of chemicals, available space and size, etc.
Jackets and insulation boxes shall posses a design that allows frequent removal
and reinstallation without being damaged.
Insulation boxes for valves and flanges etc. in vertical lines shall posses
weather protected design to prevent water ingress etc.
The locking mechanism of the tailor made jackets shall be of the flap fastener
type, with a minimum width of 50 mm.
Insulation of instruments
For insulation of instruments, insulated cabinets with hinged doors shall be
used. Instrument tubing (DN 10 mm to DN 32 mm) shall be insulated with FEF
with factory-applied non-metallic weather tight jacketing. Tubing sizes above
32 mm shall be insulated as piping.
General
Pre-insulated pipes shall be supplied already foamed and have a finished outer
protection at delivery.
Materials
The insulation material shall be self distinguishing phenol foam for the piping
to be located inside buildings, tunnels, valve pits and expansion pits.
For buried piping, the insulation material shall be CFC free PUR foam.
In addition, for the piping located inside buildings, tunnels, valve pits and
expansion pits, stainless steel jacketing shall be provided for fire protection.
Loose HDPE sleeves shall be located on casing pipes prior to carrier pipe
welding.
Upon successful completion of welding and NDE, the carrier pipe surface shall
be treated in accordance with the pre-insulated pipe manufacturer specifications
using compatible coating products.
The HDPE sleeve shall be jointed with casing pipe using melting/welding
technique.
Upon completion of the outer casing, foam shall be injected in accordance with
manufacturer's specifications and injection holes sealed.
3109.5 Installation
General
All insulation materials shall be stored in dry areas and all insulation work shall
be performed in dry conditions.
The insulation materials and the external jacketing shall be installed in such a
way that water does not enter the insulation material or between the insulation
and the pipe/equipment surface during design life.
The application of the insulation shall not commence before the mechanical
completion certificate for coating has been issued and approved by the
Engineer.
All insulation shall be installed with tightly fitted and staggered joints.
If insulation work precedes the testing of pipe work, welds and joints shall be
left un-insulated to allow inspection during testing.
Insulation on valves shall leave the packing gland accessible. Special attention
shall be given to valves on cold systems.
The vapour barrier shall be smoothly and firmly applied to the insulation such
that it forms a fully airtight layer.
On items with a complicated shape or areas with poor access and, where a the
prescribed application of the aluminium foil cannot be obtained, a layer of
mastic shall be applied on the outside of the insulation to ensure tightness of the
vapour barrier.
The sealing tape shall not be applied to elastomeric insulation until completion
of tests.
Metallic jacketing
The crimps on jacketing shall posses the minimum dimensions given in Table
3110.3.5 depending on the outside diameter (including insulation).
All jacketing seams shall be installed by "roof tile" principle and the application
of joint sealer shall be inside the jacketing.
In cases where pop rivets are used, the rivet holes shall be predrilled prior to
installation of jacketing. If pre-drilling is impossible, the length of the drilling
bit shall not exceed 6 mm.
If pop rivets are used for fixation of jacketing, a 25 mm thick protecting layer
of insulation material shall be applied outside the vapour barrier. The maximum
length of pop rivets shall be 10 mm.
Metallic jacketing for vessel insulation shall be edge crimped and overlapped
75 mm on longitudinal and circumferential seams.
On vertical piping, "S" clips shall be used to keep the jacket sheets from
sliding. Minimum four clips per seam.
Only for difficult details (e.g. bends, T-pieces etc.) pop rivets (or equivalent)
may be used.
Metallic jacketing for pipes and fittings shall be roller formed and edge
crimped at longitudinal seams.
The fuel system piping shall be marked in accordance with API/IP 1542.
Each pipeline shall be marked with the fluid designation including the degree
of hazard of the line content.
The marking shall be in both Arabic and English languages, located adjacent to
each other.
In congested areas, the spacing shall not be less than 3000 mm.
In the areas with long, straight run the spacing shall not be less
than 6000 mm.
At locations where the line is visible from both sides the marking shall be
applied on both sides of the line.
The marking shall be also applied adjacent to the valves, branches and changes
of directions, and adjacent to wall / floor penetrations.
For the group of fluids e.g. water: potable, chilled, etc. the basic identification
colour shall be applied followed by specific fluid colour code located in the
middle of basic identification colour.
3110.2 Materials
Materials used to identify piping shall be pressure sensitive adhesive backed
vinyl or equivalent as approved by the Engineer.
Identification tags showing tag numbers for valves and other individually
tagged items shall be either self-adhesive label permanently attached to the
surface, or coloured laminated plastic with engraved tag number.
Alternatively the tag numbers for individually tagged items can be stainless
steel plate with hard stamped tag number.
The method of permanent attachment of the tag number plate shall be either
stainless steel wire or pop rivets / self tapping screws if attached to non-
pressure parts e.g. outer edge of strainer cover.
The tag numbers for individually tagged items shall be allocated in accordance
with Document. no. AL-000-H-13012, 'Tag numbering of components'.
3110.3 Dimensions
The basic identification colour shall extend for 150 mm on either side of
specific identification colour.
The width of specific identification colour shall depend on the length of text to
be placed within.
The width of specific identification colour band shall be chosen in the way that
the text applied leaves sufficient area of the colour band for easy identification.
OD ≤ 60 mm 20
60 < OD ≤ 250 40
OD > 250 80
Emerald
Green White White Black
Chilled water Green
6018 9010 9010 9005
6001
Green Red Black
Fire fighting water
6018 3020 9005
Green Pink Black
Hot domestic water
6018 3014 9005
Green White Black
Potable water
6018 9010 9005
Emerald
Green Crimson Crimson Black
Condensate Green
6018 3004 3004 9005
6001
Green White Green White Black
Irrigation Water
6018 9010 6018 9010 9005
Technical water Green White Blue White Black
(Note 1) 6018 9010 5012 9010 9005
Brown Brown Black
Fuel
8002 8002 9005
Yellow Ochre Yellow Ochre Black
Sewerage
1024 1024 9005
Note 1:
Revision Log
Date Issue Description
Notes
Test Pressure (Barg): TO CODE T (ºc): 0 50 100 WELDING FACTOR (Z) 0.85 MT/PT: NA
PIPING CLASS I RT/UT: 5%
SIZE DN (inch) 1/2 3/4 1 1¼ 1½ 2 2½ 3 4 5 6 8 10 12 14 16 18 20 22 24 26 28 30 32 36 38 40 42 44 46 48
DN (mm) 15 20 25 32 40 50 65 80 100 125 150 200 250 300 350 400 450 500 550 600 650 700 750 800 900 950 1000 1050 1100 1150 1200
OD (mm) 21.3 26.7 33.4 42.2 48.3 60.3 73 88.9 114.3 141.3 168.3 219.1 273.0 323.9 355.6 406.4 457 508.0 559.0 610.0 660.0 711.0 762.0 813.0 914.0 965.2 1016.0 1067.0 1118 1168 1219.0
THK (mm) 2.77 2.87 3.38 3.56 3.68 3.91 5.16 5.49 6.02 6.55 7.11 8.18 9.27 9.53 9.53 9.53 9.53 9.53 9.53 9.53 12.7 12.7 12.7 12.7 12.7 12.8 12.9 12.10 12.11 12.12 12.7
SCH 40 40 40 40 40 40 40 40 40 40 40 40 40 - 30 30 - 20 20 20 20 20 20 20 20 - - - - - -
WEIGHT STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD XS XS XS XS XS XS XS XS XS XS XS
PIPE ASME B 36.10 M / BS EN 10216-2 Series 1 ASME B 36.10 M ASME B 36.10 M / BS EN 10217-1 Series 1
BS EN 10216-2 Series 1/ BS EN 10217-1 Series 1
SMLS SMLS or WELDED WELDED 1
ASTM A-53 GR B / BS3601 Gr. 430 ASTM A-53 GR B / BS3601 Gr. 430 ASTM A-53 GR B / BS3601 Gr. 430
FITTINGS ASME B16.11 / BS EN 10241 ASME B16.9 / BS EN 10253 ASME B16.9
SCRD, SMLS BW, SMLS OR WELDED BW, SMLS OR WELDED 7 T02
ASTM A 234 GR. WPB /
T02
BS1503 Gr. 221-460 ASTM A 234 GR. WPB / BS1503 Gr. 221-460 ASTM A 234 GR. WPB / BS1503 Gr. 221-460
OLET'S MSS SP-97 MSS SP-97
SCRD. BW
ASTM A 105 / BS1503 Gr. 221-490 ASTM A 105 / BS1503 Gr. 221-490
FLANGES EN 1092-1 Type 13 RF B1 BS EN 1092-1, Type 11, RF B1
TF RF PN 40 WN RF PN 16 6
ASTM A 105 / BS1503 Gr. 221-490 ASTM A 105 / BS1503 Gr. 221-490
GASKETS BS EN 1514-4
ELASTOMERIC SEALS
BS EN 681-1, VULCANIZED RUBBER
BOLTING EN 1515-1/2
BOLTS ASTM A 193 GR B7 / BS1506-621 Gr. A
NUTS ASTM A 194 GR 2H / BS1506-162
BALL VALVE BS ISO 7121, FULL BORE TYPE, SCRD BS ISO 7121, FULL BORE TYPE, FLANGED RF
EXTENDED SPINDLE FOR INSULATION EXTENDED SPINDLE FOR INSULATION
BODY: CS, BALL: SS316 BODY: CS, BALL: SS316
BODY SEAT: PTFE BODY SEAT: PTFE
GATE VALVE BS EN 1984, WEDGE TYPE, SCREWED
RISING STEM, OS&Y, BOLTED
BODY: CS, SEAL ELEMENT SS316
GLOBE VALVE REGULATING BS 7350
PN 16, RF, FLG, DOUBLE REGULATING TYPE
BODY:CAST IRON, SEAT: SS316, SHAFT: SS316, CONE: GUNMETAL
BALANCING
PN 16, RF, FLG, HANDWHEEL FOR PRE-SETTING, SHUTTING OFF AND MEASURING POINTS, SELF-SEALED, EXTENDED SPINDLE
BODY: CAST IRON EPOXY COATED, SPINDLE: SS, CONE: BRONZE/BRASS, SEAT: EPDM
BUTTERFLY VALVE BS EN 593 BS EN 593
NONE, USE GATE VALVES PN 16, RF, FLG, WAFER LUG TYPE PN 16, RF, DOUBLE FLANGED
SEAT EXCHANGEABLE WITH EMBEDDED STEEL SEAT EXCHANGEABLE WITH EMBEDDED STEEL
BODY: CS, SHAFT: SS316, DISK: SS316, SEAT: EPDM BODY: CS, SHAFT: SS316, DISK: SS316, SEAT: EPDM
CHECK VALVE
CL800, BALL LIFT TYPE, SCREWED PN 16, RF, FLG, WAFER SWING TYPE
BODY & BALL: SS316 BODY: SS316, DISC.: SS316, SEAL: EPDM
SAFETY VALVE BS EN ISO 4126-1
DOUBLE TYPE, FLANGED
BODY: CS
MISCELLANEOUS SLIP-ON FLANGES MAY BE USED ONLY WHERE SPACE LIMITATIONS DICTATE.
FLAT-FACE FLANGES MAY BE USED ONLY TO MATCH EQUIPMENT.
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11200 T02 LFJ/ PZ/ KWM/ NIER
Development of Muscat and Salalah International Airports Scale Date 15.03.2008
BRANCH CHART
BRANCH SIZE 2, 3
15 20 25 32 40 50 65 80 100 125 150 200 250 300 350 400 450 500 550 600 650 700 750 800 900 950 1000 1050 1100 1150 1200
15 TET
20 TRT TET
25 TRT TRT TET
32 TRT TRT TRT TET
40 TRT TRT TRT TRT TET
50 TL TL TL TL RT T
65 TL TL TL TL RT RT T
80 TL TL TL TL TL RT RT T
100 TL TL TL TL TL RT RT RT T
150 TL TL TL TL TL W RT RT RT T T
200 TL TL TL TL TL W W W RT RT RT T
250 TL TL TL TL TL W W W RT RT RT RT T
HEADER SIZE
300 TL TL TL TL TL W W W W W RT RT RT T
350 TL TL TL TL TL W W W W W RT RT RT RT T
400 TL TL TL TL TL W W W W W RT RT RT RT RT T
450 TL TL TL TL TL W W W W W W RT RT RT RT RT T
500 TL TL TL TL TL W W W W W W RT RT RT RT RT RT T
550 TL TL TL TL TL W W W W W W W RT RT RT RT RT RT T
600 TL TL TL TL TL W W W W W W W RT RT RT RT RT RT RT T
650 TL TL TL TL TL W W W W W W W W RT RT RT RT RT RT RT T
700 TL TL TL TL TL W W W W W W W W RT RT RT RT RT RT RT RT T
750 TL TL TL TL TL W W W W W W W W RT RT RT RT RT RT RT RT RT T
800 TL TL TL TL TL W W W W W W W W W RT RT RT RT RT RT RT RT RT T
900 TL TL TL TL TL W W W W W W W W W W RT RT RT RT RT RT RT RT RT T
950 TL TL TL TL TL W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT T
1000 TL TL TL TL TL W W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT T
1050 TL TL TL TL TL W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT RT RT T
1100 TL TL TL TL TL W W W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT RT T
1150 TL TL TL TL TL W W W W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT RT T
1200 TL TL TL TL TL W W W W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT RT RT T
LEGEND: SCH = SCHEDULE FLG = FLANGED T = BUTT WELD EQUAL TEE TRT = THREADED REDUCING TEE
SMLS = SEAMLESS WN = WELD-NECK FLANGE RT = BUTT WELD REDUCING TEE TET = THREADED EQUAL TEE
SCRD = SCREWED RF = RAISED FACE W = WELDOLET/WELDOFLANGE RP = REINFORCING PAD
BW = BUTT WELD SO = SLIP-ON FLANGE TL = THREDOLET TF = THREADED FLANGE
T02
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11200 T02 LFJ/ PZ/ KWM/ NIER
Development of Muscat and Salalah International Airports Scale Date 15.03.2008
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11201 T02 PZ/ NHA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale N.A. Date 15.03.2008
MISCELLANEOUS
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11201 T02 PZ/ NHA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale N.A. Date 15.03.2008
450 W W W W W RT RT RT RT RT T T02
500 W W W W W RT RT RT RT RT RT T
550 W W W W W W RT RT RT RT RT RT T
600 W W W W W W RT RT RT RT RT RT T T
650 W W W W W W W RT RT RT RT RT RT RT T
700 W W W W W W W RT RT RT RT RT RT RT T T
750 W W W W W W W RT RT RT RT RT RT RT RT RT T
800 W W W W W W W RT RT RT RT RT RT RT RT RT RT T
850 W W W W W W W W W RT RT RT RT RT RT RT RT RT T
900 W W W W W W W W W RT RT RT RT RT RT RT RT RT T T
950 W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT T
1000 W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT RT T
1050 W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT RT RT T
1100 W W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT RT RT T
1150 W W W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT RT RT T
1200 W W W W W W W W W W W W RT RT RT RT RT RT RT RT RT RT RT RT RT T
LEGEND: SCH= SCHEDULE FLG = FLANGED T = BUTT WELD EQUAL TEE VT = VISUAL EXAMINATION
SMLS
= SEAMLESS WN = WELD-NECK FLANGE RT = BUTT WELD REDUCING TEE MT = MAGNETIC PARTICLE EXAMINATION
SW = SOCKET WELD RF = RAISED FACE W = WELDOLET/WELDOFLANGE PT = DYE PENETRANT EXAMINATION
SCRD
= SCREWED SO = SLIP-ON FLANGE S = SOCKOLET RT = RADIOGRAPHIC EXAMINATION (X-RAY)
BW = BUTT WELD TF = THREADED FLANGE ST = SOCKET WELD EQUAL TEE UT = ULTRASONIC EXAMINATION
TH = THREDOLET RST = SOCKET WELD REDUCING TEE
RP = REINFORCING PAD
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11201 T02 PZ/ NHA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale N.A. Date 15.03.2008
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11202 T01 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale Date Date 15.03.2008
BALL VALVE PN 16, SCRD, FULL PORT, BOLTED BODY PN 16, FF, FULL PORT, BOLTED BODY, LONG PATTERN
BRONZE BODY AL-BRONZE
PTFE SEATS REDUCED PORT
PTFE SEATS
GATE VALVE PN 16, SCRD, BODY LEADED GUNMETAL BS1400-LG2 or AB2
SOLID WEDGE, UNION BONNET, TRIM AS BODY OR MONEL NONE
PACKING PURE MINERAL GRAPHITE, HANDWHEEL OPERATED
GLOBE VALVE PN 16, SCRD, BRONZE
UNION BONNET, METAL SEAT NONE
PACKING PURE MINERAL GRAPHITE, HANDWHEEL OPERATED
BUTTERFLY VALVE PN 16, FF, LUGGED BODY, TAPPED LUGS
NONE, USE GATE VALVES LINED BODY ASTM A216 Gr. WCB, LINING: EPDM, NEOPRENE, BUNA-N, EBONITE; DISK ASTM B381 Gr. F2
SHAFT & PINS ASTM B381 Gr. F2, PACKING PTFE 7 GRAPHITE
CHECK VALVE CLASS 800, SCRD, BRONZE, HORIZONTAL LIFT PN 16, FF, BODY & PLATE BS 1400 AB2
SCREWED CAP, MONEL DISK WAFER TYPE, DUO-CHECK,
SPRING UNS N07750 MONEL TRIM
SAFETY VALVE CONVENTIONAL TYPE, FLANGED FF, BODY AL-BRONZE
NONE OPEN LEVER
SPRING: MONEL, O-RING: VITON,
MISCELLANEOUS ALL GALVANIZED ITEMS TO BE HOT DIPPED TO BS/EN/ISO 1461 OR EQUAL. PIPE SIZES DN 80 (3") AND LARGER TO BE GALVANIZED AFTER FABRICATION.
WELDING ATTACHMENTS AFTER GALVANIZING NOT PERMITTED.
MATERIAL FOR O-LETS TO BE AS FOR FLANGES
2000# SCRD FITTINGS CAN BE SUBSTITUTED BY 3000#
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11202 T01 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale Date Date 15.03.2008
65 TL TL TL TL RT T
80 TL TL TL TL RT RT T
100 TL TL TL TL RT RT RT T
125 TL TL TL TL RT RT RT RT T
150 TL TL TL TL W RT RT RT RT T
200 TL TL TL TL W W W RT RT RT T
250 TL TL TL TL W W W RT RT RT RT T
300 TL TL TL TL W W RT RT RT RT RT RT T
350 TL TL TL TL W W W RT RT RT RT RT RT T
400 TL TL TL TL W W W RT RT RT RT RT RT RT T
NOTES: 1. FOR DETAILS OF STANDARD REINFORCING PAD TYPE BRANCHES, SEE DESIGN STANDARD.
2. PRIORITY: T, W, RP
3. MATERIAL GRADES CAN BE SUBSTITUTED BY APPROVED EQUIVALENTS.
4. ALL MATERIALS SHALL BE UL LISTED FOR COMPLIANCE WITH ANSI/NSF 61 FOR USE IN POTABLE WATER SYSTEM
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11202 T01 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale Date Date 15.03.2008
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11203 T03 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale Date Date 15.03.2008
03.11.2008 T03 Issued for Tender, reference deleted, design code updated, service updated
15.10.2008 T02 Issued for Tender, Ref. Addendum 3.
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AP01
RATING: PN16 PRESS/TEMP RATINGS.: DESIGN CODE: BS 7159 EXTENT OF NDT: NOTES
T (ºC): 0 40 CORR. ALLOWANCE: NIL Visual Examination 100%
TEST PRESSURE (Barg): According to Code P (Barg): 16 11.8 Ultrasonic Examination 100%
SIZE DN/OD (mm) 50 63 75 90 110 125 140 160 180 200 225 250 280 315 355 400 450
Min. ID (mm) 39.6 50 59.8 71.6 87.8 99.6 111.8 127.6 143.6 159.6 179.6 199.8 223.8 251.8 283.8 319.8 349.8
Max. ID (mm) 40.8 51.4 61.4 73.6 90.0 102.2 114.6 130.8 147.2 163.6 184 204.6 229.2 257.8 290.6 327.4 359.2
Min. THK (mm) 4.6 5.8 6.8 8.2 10.0 11.4 12.7 14.6 16.4 18.2 20.5 22.7 25.4 28.6 32.2 36.3 45.4
Max. THK (mm) 5.2 6.5 7.6 9.2 11.1 12.7 14.1 16.2 18.2 20.2 22.7 25.1 28.1 31.6 35.6 40.1 50.1
PIPE HDPE Class PE 100 in accordance with BS EN 12201-1 1
Formulated with carbon black and ultraviolet stabilizer for maximum protection against UV rays.
Dimensions SD11 in accordance with BS EN 12201-2 Table 2
FITTINGS Molded, integrally reinforced 1
FLANGES HDPE MOLDED, STUB-END HEAT FUSION JOINING COMPLETE WITH GALVANIZED CARBON STEEL BACKING FLANGE 1, 4
BACKING FLANGE DRILLING PATTERN ACC. TO BS EN 1902-1, PN 16, INTERNAL DIAMETER ACC. TO ISO 9624
BACKING FLANGE ALL ROUGH EDGES ROUNDED, I.D. RADIUS TO MATCH STUB-END SHOULDER RADIUS
MECHANICAL JOINTS 1
VICTAULIC STYLE 995 DESIGNED FOR HDPE SD11 PIPE, with grade "E" EPDM GASKETS
GASKETS BS EN 1514-4 1
ELASTOMERIC SEALS
BS EN 681-1, VULCANIZED RUBBER
TRANSITION FITTINGS WITH ADAPTER, O-RINGS AND RETAINER RING
METALLIC PARTS SS 316L
BOLTING EN 1515-1/2
BOLTS ASTM A 193 GR B7 / BS1506-621 Gr. A
NUTS ASTM A 194 GR 2H / BS1506-162
MISCELLANEOUS
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11203 T03 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale Date Date 15.03.2008
03.11.2008 T03 Issued for Tender, reference deleted
15.10.2008 T02 Issued for Tender, Ref. Addendum 3.
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AP01
BRANCH CHART
BRANCH SIZE 1, 2
50 63 75 90 110 125 140 160 180 200 225 250 280 315 355 400 450
50 T
63 R T
75 R R T
90 R R R T
110 R R R R T
125 R R R R R T
HEADER SIZE
140 R R R R R R T
160 R R R R R R R T
180 R R R R R R R R T
200 R R R R R R R R R T
225 R R R R R R R R R R T
250 R R R R R R R R R R R T
280 R R R R R R R R R R R R T
315 R R R R R R R R R R R R R T
355 R R R R R R R R R R R R R R T
450 R R R R R R R R R R R R R R R T
450 R R R R R R R R R R R R R R R R T
LEGEND:
T Equal Tee
R Tee with Butt Weld Reducer or Reducing Tee
NOTES: 1. All components in contact with medium shall be UL classified in accordance with ANSI / NSF 61 for Potable Water Service
2. The actual comfiguration of branch connections will depend on manufacturing programme of selected HDPE pipe supplier
3. For detailed specification of valves refer to relevant data sheet
4. Customized flange adaptors or spacers shall be used in conjunction with butterfly valve installation.
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11203 T03 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale Date Date 15.03.2008
03.11.2008 T03 Issued for Tender, reference deleted
15.10.2008 T02 Issued for Tender, Ref. Addendum 3.
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AP01
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11204 T03 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale Date Date 15.03.2008
03.11.2008 T03 Issued for Tender, references deleted, design code updated, service updated
15.10.2008 T02 Issued for Tender, Ref. Addendum 3
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AP02
MATERIAL: High Density Polyethylene SERVICE: Potable Water. Buried Condenser Water, Buried Condensate, DOCUMENTATION: REV.
CERTIFICATE: 3.1 EN 10204
RATING: PN10 PRESS/TEMP RATINGS.: DESIGN CODE: BS 7159 EXTENT OF NDT: NOTES
T (ºC): 20 40 CORR. ALLOWANCE: NIL Visual Examination 100%
TEST PRESSURE (Barg): According to Code P (Barg): 10 7.4 T03 Ultrasonic Examination 100%
SIZE DN/OD (mm) 50 63 75 90 110 125 140 160 180 200 225 250 280 315 355 400 450
Min. ID (mm) 43.2 54.4 64.8 77.8 95.2 108.4 121.4 138.8 156.2 173.6 195.2 217.2 243.2 273.6 308.2 347.6 391
Max. ID (mm) 44 55.4 66 79.2 96.8 110.2 123.4 141 158.6 176.2 198.2 220.4 246.8 277.6 312.8 352.6 396.6
Min. THK (mm) 3.0 3.8 4.5 5.4 6.6 7.4 8.3 9.5 10.7 11.9 13.4 14.8 16.6 18.7 21.1 23.7 26.7
Max. THK (mm) 3.4 4.3 5.1 6.1 7.4 8.3 9.3 10.6 11.9 13.2 14.9 16.4 18.4 20.7 23.4 26.2 29.5
PIPE HDPE Class PE 100 in accordance with BS EN 12201-1 1
Formulated with carbon black and ultraviolet stabilizer for maximum protection against UV rays.
Dimensions SD17 in accordance with BS EN 12201-2 Table 2
FITTINGS Molded, integrally reinforced 1
FLANGES HDPE MOLDED, STUB-END HEAT FUSION JOINING COMPLETE WITH GALVANIZED CARBON STEEL BACKING FLANGE 1, 4
BACKING FLANGE DRILLING PATTERN ACC. TO BS EN 1902-1, PN 16, INTERNAL DIAMETER ACC. TO ISO 9624
BACKING FLANGE ALL ROUGH EDGES ROUNDED, I.D. RADIUS TO MATCH STUB-END SHOULDER RADIUS
MECHANICAL JOINTS 1
VICTAULIC STYLE 995 DESIGNED FOR HDPE SD11 PIPE, with grade "E" EPDM GASKETS
GASKETS BS EN 1514-4 1
ELASTOMERIC SEALS
BS EN 681-1, VULCANIZED RUBBER
TRANSITION FITTINGS WITH ADAPTER, O-RINGS AND RETAINER RING
METALLIC PARTS SS 316L
BOLTING EN 1515-1/2
BOLTS ASTM A 193 GR B7 / BS1506-621 Gr. A
NUTS ASTM A 194 GR 2H / BS1506-162
T03
BUTTERFLY VALVE PN10, RF, LUGGED BODY, TAPPED LUGS 1
NONE, USE BALL BODY A351 Gr. CF8M / A182 Gr. F316/F316L, DISK SS316
SHAFT & PINS SS 17-4 PH, SEAT INCONEL, PACKING PTFE
CHECK VALVE CLASS 800#, SCRD, PN10, RF, 1
BODY A182 Gr. F316/F316L BODY A351 Gr. CF8M, SWING TYPE
RENEWABLE SEATS, RENEWABLE SEATS, BOLTED COVER
BALL LIFT TYPE DISC SS316
SCREWED COVER HARDFACED
SPRING UNS N07750
SAFETY VALVE CONVENTIONAL TYPE, FLANGED FF, STAINLESS STEEL 316(L) 1
OPEN LEVER
SPRING: MONEL, O-RING: VITON,
MISCELLANEOUS
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11204 T03 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale Date Date 15.03.2008
03.11.2008 T03 Issued for Tender, reference deleted
15.10.2008 T02 Issued for Tender, Ref. Addendum 3
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AP02
BRANCH CHART
BRANCH SIZE 1, 2
50 63 75 90 110 125 140 160 180 200 225 250 280 315 355 400 450
50 T
63 R T
75 R R T
90 R R R T
110 R R R R T
125 R R R R R T
HEADER SIZE
140 R R R R R R T
160 R R R R R R R T
180 R R R R R R R R T
200 R R R R R R R R R T
225 R R R R R R R R R R T
250 R R R R R R R R R R R T
280 R R R R R R R R R R R R T
315 R R R R R R R R R R R R R T
355 R R R R R R R R R R R R R R T
450 R R R R R R R R R R R R R R R T
450 R R R R R R R R R R R R R R R R T
LEGEND:
T Equal Tee
R Tee with Butt Weld Reducer or Reducing Tee
NOTES: 1. All components in contact with medium shall be UL classified in accordance with ANSI / NSF 61 for Potable Water Service
2. The actual comfiguration of branch connections will depend on manufacturing programme of selected HDPE pipe supplier
3. For detailed specification of valves refer to relevant data sheet
4. Customized flange adaptors or spacers shall be used in conjunction with butterfly valve installation.
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11204 T03 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Scale Date Date 15.03.2008
03.11.2008 T03 Issued for Tender, reference deleted
15.10.2008 T02 Issued for Tender, Ref. Addendum 3
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AP02
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11205 T03 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Date
11.01.2009 T03 Issued for Tender, Revised as indicated
20.10.2008 T02 Issued for Tender, Revised as indicated
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AD01
MATERIAL: Ductile Iron SERVICE: BURIED FIREWATER SYSTEM DOCUMENTATION: REV.
CERTIFICATE: EN 10204 3.1
RATING: PN 16 PRESS/TEMP RATINGS.: EN 1092-2 DESIGN CODE: BS EN 545 EXTENT OF NDT: NOTES
T0 P (Barg): 16 16 16 CORR. ALLOWANCE: N.A. Works pressure test 100%
TEST PRESSURE (Barg): acc. to BS EN 545 T (ºC): 0 50 100 TOLERANCES BS EN 545
SIZE DN (mm) 80 100 125 150 200 250 300 350 400 450 500 600 700 800 900
OD (mm) 98.0 118 144 170 222 274 326 378 429 480 532 635 738 842 945
ID (mm) 86 106 132 158 209.4 260.4 311.6 362.6 412.8 462.8 514 615.2 716.4 818.6 919.8
THK (mm) 6.0 6.0 6.0 6.0 6.3 6.8 7.2 7.7 8.1 8.6 9.0 9.9 10.8 11.7 12.6 1
PIPE Centrifugally cast socket and spigot pipes or flanged pipes in accordance with BS EN 545. Nominal length 6 metres..
Material: Spheroidal Graphite Iron BS EN 545 grade 420-5
Pipe wall thickness Class: K9
Internal lining: Cement mortar, External coating: Polyurethane 900µm (min. 700µm), Socket & spigot: Epoxy coating 300µm.
FITTINGS Sand cast in accordance with BS EN 545
Socketed or flanged, Series A Fitting wall thickness Class: K12
Material: Spheroidal Graphite Iron BS EN 545 grade 420-5
Internal lining: Works applied Cement mortar, External coating: Works applied Metallic zinc + bituminous paint+ Field applied polymeric film to BS 6076
FLANGES EN 1092-2, TYPE 11 EN 1092-2, TYPE 11
PN 40, RF PN 25, RF 2
Rotatable, integrally Rotatable, integrally
cast or welded cast or welded
GASKETS BS EN 1514-1
ELASTOMERIC SEALS
BS EN 681-1, VULCANIZED RUBBER
BOLTING EN 1515-1/2
Bolts ASTM A 193 Gr B8M / BS 1506-845
Nuts ASTM A194 Gr 8M / BS 1506-845
MISCELLANEOUS
USE OF MECHANICAL, SELF-RESTRAINED, JOINTS IS SUBJECT TO PRIOR APPROVAL BY ENGINEER.
POLYETHYLENE SLEEVING IN ACCORDANCE WITH BS 6076 SHALL BE APPLIED ON BURIED MECHANICAL JOINTS DURING PIPE LYING
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11205 T03 PZ/ JKA/ KWM/ NIER/
Development of Muscat and Salalah International Airports Date
11.01.2009 T03 Issued for Tender, Revised as indicated
20.10.2008 T02 iIssued for Tender, Revised as indicated
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AD01
BRANCH CHART
BRANCH SIZE
80 100 125 150 200 250 300 350 400 450 500 600 700 800 900
80 T
100 RT T
125 RT RT T
150 RT RT RT T
200 RT RT RT RT T
H EA D E R S IZ E
250 RT RT RT RT RT T 3, 4
300 W RT RT RT RT RT T
350 RTF RTF RTF RTF RTF RTF RTF T
400 RTF RTF RTF RTF RTF RTF RTF RTF T
450 W RTF RTF RTF RTF RTF RTF RTF RTF T
500 W RTF RTF RTF RTF RTF RTF RTF RTF RTF T
600 W W W W RTF RTF RTF RTF RTF RTF RTF T
700 W W W W RTF RTF RTF RTF RTF RTF RTF RTF T
800 W W W W RTF RTF RTF RTF RTF RTF RTF RTF RTF T
900 W W W W RTF RTF RTF RTF RTF RTF RTF RTF RTF RTF T
NOTES: 1. Pipe wall thickness in accordance with BS EN 545. The thickness may vary depending on manufacturer.
2. DELETED
3. Branch chart is based on BS EN 545. Availability of components may vary depending on manufacturer.
4. Double socket reducing tee with flanged branch may be substituted by all-flanged tee.
5. Different lengths of pipe shall be selected to suit pipeline curvature.
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11206 T03 PZ/ JMJ/ KWM NIER
Development of Muscat and Salalah International Airports Scale Date Date Date
31.01.2009 T03 Issued for Tender, Revised as indicated
15.10.2008 T02 Issued for Tender, Ref. Addendum 3. Revised as marked
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AC03 Sht 1 of 3
INTERNAL LINING SHALL BE IN ACCORDANCE WITH SPECIAL SPECIFICATION 3600 FUEL HYDRANT SYSTEMS, Clause 3608.1 T03
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11206 T03 PZ/ JMJ/ KWM NIER
Development of Muscat and Salalah International Airports Scale Date Date Date
31.01.2009 T03 Issued for Tender, Revised as indicated
15.10.2008 T02 Issued for Tender, Ref. Addendum 3. Revised as marked
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AC03 Sht 2 of 3
BRANCH CHART
BRANCH SIZE 1, 2
15 20 25 40 50 65 80 100 150 200 250 300 350 400 450 500 600
15 ST
20 RST ST
25 RST RST ST
40 RST RST RST ST
50 S S S RT T
65 S S S RT RT T
HEADER SIZE
80 S S S S RT RT T
100 S S S S RT RT RT T
150 S S S S W RT RT RT T
200 S S S S W W W RT RT T
250 S S S S W W W RT RT RT T
300 S S S S W W W W RT RT RT T
350 S S S S W W W W RT RT RT RT T
400 S S S S W W W W RT RT RT RT RT T
450 S S S S W W W W W RT RT RT RT RT T
500 S S S S W W W W W RT RT RT RT RT RT T
600 S S S S W W W W W W RT RT RT RT RT RT T
NOTES: 1. FOR DETAILS OF STANDARD REINFORCING PAD TYPE BRANCHES, SEE DESIGN STANDARD.
2. PRIORITY: T, W, RP
3. MATERIAL GRADES CAN BE SUBSTITUTED BY APPROVED EQUIVALENTS.
.
Sultanate of Oman Document no. Rev.: Originator Checked Approved Approved
Ministry of Transport & Communication AL-905-R-11206 T03 PZ/ JMJ/ KWM NIER
Development of Muscat and Salalah International Airports Scale Date Date Date
31.01.2009 T03 Issued for Tender, Revised as indicated
15.10.2008 T02 Issued for Tender, Ref. Addendum 3. Revised as marked
01.08.2008 T01 Issued for Tender
Date Revision Description Prepared Checked Approved Approved
Equipment & Utilities Piping Class Specification PIPING CLASS: AC03 Sht 3 of 3
T03
Note: For details of drains and vents in Fuel Hydrant network pits refer to drawing SE-986-LNL-P-60504
.
Main Contract 5, Project Specification
Civil Works - 3100 Piping Installations, Common Requirements
Special Specification
Client Project
Designation-grade Group No. Ceqv. max. Designation-grade Group No. Ceqv. max.
to
Plate-pipe Thickness range mm Plate-pipe Thickness range mm
to
Pipe diameter range Other
Tacking
Joint details and welding sequence (sketch)
Position
Other data
P: Flux T: shielding
Run Welding E: Electrode Diameter P: Scale Nozzle gas
No. process -Length E: Type
Ø
Manufacture and trade mark mm l/min mm l/min No.
/
/
/
/
/
/
/
Current
Note
Wire speed Travel speed mm/min. Weaving, run width max. Other data
Run Programme AC Range or run-out length
No. No. DC Range Range Heat input
Pol. Amp. m/min Volt mm mm KJ/mm No.
Special requirements
Standard
P: Flux T: shielding
Run Welding E: Electrode Diameter P: Scale Nozzle gas
No. process -Length E: Type
Ø
Manufacture and trade mark mm l/min mm l/min No.
/
/
/
/
/
/
/
/
/
/
Current
Other data Note
Wire speed Travel speed mm/min. Weaving, run width max.
Run Programme AC Range or run-out length Heat input
No. No. DC Range Range Range Range
Pol. Amp. m/min Volt mm mm KJ/mm No.
Date
Supplementary information 2/
Sheet
Page 1/2
Welding parameters continued
G: Gas Dimension Classification H2 Gas
T: Wire G: Back Note
Standard
P: Flux T: shielding
Run Welding E: Electrode Diameter P: Scale Nozzle gas
No. process -Length E: Type
Ø
Manufacture and trade mark mm l/min mm l/min No.
/
/
/
/
/
/
/
/
/
/
Program Current Stringer
no. Preheat Note
Travel speed mm/min. Weaving, run width max. /
Run Programme AC Wire or run-out length Interpass-
No. No. DC speed Heat input temp. °C
Pol. Amp. m/min Volt mm mm KJ/mm No.
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
Notes - other information
and heat treated according to the above specified standard/code and/or client's specification.
Place Date
Test results and approvals; See enclosed page/reverse side, sheet No.
6. Other or supplementary tests Sheet Side/Page
WPQR No. 2/ 2/2
Type
Designation-grade Group No. Ceqv. actual Designation-grade Group No. Ceqv. actual
to
Plate-pipe WT mm Dia. mm Plate-pipe WT mm Dia. mm
to
Joint details and welding sequence (sketch) Tacking
Length
°C
No of runs
mm
Position
Other data
Electrode dia.
°C
Air pressure
mm
bar
2nd Side Grinding
Welding position
Yes No
G: Gas Dimension Classification H2 Gas
T: Wire G: Back Note
Standard
P: Flux T: shielding
Run Welding E: Electrode Diameter P: Scale Nozzle gas
No. process -Length E: Type
Ø
Manufacture and trade mark mm l/min mm l/min No.
/
/
/
/
/
/
/
Current Stringer
Preheat Note
Travel speed mm/min. Weaving, run width max. /
Run Programme AC Wire or run-out length Interpass-
No. No. DC speed Heat input temp. °C
Pol. Amp. m/min Volt mm mm KJ/mm No.
/
/
/
/
/
/
/
No. 1
and heat treated according to the above specified standard/code and/or client's specification.
Place Date
Test results and approvals; See enclosed page 2/2 - reverse side
NON-DESTRUCTIVE EXAMINATION WPQR No. Revision No. Sheet Side/Page
1/ 2/2
1. Visual examination Procedure standard:
Result: according to:
2. Radiographic examination Procedure standard:
Result: according to:
3. Ultrasonic examination Procedure standard:
Result: according to:
4. Magnetic particle testing Procedure standard:
Result: according to:
5. Dye penetrant testing Procedure standard:
Result: according to:
6. Other examination Type:
Procedure:
Result: according to:
Test No. Loc. Result Test No. Loc. Result Test No. Loc. Result Test No. Loc. Result Test No. Loc. Result Test No. Loc. Result
Sketch showing indentations Base mat. HAZ Weld metal HAZ Base mat.
6. Other/Supplementary Tests:
Further enclosures: No Yes - Specify:
We hereby approve this welding procedure for welding on said project within the Place Date
Reg. No. Enclosure No. id./ order No. Report No. Page of
V
Your order No. Period of examination/Date Technician (Init.) Certificate No. Assistant (Init.) Certificate No.
Client Contractor
Employer Location
Client Contractor
Employer Location
Results of examination
Client Contractor
Employer Location
EN 12517 cl. EN 30042 class ASME VIII Div 1. Other: Extent Exa. %
Seam Tube Tube Tech- Exp. Mat. dim. Predominant IIW Rep. on
Film No. Box No. pos. No. row
Welders nique data Parent met.
SVW defects degree
Defects/Debris Debris Extra film No.
Weld No. Film location mark A-E I-V -Weld mm 2) 3) 4) Acc. Reject location 5) for 6)
1) Acc. to EN 584-1 films are classified in 6 classes: (previously ISO 5579, 4 classes)
C1 / G I C2 / G I C3 / G I C4 / G II C5 / G III C6 / G III G IV
E.g.: E.g.: E.g.: E.g.: E.g.: E.g.:
AGFA D2 AGFA D3 AGFA D4 AGFA D5 AGFA D7 AGFA D8 Large grain size,
Very fine-grained, very slow films Fine grained, slow films Medium grain size, medium speed films high speed films
4) IIW’s reference atlas for steel weldings 1954 - 1973. The classification system has the following 5 degrees:
Client Contractor
Employer Location
t1 =
t2 =
t3 = Weld
t4 =
Position 1 2 3 4 5 6 7 8 9 10 Position 11 12 13 14 15 16
Probe Probe
Extent of examination
Result of examination
Date of
Document no. Document title Scale Current rev. current rev.
C:\61400\Data sheets\Salalah\
AL_905_P_11061 Spec 3100 DS list Rev T02
2/3
Development of Muscat and Salalah International Airports
AL-905-P - 11252 Data sheet
Potable water small bore stainless steel globe valve
N.A. T01 01.08.2008
C:\61400\Data sheets\Salalah\
AL_905_P_11061 Spec 3100 DS list Rev T02
3/3
Development of Muscat and Salalah International Airports
AL-905-P - 11270 Data sheet
Pressure transmitter
N.A. T01 01.08.2008
C:\61400\Data sheets\Salalah\
AL_905_P_11061 Spec 3100 DS list Rev T02
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11240 Sht 1 of 3
Communications Piping Class: AC01 & AC02
DATA SHEET
Development of Muscat & Salalah International Airports LUG STYLE BUTTERFLY VALVE
REQ./P.O. NO.
CONTRACT NO.
T01 Issed for Tender 01.08.2008 PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR*D APPR*D COUNTRY OF ORIGIN *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
VALVE
5 SERVICE (Located at) GENERAL
6 TYPE CS BUTTERFLY VALVE
7
8
9 DESIGN BS EN 593
10 FLUID (Type and phase) WATER,
11 BODY SIZE RANGE / RATING DN50-DN600, PN 16
12 PRESSURE barg 12.5
13 TEMPERATURE °C -10 / 75
14 STANDARDS / CODES ASME B16.34, BS EN 12266
15 OPERATION See page 3, note 14
16 DIMENSIONAL STANDARD BS EN 558-1 / ASME B16.10 T9, C 3 & 4
17 ENDS BS EN 1092-1 Type 11, RF B1
18 BODY Fully Lugged, Lugs tapped ISO 261/262
19 STEM ANTI-BLOW-OUT PROOF
20 MATERIAL
21 BODY Note 1 (yes/no) ASTM A216 Gr WCB / BS 1504-161 Gr. 480 No
22 DISC ASTM A182 Gr. F316L / BS 1503 316 S11
23 STEM ASTM A182 Gr. F316L / BS 1503 316 S11
24 SEAL RETAIN RING ASTM A182 Gr. F316L / BS 1503 316 S11
25 STEM SEALS GRAPHITE
26 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
27 LINING MATERIAL NOT APPLICABLE
SUPPLEMENTARY REQUIREMENTS:
28 PROTECTION
29 FIRE SAFE BS EN ISO 12266 Yes (yes/no)
30 ANTI STATIC DEVICE (BS 5146) Yes (yes/no)
31 NON DESTRUCTIVE TESTING (NDE) Yes (yes/no)
32 PRESSURE RETAINING PARTS Yes (yes/no)
BS EN 12266-1
33 NDE PROCEDURE *)
34 ACCEPTANCE CODE SEE TABLE 2
35 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
Yes, Body: 18,8 barg, Seats 6 barg. Soft seated min. 15 minutes up to DN300
36 HYDROSTATIC TEST (as per BS EN 12266) (yes/no)
30 minutes DN350 and larger
37 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
38 FUNCTIONAL TEST WITH ACTUATOR (yes/no) Yes
39 PAINTING (yes/no) Yes See page 3.
40 INSPECTION LEVEL 2, (Note 2, 4)
CERTIFICATION:
41 PRESSURE CONTAINING PARTS EN 10204 3.1, Note 1 Traceability Level 1
42 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
43 PRESSURE TEST Test certificate
44 FIRE TEST TO BS EN 12266 Test certificate
45 DOUBLE BLOCK AND BLEED TEST N/A
46 FUNCTIONAL TEST WITH ACTUATOR Test certificate
47 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
48 TOTAL VALVE SUPPLY Statement of Compliance, Note 2, 4
Notes: 1. For valves of welded construction, the following additional requirements applies:
- Carbon equivalent shall be determined according to: CE=C+Mn/6+0,04 or CE=C+Mn/6+(Cr+Mo+V)/5+(Cu+Ni)/15
- NDE on welds and welding acc. to Code.
- Welding procedure qualification records and NDE records for welds to be incl. in documentation.
2. Inspection Level 1 for rating >PN20 and Inspection Level 2 for rating ≤PN20
3. Material certificate EN 10204 3.1
4. For Inspection Level 1 valves, Inspection during fabrication, Release Note shall be issued by Certifying Agency.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11240_Lug_style_Butterfly_valve Rev.T01.xls]Lined butterfly valve
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11240 Sht 2 of 3
DATA SHEET
Development of Muscat & Salalah International Airports LUG STYLE BUTTERFLY VALVE
49 Table 1: INSPECTION LEVELS
Radiographic and/or Magnetic Particle Visual/Dimensional
Inspection Valve
Ultrasonic Inspection Dye Pen. Inspection Inspection
level Type
50 Per Table 2 Per Table 2 Per Table 2
51 Percent Coverage Percent
Coverage Percent Coverage
Cast 100% RT/UT 100% 100%
100% 100% 100%
1 Forged 100% UT 100% 100%
100% 100% 100%
52 Fabricated 100% RT/UT 100% 100%
100% 100% 100%
Cast Nil Nil Nil
Nil 100% 100%
2 Forged Nil Nil Nil
Nil 100% 100%
53 Fabricated 100% RT/UT All welds All welds
All welds 100% 100%
54 Notes: (cont'd)
5. When gas testing is called for on Valve Data Sheet, valves shall be subject to shell / body and seat gas pressure tests at
maximum design pressure for 15 minutes.
Testing shall be performed on one valve to qualify other sizes and ratings as per fire test standard BS 6755 Pt. 2
Testing shall be performed with nitrogen/1% helium mix with external leakage measured with a mass spectrometer.
55 Acceptance criteria shall be: Body / shell: No leakage, Seats: 10 scc / cm. dia. / min
56 6. Where applicable, valves shall have butt weld ends non-destructively tested in accordance with BS 5998, Fig. 1.
57 Table 2: NDE Standards & Acceptance Levels
Testing Acceptance Severity
Standard
58 Activity Criteria Levels
Categories C, D, E
Visual MSS-SP-55 MSS-SP-55
59 not accepted
ASME Shrinkage category
Radiography Annex B
60 B16.34 'C' to be level 2
ASME
Ultrasonic Annex E
61 B16.34
ASME Linear indications
MPI Annex C
62 B16.34 12 mm long max.
ASME Linear indications
Dye Penetr. Annex D
63 B16.34 12 mm long max.
64 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
65 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
66 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
67 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
68 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
69 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
70 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested carbon steel
ii) Vibroetching on alloy or stainless steel or titanium
71 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
72 DOCUMENTATION
73 At Bid stage:
74 Data sheet identified by valve ID and drawings of valve and actuator with material listing, dimensions, weight etc.
75 Maximum velocity for the valve.
76 Proof of cavitation check - fully open.
77
78 Upon Contract:
79 Qualified Welding Procedure Specifications
80 Non Destructive Examination Procedures
81 With Supply:
82 Material Certification Dossier incl. Material Test Records
83 Welding Records
84 Non-Destructive Examination Records
85 Lining visual inspection records and adhesion test records (15 kV spark test as described in BS 6374), if applicable.
86 As-built Drawings
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11240_Lug_style_Butterfly_valve Rev.T01.xls]Lined butterfly valve
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11240 Sht 3 of 3
Communications Piping Class: AC01 & AC02
DATA SHEET
Development of Muscat & Salalah International Airports LUG STYLE BUTTERFLY VALVE
87
88
89
90
91
92
93
94
95
96 Notes: (cont'd)
97 13. Supplier shall submit with bid details of lever, hand wheel, and gearbox operators for all valve sizes.
98 14. Valves sizes smaller than 8" (DN200) shall be either lever or gear operated. Valves 8" (DN200) and larger shall be gear operated.
15. Gear operator shall be totally enclosed waterproof type, packed with suitable lubricant.
99
Thay shall be fitted with one or more easily accessible grease nipples.
16. Valve rotational stops shall be independent of the lever on lever operated valves, i.e. if lever is removed from the valve,
100
the valve shall not be allowed to rotate.
17. To prevent incorrect operation, the mounting of gear operators shall be such that a correct flow passage is assured,
101
and the valve can be fully opened or closed.
102 18. There shall be no possibilty of turning the disk past 90 deg. fully closed or fully open.
103 19. Maximum force to operate valves shall be 350 N.
20. In addition to the above the valves shall be fitted with the gear boxes when the following brake torques are exceeded at maximum
differential pressure across the valve seat:
104
Lever maximum torque 150 Nm with Maximum lever length 450 mm.
Hand wheel maximum torque 150 Nm with Wheel maximum diameter 750 mm.
105 21. Maximum breake out and close torque necessary to operate any valve at max. differential pressure shall not exceed 205 Nm.
106 22. With tha valve in open position levers, if fitted, shall be parallel with the pipe.
107 23. Position indicators shall be provided on non-wrench operated valves. The details of idicator shall be included with the bid.
108 24. Break torque for each valve size shall be verified during test.
109
Dry Film Thickness
110 PAINTING Class Material Color
min. (micron)
Two pack epoxy
111 First coat 100 Contrast
barrier coat
Acrylic polyurethane RAL 9002,
112 Second coat 50
topcoat Gray White
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11240_Lug_style_Butterfly_valve Rev.T01.xls]Lined butterfly valve
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11241 Sht 1 of 3
Piping Class: AC01 & AC02
Communications
DOUBLE FLANGED BUTTERFLY
Development of Muscat & Salalah International Airports VALVE DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender ######## PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
VALVE
5 SERVICE (Located at) GENERAL
6 TYPE CS BUTTERFLY VALVE
7
8
9 DESIGN BS EN 593
10 FLUID (Type and phase) WATER,
11 BODY SIZE RANGE / RATING DN700 to DN1200, PN 16
12 PRESSURE barg 12.5
13 TEMPERATURE °C -10 / 75
14 STANDARDS / CODES ASME B16.34, BS EN 12266
15 OPERATION See page 3, note 14
16 DIMENSIONAL STANDARD BS EN 558-1 Series 13
17 ENDS ASME B16.5 RF /BS EN 1092 RF B1
18 BODY DOUBLE FLANGED
19 STEM ANTI-BLOW-OUT PROOF
20 MATERIAL
21 BODY Note 1 (yes/no) ASTM A216 Gr WCB /BS 1504-161 Gr. 480 Yes
22 DISC ASTM A182 Gr. F316L / BS 1503 316 S11
23 STEM ASTM A182 Gr. F316L / BS 1503 316 S11
24 SEAL RETAIN RING ASTM A182 Gr. F316L / BS 1503 316 S11
25 STEM SEALS GRAPHITE
26 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
27 LINING MATERIAL NOT APPLICABLE
SUPPLEMENTARY REQUIREMENTS:
28 PROTECTION
29 FIRE SAFE BS EN ISO 10045 (yes/no) Yes
30 ANTI STATIC DEVICE (BS 5146) (yes/no) Yes
31 NON DESTRUCTIVE TESTING (NDE) (yes/no) Yes
32 PRESSURE RETAINING PARTS (yes/no) Yes
33 NDE PROCEDURE *)
34 ACCEPTANCE CODE SEE TABLE 2
35 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
36 HYDROSTATIC TEST (as per BS EN 12266) (yes/no) Yes, Body: 18,8 barg, Seats 6 barg. Soft seated min. 30 minutes
37 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
38 FUNCTIONAL TEST WITH ACTUATOR (yes/no) Yes
39 PAINTING (yes/no) Yes See page 3.
40 INSPECTION LEVEL 2, (Note 2, 4)
CERTIFICATION:
41 PRESSURE CONTAINING PARTS EN 10204 3.1, Note 1 Traceability Level 1
42 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
43 PRESSURE TEST Test certificate
44 FIRE TEST TO BS EN 12266 Test certificate
45 DOUBLE BLOCK AND BLEED TEST N/A
46 FUNCTIONAL TEST WITH ACTUATOR Test certificate
47 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
48 TOTAL VALVE SUPPLY Statement of Compliance, Note 2, 4
Notes: 1. For valves of welded construction, the following additional requirements applies:
- Carbon equivalent shall be determined according to: CE=C+Mn/6+0,04 or CE=C+Mn/6+(Cr+Mo+V)/5+(Cu+Ni)/15
- NDE on welds and welding acc. to Code.
- Welding procedure qualification records and NDE records for welds to be incl. in documentation.
2. Inspection Level 1 for ASME rating >300# (PN50) and Inspection Level 2 for ASME rating ≤300# (PN50)
3. Material certificate EN 10204 3.1
4. For Inspection Level 1 valves, Inspection during fabrication, Release Note shall be issued by Certifying Agency.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11241_ DOUBLE_FLANGED_Butterfly_valve Rev T01.xls]Double flanged butterfly valve
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11241 Sht 2 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11241_ DOUBLE_FLANGED_Butterfly_valve Rev T01.xls]Double flanged butterfly valve
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11241 Sht 3 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11241_ DOUBLE_FLANGED_Butterfly_valve Rev T01.xls]Double flanged butterfly valve
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11242 Sht 1 of 3
CARBON STEEL
Development of Muscat & Salalah International Airports
GATE VALVE DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender ######## PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
VALVE
5 SERVICE (Located at) GENERAL
6 TYPE WEDGE GATE VALVE
7
8
9 DESIGN BS EN 1984
10 FLUID (Type and phase) WATER
11 BODY SIZE RANGE / RATING DN20 to DN600, PN16
12 PRESSURE barg 12.5
13 TEMPERATURE °C -10 / 75
14 STANDARDS / CODES ASME B16.34, BS EN 12266
15 OPERATION See page 3, note 14
16 DIMENSIONAL STANDARD BS EN 558 Ser. 3 / ASME B16.10 T1, C 8 & 9
17 ENDS BS EN 1092-1, Type 11, RF B1
18 TRIM CONSTRUCTION SOLID WEDGE UP TO 1½", FLEXIBLE ≥ 2"
19 STEM RISING, ANTI-BLOW-OUT PROOF
20 BONNET OS&Y, BOLTED
21 SEATS RENEWABLE
22 MATERIAL
23 BODY ASTM A216 Gr WCB / BS 1504-161 Gr. 480
Note 1 (yes/no) YES
24 SEALING ELEMENT SS316 HARDFACED
25 STEM SS316
26 SEAT RING SS316 HARDFACED
27 STEM SEALS GRAPHITE
28 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
SUPPLEMENTARY REQUIREMENTS:
29 PROTECTION
30 FIRE SAFE BS EN 12266 Yes (yes/no)
31 ANTI STATIC DEVICE (BS 5146) Yes (yes/no)
32 NON DESTRUCTIVE TESTING (NDE) Yes (yes/no)
33 PRESSURE RETAINING PARTS Yes (yes/no) BS EN 12266-1
34 NDE PROCEDURE *)
35 ACCEPTANCE CODE SEE TABLE 2
36 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
37 HYDROSTATIC TEST (as per BS EN 12266) (yes/no) Yes, Body: 18,8 barg, Seats 6 barg. 15 minutes for all sizes
38 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
39 FUNCTIONAL TEST WITH ACTUATOR (yes/no) Yes
40 PAINTING (yes/no) Yes See page 3.
41 INSPECTION LEVEL 2, (Note 2, 4)
CERTIFICATION:
42 PRESSURE CONTAINING PARTS EN 10204 3.1, Note 1 Traceability Level 1
43 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
44 PRESSURE TEST Test certificate
45 FIRE TEST to BS EN 12266 Test certificate
46 DOUBLE BLOCK AND BLEED TEST N/A
47 FUNCTIONAL TEST WITH ACTUATOR Test certificate
48 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
49 TOTAL VALVE SUPPLY Statement of Compliance, Note 2, 4
Notes: 1. For valves of welded construction, the following additional requirements applies:
- Carbon equivalent shall be determined according to: CE=C+Mn/6+0,04 or CE=C+Mn/6+(Cr+Mo+V)/5+(Cu+Ni)/15
- NDE on welds and welding acc. to Code.
- Welding procedure qualification records and NDE records for welds to be incl. in documentation.
2. Inspection Level 1 for rating >PN20 and Inspection Level 2 for rating≤ PN20
3. Material certificate EN 10204 3.1
4. For Inspection Level 1 valves, Inspection during fabrication, Release Note shall be issued by Certifying Agency.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11242_CS_Gate_valve Rev T01.xls]CS GATE VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11242 Sht 2 of 3
Communications Piping Class: AC01 & AC02
CARBON STEEL
Development of Muscat & Salalah International GATE VALVE DATA SHEET
50 Table 1: INSPECTION LEVELS
Radiographic and/or Magnetic Particle Visual/Dimensional
Inspection Valve
Ultrasonic Inspection Dye Pen. Inspection Inspection
level Type
51 Per Table 2 Per Table 2 Per Table 2
52 Percent Coverage Percent Coverage Percent Coverage
Cast 100% RT/UT 100% 100% 100% 100% 100%
1 Forged 100% UT 100% 100% 100% 100% 100%
53 Fabricated 100% RT/UT 100% 100% 100% 100% 100%
Cast Nil Nil Nil Nil 100% 100%
2 Forged Nil Nil Nil Nil 100% 100%
54 Fabricated 100% RT/UT All welds All welds All welds 100% 100%
55 Notes: (cont'd)
5. When gas testing is called for, valves shall be subject to shell / body and seat gas pressure tests at
maximum design pressure for 15 minutes.
Testing shall be performed on one valve to qualify other sizes and ratings as per fire test standard BS EN 10045
Testing shall be performed with nitrogen/1% helium mix with external leakage measured with a mass spectrometer.
56 Acceptance criteria shall be: Body / shell: No leakage, Seats: 10 scc / cm. dia. / min
57 6. Where applicable, valves shall have butt weld ends non-destructively tested in accordance with BS 5998, Fig. 1.
58 Table 2: NDE Standards & Acceptance Levels
Testing Acceptance Severity
Standard
59 Activity Criteria Levels
Categories C, D, E
Visual MSS-SP-55 MSS-SP-55
60 not accepted
ASME Shrinkage category
Radiography Annex B
61 B16.34 'C' to be level 2
ASME
Ultrasonic Annex E
62 B16.34
ASME Linear indications
MPI Annex C
63 B16.34 12 mm long max.
ASME Linear indications
Dye Penetr. Annex D
64 B16.34 12 mm long max.
65 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
66 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
67 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
68 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
69 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
70 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
71 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested carbon steel
ii) Vibroetching on alloy or stainless steel or titanium
72 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
73 DOCUMENTATION
74 At Bid stage:
75 Data sheet identified by valve ID and drawings of valve and actuator with material listing, dimensions, weight etc.
76 Maximum velocity for the valve.
77 Proof of cavitation check - fully open.
78
79 Upon Contract:
80 Qualified Welding Procedure Specifications
81 Non Destructive Examination Procedures
82 With Supply:
83 Material Certification Dossier incl. Material Test Records
84 Welding Records
85 Non-Destructive Examination Records
86 Lining visual inspection records and adhesion test records (15 kV spark test as described in BS 6374).
87 As-built Drawings
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11242_CS_Gate_valve Rev T01.xls]CS GATE VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11242 Sht 3 of 3
CARBON STEEL
Development of Muscat & Salalah International GATE VALVE DATA SHEET
88
89
90
91
92
93
94
95
96
97 Notes: (cont'd)
98 13. Supplier shall submit with bid details of hand wheel and gearbox operators for all valve sizes.
99 14. Valves 12" and larger shall be gear operated.
15. Gear operator shall be totally enclosed waterproof type, packed with suitable lubricant.
100
Thay shall be fitted with one or more easily accessible grease nipples.
16. To prevent incorrect operation, the mounting of gear operators shall be such that a correct flow passage is assured,
101
and the valve can be fully opened or closed.
102 17. Maximum force to operate valves shall be 350 N.
18. In addition to the above the valves shall be fitted with the gear boxes when the following brake torques are exceeded at maximum
103 differential pressure across the valve seat:
Hand wheel maximum torque 150 Nm with Wheel maximum diameter 750 mm.
104 19. Maximum breake out and close torque necessary to operate any valve at max. differential pressure shall not exceed 205 Nm.
105 20. Break torque for each valve size shall be verified during test.
106
107
108
109
110
Dry Film Thickness
111 PAINTING Coat Material Color
min. (micron)
Two pack epoxy
112 First coat 100 Contrast
barrier coat
Acrylic polyurethane RAL 9002,
113 Second coat 50
topcoat Gray White
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11242_CS_Gate_valve Rev T01.xls]CS GATE VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11243 Sht 1 of 3
CARBON STEEL
Development of Muscat & Salalah International Airports GLOBE VALVE DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
VALVE
5 SERVICE (Located at) GENERAL
6 TYPE GLOBE VALVE
7
8
9 DESIGN BS EN 13709
10 FLUID (Type and phase) WATER
11 BODY SIZE RANGE / RATING DN20 to DN600, PN16
12 PRESSURE barg 12.5
13 TEMPERATURE °C -10 / 75
14 STANDARDS / CODES ASME B16.34, BS EN 12266
15 OPERATION See page 3, note 14
16 DIMENSIONAL STANDARD BS EN 558-1 S. 10 / ASME B16.10 T1, C16
17 ENDS BS EN 1092 Type 11, RF B1
18 TRIM CONSTRUCTION SWIVELING PLUG TYPE DISK
19 STEM RISING, ANTI-BLOW-OUT PROOF
20 BONNET OS&Y, BOLTED
21 SEATS RENEWABLE
22 MATERIAL
23 BODY Note 1 (yes/no) ASTM A216 Gr WCB / BS 1504-161-Gr. 480 YES
24 DISK SS316 HARDFACED
25 STEM SS316
26 SEAT RING SS316 HARDFACED
27 STEM SEALS GRAPHITE
28 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
SUPPLEMENTARY REQUIREMENTS:
29 PROTECTION
30 FIRE SAFE BS EN 12266 Yes (yes/no)
31 ANTI STATIC DEVICE (BS 5146) Yes (yes/no)
32 NON DESTRUCTIVE TESTING (NDE) Yes (yes/no)
33 PRESSURE RETAINING PARTS Yes (yes/no)BS EN 12266-1
34 NDE PROCEDURE *)
35 ACCEPTANCE CODE SEE TABLE 2
36 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
37 HYDROSTATIC TEST (as per ANSI B16.34) (yes/no) Yes, Body: 18,8 barg, Seats 6 barg. 15 minutes for all sizes
38 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
39 FUNCTIONAL TEST WITH ACTUATOR (yes/no) Yes
40 PAINTING (yes/no) Yes See page 3.
41 INSPECTION LEVEL 2, (Note 2, 4)
CERTIFICATION:
42 PRESSURE CONTAINING PARTS EN 10204 3.1, Note 1 Traceability Level 1
43 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
44 PRESSURE TEST Test certificate
45 FIRE TEST to BS EN 12266 Test certificate
46 DOUBLE BLOCK AND BLEED TEST N/A
47 FUNCTIONAL TEST WITH ACTUATOR Test certificate
48 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
49 TOTAL VALVE SUPPLY Statement of Compliance, Note 2, 4
Notes: 1. For valves of welded construction, the following additional requirements applies:
- Carbon equivalent shall be determined according to: CE=C+Mn/6+0,04 or CE=C+Mn/6+(Cr+Mo+V)/5+(Cu+Ni)/15
- NDE on welds and welding acc. to Code.
- Welding procedure qualification records and NDE records for welds to be incl. in documentation.
2. Inspection Level 1 for >PN20 and Inspection Level 2 for rating≤PN20
3. Material certificate EN 10204 3.1
4. For Inspection Level 1 valves, Inspection during fabrication, Release Note shall be issued by Certifying Agency.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11243_CS_globe_valve Rev T01.xls]CS GLOBE VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11243 Sht 2 of 3
CARBON STEEL
Development of Muscat & Salalah International Airports GLOBE VALVE DATA SHEET
50 Table 1: INSPECTION LEVELS
Radiographic and/or Magnetic Particle Visual/Dimensional
Inspection Valve
Ultrasonic Inspection Dye Pen. Inspection Inspection
level Type
51 Per Table 2 Per Table 2 Per Table 2
52 Percent Coverage Percent Coverage
Percent Coverage
Cast 100% RT/UT 100% 100% 100%100% 100%
1 Forged 100% UT 100% 100% 100%100% 100%
53 Fabricated 100% RT/UT 100% 100% 100%100% 100%
Cast Nil Nil Nil 100% Nil 100%
2 Forged Nil Nil Nil 100% Nil 100%
54 Fabricated 100% RT/UT All welds All welds All welds
100% 100%
55 Notes: (cont'd)
5. When gas testing is called for, valves shall be subject to shell / body and seat gas pressure tests at
maximum design pressure for 15 minutes.
Testing shall be performed on one valve to qualify other sizes and ratings as per fire test standard BS EN 10045
Testing shall be performed with nitrogen/1% helium mix with external leakage measured with a mass spectrometer.
56 Acceptance criteria shall be: Body / shell: No leakage, Seats: 10 scc / cm. dia. / min
57 6. Where applicable, valves shall have butt weld ends non-destructively tested in accordance with BS 5998, Fig. 1.
58 Table 2: NDE Standards & Acceptance Levels
Testing Acceptance Severity
Standard
59 Activity Criteria Levels
Categories C, D, E
Visual MSS-SP-55 MSS-SP-55
60 not accepted
ASME Shrinkage category
Radiography Annex B
61 B16.34 'C' to be level 2
ASME
Ultrasonic Annex E
62 B16.34
ASME Linear indications
MPI Annex C
63 B16.34 12 mm long max.
ASME Linear indications
Dye Penetr. Annex D
64 B16.34 12 mm long max.
65 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
66 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
67 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
68 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
69 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
70 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
71 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested carbon steel
ii) Vibroetching on alloy or stainless steel or titanium
72 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
73 DOCUMENTATION
74 At Bid stage:
75 Data sheet identified by valve ID and drawings of valve and actuator with material listing, dimensions, weight etc.
76 Maximum velocity for the valve.
77 CV values for each valve size
78 Proof of cavitation check - fully open.
79 Upon Contract:
80 Qualified Welding Procedure Specifications
81 Non Destructive Examination Procedures
82 With Supply:
83 Material Certification Dossier incl. Material Test Records
84 Welding Records
85 Non-Destructive Examination Records
86 As-built Drawings
87
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11243_CS_globe_valve Rev T01.xls]CS GLOBE VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11243 Sht 3 of 3
CARBON STEEL
Development of Muscat & Salalah International Airports GLOBE VALVE DATA SHEET
88
89
90
91
92
93
94
95
96
97 Notes: (cont'd)
98 13. Supplier shall submit with bid details of hand wheel and gearbox operators for all valve sizes.
99 14. Valves 8" and larger shall be gear operated.
15. Gear operator shall be totally enclosed waterproof type, packed with suitable lubricant.
100
Thay shall be fitted with one or more easily accessible grease nipples.
16. To prevent incorrect operation, the mounting of gear operators shall be such that a correct flow passage is assured,
101
and the valve can be fully opened or closed.
102 17. Maximum force to operate valves shall be 350 N.
18. In addition to the above the valves shall be fitted with the gear boxes when the following brake torques are exceeded at maximum
103 differential pressure across the valve seat:
Hand wheel maximum torque 150 Nm with Wheel maximum diameter 750 mm.
104 19. Maximum breake out and close torque necessary to operate any valve at max. differential pressure shall not exceed 205 Nm.
105 20. Break torque for each valve size shall be verified during test.
106
107
108
109
110
Dry Film Thickness
111 PAINTING Coat Material Color
min. (micron)
Two pack epoxy
112 First coat 100 Contrast
barrier coat
Acrylic polyurethane RAL 9002,
113 Second coat 50
topcoat Gray White
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11243_CS_globe_valve Rev T01.xls]CS GLOBE VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11244 Sht 1 of 3
Communications Piping Class: AC01 & AC02
CARBON STEEL
Development of Muscat & Salalah International Airports FLANGED BALL VALVE DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D APPR'DCOUNTRY OF ORIGIN *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
VALVE
5 SERVICE GENERAL
6 TYPE CS BALL VALVE, FULL PORT
7
8
9 DESIGN BS ISO 7121
10 FLUID (Type and phase) WATER,
11 BODY SIZE RANGE / RATING DN15 to DN600, PN 16
12 PRESSURE barg 12.5
13 TEMPERATURE °C -10 / 75
14 STANDARDS / CODES ASME B16.34, BS EN 12266
15 OPERATION See page 3, note 14
16 DIMENSIONAL STANDARD BS EN 558-1 S 3&12 / ASME B16.10 T1, C 18
17 ENDS BS EN 1092-1 Type 11, RF B1
18 BODY BOLTED
19 STEM ANTI-BLOW-OUT PROOF
20 MATERIAL
21 BODY Note 1 (yes/no) ASTM A216 Gr WCB / BS 1504-161 Gr. 480 Yes
22 BALL ASTM A182 Gr. F316L / BS 1503 316 S11
23 STEM ASTM A182 Gr. F316L / BS 1503 316 S11
24 SEAT RING ASTM A182 Gr. F316L / BS 1503 316 S11
25 STEM SEALS GRAPHITE AND VITON "F"
26 SEATS PTFE
27 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
SUPPLEMENTARY REQUIREMENTS:
28 PROTECTION
29 FIRE SAFE BS EN 12266 Yes (yes/no)
30 ANTI STATIC DEVICE (BS 5146) Yes (yes/no)
31 NON DESTRUCTIVE TESTING (NDE) Yes (yes/no)
32 PRESSURE RETAINING PARTS Yes (yes/no)
33 NDE PROCEDURE *)
34 ACCEPTANCE CODE SEE TABLE 2
35 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
Yes, Body: 18,8 barg, Seats 6 barg. Soft seated min. 15 minutes up to DN300
36 HYDROSTATIC TEST (as per BS EN 12266) (yes/no)
30 minutes DN350 and larger
37 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
38 FUNCTIONAL TEST WITH ACTUATOR (yes/no) Yes
39 PAINTING (yes/no) Yes See page 3.
40 INSPECTION LEVEL 2, (Note 2, 4)
CERTIFICATION:
41 PRESSURE CONTAINING PARTS EN 10204 3.1, Note 1 Traceability Level 1
42 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
43 PRESSURE TEST Test certificate
44 FIRE TEST to API 6FA Test certificate
45 DOUBLE BLOCK AND BLEED TEST N/A
46 FUNCTIONAL TEST WITH ACTUATOR Test certificate
47 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
48 TOTAL VALVE SUPPLY Statement of Compliance, Note 2, 4
Notes: 1. For valves of welded construction, the following additional requirements applies:
- Carbon equivalent shall be determined according to: CE=C+Mn/6+0,04 or CE=C+Mn/6+(Cr+Mo+V)/5+(Cu+Ni)/15
- NDE on welds and welding acc. to Code.
- Welding procedure qualification records and NDE records for welds to be incl. in documentation.
2. Inspection Level 1 for rating >PN20 and Inspection Level 2 for rating ≤PN20
3. Material certificate EN 10204 3.1
4. For Inspection Level 1 valves, Inspection during fabrication, Release Note shall be issued by Certifying Agency.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11244_CS_Fgd_Ball_valve Rev T01.xls]CS BALL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11244 Sht 2 of 3
Communications Piping Class: AC01 & AC02
CARBON STEEL
Development of Muscat & Salalah International Airports FLANGED BALL VALVE DATA SHEET
49 Table 1: INSPECTION LEVELS
Radiographic and/or Magnetic Particle Visual/Dimensional
Inspection Valve
Ultrasonic Inspection Dye Pen. Inspection Inspection
level Type
50 Per Table 2 Per Table 2 Per Table 2
51 Percent Coverage Percent Coverage Percent Coverage
Cast 100% RT/UT 100% 100% 100% 100% 100%
1 Forged 100% UT 100% 100% 100% 100% 100%
52 Fabricated 100% RT/UT 100% 100% 100% 100% 100%
Cast Nil Nil Nil Nil 100% 100%
2 Forged Nil Nil Nil Nil 100% 100%
53 Fabricated 100% RT/UT All welds All welds
All welds 100% 100%
54 Notes: (cont'd)
5. When gas testing is called for, valves shall be subject to shell / body and seat gas pressure tests at
maximum design pressure for 15 minutes.
Testing shall be performed on one valve to qualify other sizes and ratings as per fire test standard BS 6755 Pt. 2
Testing shall be performed with nitrogen/1% helium mix with external leakage measured with a mass spectrometer.
55 Acceptance criteria shall be: Body / shell: No leakage, Seats: 10 scc / cm. dia. / min
56 6. Where applicable, valves shall have butt weld ends non-destructively tested in accordance with BS 5998, Fig. 1.
57 Table 2: NDE Standards & Acceptance Levels
Testing Acceptance Severity
Standard
58 Activity Criteria Levels
Categories C, D, E
Visual MSS-SP-55 MSS-SP-55
59 not accepted
ASME Shrinkage category
Radiography Annex B
60 B16.34 'C' to be level 2
ASME
Ultrasonic Annex E
61 B16.34
ASME Linear indications
MPI Annex C
62 B16.34 12 mm long max.
ASME Linear indications
Dye Penetr. Annex D
63 B16.34 12 mm long max.
64 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
65 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
66 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
67 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
68 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
69 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
70 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested carbon steel
ii) Vibroetching on alloy or stainless steel or titanium
71 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
72 DOCUMENTATION
73 At Bid stage:
74 Data sheet identified by valve ID and drawings of valve and actuator with material listing, dimensions, weight etc.
75 Maximum velocity for the valve.
76 Details of how the liner is locked into the body, and how it is sealed around the stem.
77 Proof of cavitation check - fully open.
78 Upon Contract:
79 Qualified Welding Procedure Specifications
80 Non Destructive Examination Procedures
81 With Supply:
82 Material Certification Dossier incl. Material Test Records
83 Welding Records
84 Non-Destructive Examination Records
85 As-built Drawings
86
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11244_CS_Fgd_Ball_valve Rev T01.xls]CS BALL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11244 Sht 3 of 3
CARBON STEEL
Development of Muscat & Salalah International Airports FLANGED BALL VALVE DATA SHEET
87
88
89
90
91
92
93
94
95
96 Notes: (cont'd)
97 13. Supplier shall submit with bid details of lever, hand wheel, and gearbox operators for all valve sizes.
98 14. Valves DN200 and larger shall be gear operated.
15. Gear operator shall be totally enclosed waterproof type, packed with suitable lubricant.
99
Thay shall be fitted with one or more easily accessible grease nipples.
16. Valve rotational stops shall be independent of the lever on lever operated valves, i.e. if lever is removed from the valve,
100
the valve shall not be allowed to rotate.
17. To prevent incorrect operation, the mounting of gear operators shall be such that a correct flow passage is assured,
101
and the valve can be fully opened or closed.
102 18. There shall be no possibilty of turning the ball past 90 deg. fully closed or fully open.
103 19. Maximum force to operate valves shall be 350 N.
20. In addition to the above the valves shall be fitted with the gear boxes when the following brake torques are exceeded at maximum
differential pressure across the valve seat:
104
Lever maximum torque 150 Nm with Maximum lever length 450 mm.
Hand wheel maximum torque 150 Nm with Wheel maximum diameter 750 mm.
105 21. Maximum breake out and close torque necessary to operate any valve at max. differential pressure shall not exceed 205 Nm.
106 22. With tha valve in open position levers, if fitted, shall be parallel with the pipe.
107 23. Position indicators shall be provided on non-wrench operated valves. The details of idicator shall be included with the bid.
108 24. Break torque for each valve size shall be verified during test.
109
Dry Film Thickness
110 PAINTING Class Material Color
min. (micron)
Two pack epoxy
111 First coat 100 Contrast
barrier coat
Acrylic polyurethane RAL 9002,
112 Second coat 50
topcoat Gray White
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11244_CS_Fgd_Ball_valve Rev T01.xls]CS BALL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11245 Sht 1 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11245_CS_Ball_valve_Screwed Rev T01.xls]CS BALL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11245 Sht 3 of 3
Communications Piping Class: AC01 & AC02
CARBON STEEL
SCREWED BALL VALVE DATA
Development of Muscat & Salalah International Airports
SHEET
88
89
90
91
92
93
94
95
96
97 Notes: (cont'd)
98 13. Supplier shall submit with bid details of lever, hand wheel, and gearbox operators for all valve sizes.
99 14. Valves 8" and larger shall be gear operated.
15. Gear
100
operator
16. Valve
101
rotational
17. To prevent
102
incorrect
103 18. There shall be no possibilty of turning the ball past 90 deg. fully closed or fully open.
104 19. Maximum force to operate valves shall be 350 N.
20. In addition
to the above
105
the valves
shall be
106 21. Maximum breake out and close torque necessary to operate any valve at max. differential pressure shall not exceed 205 Nm.
107 22. With tha
108 23. Position indicators shall be provided on non-wrench operated valves. The details of idicator shall be included with the bid.
109 24. Break torque for each valve size shall be verified during test.
110
Dry Film
111 PAINTING Class Material Thickness Color
min. (micron)
Two
112 First coat 100 Contrast
pack
Acrylic
RAL 9002,
113 Second coat polyuret 50
Gray White
hane
114 Total 150
115
116
117 Traceability Levels:
Full
118 I Traceability
: Material
Type
119 II
Traceability
120 III Compliance Traceability : Supplier shall maintain a system of traceability that shall enable issue of Certificate of Compliance.
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11245_CS_Ball_valve_Screwed Rev T01.xls]CS BALL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11246 Sht 1 of 3
Communications Piping Class: AP01 & AP02
POTABLE WATER SERVICE
STAINLESS STEEL
Development of Muscat & Salalah International Airports GATE VALVE DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
DESCRIPTION SPECIFIED VENDOR DATA REV
PLANT SPECIFIC DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
VALVE
5 SERVICE (Located at) GENERAL
6 TYPE WEDGE GATE VALVE
7
8 DESIGN BS EN 1984
9 FLUID (Type and phase) POTABLE WATER
10 BODY SIZE RANGE / RATING DN150 to DN300, PN16
11 PRESSURE barg 12.5
12 TEMPERATURE °C -10 / 75
13 Max. Allowable press. Drop-Open bar 0.02
14 STANDARDS / CODES ASME B16.34, BS EN 12266
15 OPERATION See page 3, note 14
16 DIMENSIONAL STANDARD BS EN 558-1 S 3 / ASME B16.10 T1 C 8&9
17 ENDS BS EN 1092-1 Type 11, RF B1
18 TRIM CONSTRUCTION FLEXIBLE WEDGE
19 STEM RISING, ANTI-BLOW-OUT PROOF
20 BONNET OS&Y, BOLTED
21 SEATS RENEWABLE
22 MATERIAL
23 BODY Note 1 (yes/no) ASTM A351 Gr. CF 8M, BS1504 316 Gr. C16 Yes
24 SEALING ELEMENT SS316
25 STEM SS316
26 STEM SEALS PURE MINERAL GRAPHITE
27
SUPPLEMENTARY REQUIREMENTS:
28 PROTECTION
29 FIRE SAFE BS EN 12266 Yes (yes/no)
30 ANTI STATIC DEVICE (BS 5146) Yes (yes/no)
31 NON DESTRUCTIVE TESTING (NDE) Yes (yes/no)
32 PRESSURE RETAINING PARTS Yes (yes/no)
33 NDE PROCEDURE *)
34 ACCEPTANCE CODE SEE TABLE 2
35 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
36 HYDROSTATIC TEST (as per BS EN 12266) (yes/no) Yes, Body: 18,8 barg, Seats 6 barg. 15 min. for all sizes
37 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
38 FUNCTIONAL TEST WITH ACTUATOR (yes/no) Yes
39 PAINTING (yes/no) No
40 INSPECTION LEVEL 2, (Note 2, 4)
CERTIFICATION:
41 PRESSURE CONTAINING PARTS EN 10204 3.1, Note 1 Traceability Level 1
42 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
43 PRESSURE TEST Test certificate
44 FIRE TEST to BS EN 12266 Test certificate
45 DOUBLE BLOCK AND BLEED TEST N/A
46 FUNCTIONAL TEST WITH ACTUATOR Test certificate
47 WETTED PARTS CONFORMANCE WITH ANSI/NSF 61 Certificate of Conformance
48 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
49 TOTAL VALVE SUPPLY Statement of Compliance, Note 2, 4
Notes: 1. For valves of welded construction, the following additional requirements applies:
- NDE on welds and welding acc. to Code.
- Welding procedure qualification records and NDE records for welds to be incl. in documentation.
2. Inspection Level 1 for rating >PN20 and Inspection Level 2 for rating≤PN20
3. Material certificate EN 10204 3.1
4. For Inspection Level 1 valves, Inspection during fabrication, Release Note shall be issued by Certifying Agency.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11246_Potable_Water_SS_Gate_valve Rev T01.xls]SS GATE VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11246 Sht 2 of 3
64
65 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
66 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
67 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
68 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
69 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
70 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
71 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested steel
ii) Vibroetching on alloy or stainless steel or titanium
72 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
73 DOCUMENTATION
74 At Bid stage:
75 Data sheet identified by valve ID and drawings of valve and actuator with material listing, dimensions, weight etc.
76 Maximum velocity for the valve.
77 Proof of cavitation check - fully open.
78
79 Upon Contract:
80 Qualified Welding Procedure Specifications
81 Non Destructive Examination Procedures
82 Materials Certificate of Conformance with ANSI/NSF 61
83 With Supply:
84 Material Certification Dossier incl. Material Test Records
85 Welding Records
86 Non-Destructive Examination Records
87 As-Built Drawings
88
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11246_Potable_Water_SS_Gate_valve Rev T01.xls]SS GATE VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11246 Sht 3 of 3
113
114
115
116
117
118 Traceability Levels:
Full Traceability: Material shall be uniquely identified and its history tracked from manufacture through stockist to Supplier.
119 I The prcise location shall be defined on Material Placement Record. MPR shall be available for verification by Certifying Authority,
and/or Authorized Inspection Agency, and/or Owner.
Type Traceability: Supplier shall maintain a system to identify material throughout manufacture and ensure
120 II
traceability to a material certificate.
121 III Compliance Traceability: Supplier shall maintain a system of traceability that shall enable issue of Certificate of Compliance.
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11246_Potable_Water_SS_Gate_valve Rev T01.xls]SS GATE VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11247 Sheet 1 of 3
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11247_Potable water_SS_Gate_SB_valve Rev T01.xls]PW SS SMALL BORE GATE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11247 Sheet 2 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11247_Potable water_SS_Gate_SB_valve Rev T01.xls]PW SS SMALL BORE GATE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11247 Sheet 3 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11247_Potable water_SS_Gate_SB_valve Rev T01.xls]PW SS SMALL BORE GATE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11248 Sht 1 of 3
AC01, AC02, AS01
Communications Piping Class:
GENERAL SERVICE
STAINLESS STEEL
Development of Muscat & Salalah International SWING CHECK VALVE DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D APPR'D COUNTRY OF ORIGIN *)
DESCRIPTION SPECIFIED VENDOR DATA REV
PLANT SPECIFIC DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
VALVE
5 SERVICE (Located at) GENERAL
6 TYPE SWING CHECK VALVE
7 POSITION HORIZONTAL, VERTICAL (UP-FLOW)
8
9 DESIGN BS EN 14341
10 FLUID (Type and phase) WATER
11 BODY SIZE RANGE / RATING DN50 to DN600, PN16
12 PRESSURE barg 12.5
13 TEMPERATURE °C -10 / 75
14 STANDARDS / CODES ASME B16.34, BS EN 12266
15 DIMENSIONAL STANDARD BS EN 558-1 S 10/ ASME B16.10 T 1, C 16
16 ENDS BS EN 1092-1 Type 11, RF B1
17 TRIM CONSTRUCTION SWING TYPE
18 COVER BOLTED
19 SPRING NO
20 SEATS RENEWABLE
21
22 MATERIAL
23 BODY, COVER Note 1 (yes/no) ASTM A351 Gr. CF8M / BS1504 316 Gr. C16 YES
24 DISK SS316 HARDFACED
25 STEM N.A.
26 SEAT RING SS316 HARDFACED
27 SPRING NONE
28 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
SUPPLEMENTARY REQUIREMENTS:
29 PROTECTION
30 FIRE SAFE BS EN 12266 No(yes/no)
31 ANTI STATIC DEVICE (BS 5146) No(yes/no)
32 NON DESTRUCTIVE TESTING (NDE) (yes/no)
Yes
33 PRESSURE RETAINING PARTS (yes/no)
Yes
34 NDE PROCEDURE *)
35 ACCEPTANCE CODE SEE TABLE 2
36 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
37 HYDROSTATIC TEST (as per BS EN 12266) (yes/no) Yes, Body: 18,8 barg, Seats 6 barg. 15 min. for all sizes
38 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
39 FUNCTIONAL TEST WITH ACTUATOR (yes/no) N.A.
40 PAINTING (yes/no) No
41 INSPECTION LEVEL Level 2, (Note 2, 4)
CERTIFICATION:
42 PRESSURE CONTAINING PARTS EN 10204 3.1, Note 1 Traceability Level 2
43 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
44 PRESSURE TEST Test certificate
45 FIRE TEST to BS EN 12266 N.A.
46 DOUBLE BLOCK AND BLEED TEST N/A
47 FUNCTIONAL TEST WITH ACTUATOR N/A
48 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
49 TOTAL VALVE SUPPLY Statement of Compliance, Note 2, 4
Notes: 1. For valves of welded construction, the following additional requirements applies:
- NDE on welds and welding acc. to Code.
- Welding procedure qualification records and NDE records for welds to be incl. in documentation.
2. Inspection Level 1 for rating >PN20 and Inspection Level 2 for rating≤PN20
3. Material certificate EN 10204 3.1
4. For Inspection Level 1 valves, Inspection during fabrication, Release Note shall be issued by Certifying Agency.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11248_SS_SWING_CHECK_valve Rev. T01.xls]GEN. SERVICE SS SWING CHECK VLV
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11248 Sht 2 of 3
64
65 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
66 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
67 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
68 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
69 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
70 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
71 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested steel
ii) Vibroetching on alloy or stainless steel or titanium
72 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
73 DOCUMENTATION
74 At Bid stage:
75 Data sheet identified by valve ID and drawings of valve with material listing, dimensions, weight etc.
76 Maximum velocity for the valve.
77 Pressure drop curve.
78
79 Upon Contract:
80 Qualified Welding Procedure Specifications
81 Non Destructive Examination Procedures
82 With Supply:
83 Material Certification Dossier incl. Material Test Records
84 Welding Records
85 Non-Destructive Examination Records
86 As-Built Drawings
87
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11248_SS_SWING_CHECK_valve Rev. T01.xls]GEN. SERVICE SS SWING CHECK VLV
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11248 Sht 3 of 3
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117 Traceability Levels:
Full Traceability: Material shall be uniquely identified and its history tracked from manufacture through stockist to Supplier.
118 I The prcise location shall be defined on Material Placement Record. MPR shall be available for verification by Certifying Authority,
and/or Authorized Inspection Agency, and/or Owner.
Type Traceability: Supplier shall maintain a system to identify material throughout manufacture and ensure
119 II
traceability to a material certificate.
120 III Compliance Traceability: Supplier shall maintain a system of traceability that shall enable issue of Certificate of Compliance.
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11248_SS_SWING_CHECK_valve Rev. T01.xls]GEN. SERVICE SS SWING CHECK VLV
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11249 Sht 1 of 3
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11249_PW_Serv_SS_SWING_CHECK_valve Rev. T01.xls]GEN. SERVICE SS SWING CHECK VLV
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11249 Sht 2 of 3
65
66 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
67 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
68 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
69 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
70 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
71 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
72 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested steel
ii) Vibroetching on alloy or stainless steel or titanium
73 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
74 DOCUMENTATION
75 At Bid stage:
76 Data sheet identified by valve ID and drawings of valve with material listing, dimensions, weight etc.
77 Maximum velocity for the valve.
78 Pressure drop curve.
79
80 Upon Contract:
81 Qualified Welding Procedure Specifications
82 Non Destructive Examination Procedures
83 Materials Ceertificate of Conformance with ANSI / NSF 61
84 With Supply:
85 Material Certification Dossier incl. Material Test Records
86 Welding Records
87 Non-Destructive Examination Records
88 As-Built Drawings
89
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11249_PW_Serv_SS_SWING_CHECK_valve Rev. T01.xls]GEN. SERVICE SS SWING CHECK VLV
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11249 Sht 3 of 3
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119 Traceability Levels:
Full Traceability : Material shall be uniquely identified and its history tracked from manufacture through stockist to Supplier.
120 I The prcise location shall be defined on Material Placement Record. MPR shall be available for verification by Certifying Authority,
and/or Authorized Inspection Agency, and/or Owner.
Type Traceability : Supplier shall maintain a system to identify material throughout manufacture and ensure
121 II
traceability to a material certificate.
122 III Compliance Traceability : Supplier shall maintain a system of traceability that shall enable issue of Certificate of Compliance.
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11249_PW_Serv_SS_SWING_CHECK_valve Rev. T01.xls]GEN. SERVICE SS SWING CHECK VLV
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11250 Sht 1 of 3
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11250_PW Serv_SS_BALL_CHECK_valve Rev.T01.xls]SS BALL CHECK VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11250 Sht 2 of 3
65
66 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
67 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
68 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
69 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
70 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
71 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
72 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested steel
ii) Vibroetching on alloy or stainless steel or titanium
73 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
74 DOCUMENTATION
75 At Bid stage:
76 Data sheet identified by valve ID and drawings of valve with material listing, dimensions, weight etc.
77 Maximum velocity for the valve.
78 Pressure drop curve.
79
80 Upon Contract:
81 Qualified Welding Procedure Specifications
82 Non Destructive Examination Procedures
83 Materials Certificate of Conformance with ANSI/NSF 61
84 With Supply:
85 Material Certification Dossier incl. Material Test Records
86 Welding Records
87 Non-Destructive Examination Records
88 As-Built Drawings
89
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11250_PW Serv_SS_BALL_CHECK_valve Rev.T01.xls]SS BALL CHECK VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11250 Sht 3 of 3
AG01, AP01
Communications Piping Class:
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119 Traceability Levels:
Full Traceability: Material shall be uniquely identified and its history tracked from manufacture through stockist to Supplier.
120 I The prcise location shall be defined on Material Placement Record. MPR shall be available for verification by Certifying Authority,
and/or Authorized Inspection Agency, and/or Owner.
Type Traceability: Supplier shall maintain a system to identify material throughout manufacture and ensure
121 II
traceability to a material certificate.
122 III Compliance Traceability: Supplier shall maintain a system of traceability that shall enable issue of Certificate of Compliance.
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11250_PW Serv_SS_BALL_CHECK_valve Rev.T01.xls]SS BALL CHECK VALVE
Sultanate of Oman
Ministry of Transport Doc. Number: AL-905-000-R-11251 Sht 1 of 3
STAINLESS STEEL
Development of Muscat & Salalah International PLATE CHECK VALVE DATA SHEET
Airports
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
DESCRIPTION SPECIFIED VENDOR DATA REV
PLANT SPECIFIC DAA
1 AMBIENT TEMPERATURE °C 0 / +55
2 HUMIDITY
3 LOCATION INDOORS
4 AREA CLASSIFICATION
VALVE
5 SERVICE (Located at) GENERAL
6 TYPE PLATE CHECK VALVE
7 POSITION HORIZONTAL, VERTICAL (UP-FLOW)
8
9 DESIGN
10 FLUID (Type and phase) WATER
11 BODY SIZE RANGE / RATING DN80 - DN1200, PN 16
12 PRESSURE barg 12.5
13 TEMPERATURE °C -10 / 75
14 STANDARDS / CODES ASME B16.34, BS EN 12266
15 DIMENSIONAL STANDARD ASME B16.10 T 8
16 ENDS BS EN 1092-1 Type 11, RF B1
17 DN80 - DN150: SOLID LUG
18 DN200 - DN1200: FLANGED
19 TRIM CONSTRUCTION DUAL PLATE TYPE, RETAINERLESS
20 SEATS INTEGRAL
21
22 MATERIAL
ASTM A351 Gr. CF8M / A182 Gr. F316/F316L
23 BODY Note 1 (yes/no) Yes
BS1504 316 Gr.C16
24 DISK SS316 HARDFACED
25 STEM N.A.
26 SEAT RING HARDFACED
27 SPRING UNS N06625 / N10276
28 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
SUPPLEMENTARY REQUIREMENTS:
29 PROTECTION
30 FIRE SAFE BS EN ISO 10497 No (yes/no)
31 ANTI STATIC DEVICE (BS 5146) No (yes/no)
32 NON DESTRUCTIVE TESTING (NDE) Yes (yes/no)
33 PRESSURE RETAINING PARTS Yes (yes/no)
34 NDE PROCEDURE *)
35 ACCEPTANCE CODE SEE TABLE 2
36 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
37 HYDROSTATIC TEST (as per ANSI B16.34) (yes/no) Yes, Body: 18,8 barg, Seats 6 barg. 15 minutes for all sizes
38 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
39 FUNCTIONAL TEST WITH ACTUATOR (yes/no) Yes
40 PAINTING (yes/no) No
41 INSPECTION LEVEL 2, (Note 2, 4)
CERTIFICATION:
42 PRESSURE CONTAINING PARTS EN 10204 3.1, Note 1 Traceability Level 1
43 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
44 PRESSURE TEST Test certificate
45 FIRE TEST to BS EN 12266 N.A.
46 DOUBLE BLOCK AND BLEED TEST N/A
47 FUNCTIONAL TEST WITH ACTUATOR Test certificate
48 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
49 TOTAL VALVE SUPPLY Statement of Compliance, Note 2, 4
Notes: 1. For valves of welded construction, the following additional requirements applies:
- NDE on welds and welding acc. to Code.
- Welding procedure qualification records and NDE records for welds to be incl. in documentation.
2. Inspection Level 1 for rating >PN20 and Inspection Level 2 for rating≤PN20
3. Material certificate EN 10204 3.1
4. For Inspection Level 1 valves, Inspection during fabrication, Release Note shall be issued by Certifying Agency.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11251 SS PLATE CHECK valve Rev. T01.xls]SS PLATE CHECK VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-000-R-11251 Sht 2 of 3
STAINLESS STEEL
Development of Muscat & Salalah International PLATE CHECK VALVE DATA SHEET
50 Table 1: INSPECTION LEVELS
Radiographic and/or Visual/Dimensional
Inspection Valve Dye Pen. Inspection
Ultrasonic Inspection Inspection
level Type Per Table 2
51 Per Table 2 Per Table 2
52 Percent Coverage Percent Coverage Percent Coverage
Cast 100% RT/UT 100% 100% 100% 100% 100%
1 Forged 100% UT 100% 100% 100% 100% 100%
53 Fabricated 100% RT/UT 100% 100% 100% 100% 100%
Cast Nil Nil Nil Nil 100% 100%
2 Forged Nil Nil Nil Nil 100% 100%
54 Fabricated 100% RT/UT All welds All welds All welds 100% 100%
55 Notes: (cont'd)
5. When gas testing is called for, valves shall be subject to shell / body and seat gas pressure tests at
maximum design pressure for 15 minutes.
Testing shall be performed on one valve to qualify other sizes and ratings as per fire test standard BS EN 10045
Testing shall be performed with nitrogen/1% helium mix with external leakage measured with a mass spectrometer.
56 Acceptance criteria shall be: Body / shell: No leakage, Seats: 10 scc / cm. dia. / min
57 6. Where applicable, valves shall have butt weld ends non-destructively tested in accordance with BS 5998, Fig. 1.
58 Table 2: NDE Standards & Acceptance Levels
Testing Acceptance Severity
Standard
59 Activity Criteria Levels
Categories C, D, E
Visual MSS-SP-55 MSS-SP-55
60 not accepted
ASME Shrinkage category
Radiography Annex B
61 B16.34 'C' to be level 2
ASME
Ultrasonic Annex E
62 B16.34
ASME Linear indications
Dye Penetr. Annex D
63 B16.34 12 mm long max.
64
65 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
66 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
67 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
68 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
69 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
70 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
71 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested steel
ii) Vibroetching on alloy or stainless steel or titanium
72 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
73 DOCUMENTATION
74 At Bid stage:
75 Data sheet identified by valve ID and drawings of valve with material listing, dimensions, weight etc.
76 Maximum velocity for the valve.
77 Pressure drop curve.
78
79 Upon Contract:
80 Qualified Welding Procedure Specifications
81 Non Destructive Examination Procedures
82 With Supply:
83 Material Certification Dossier incl. Material Test Records
84 Welding Records
85 Non-Destructive Examination Records
86 As-Built Drawings
87
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11251 SS PLATE CHECK valve Rev. T01.xls]SS PLATE CHECK VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-000-R-11251 Sht 3 of 3
STAINLESS STEEL
Development of Muscat & Salalah International PLATE CHECK VALVE DATA SHEET
88
89 Notes: (cont'd)
90 13. Flow direction shall be clearly marked on both sides of valve body.
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117 Traceability Levels:
Full Traceability: Material shall be uniquely identified and its history tracked from manufacture through stockist to Supplier.
118 I The prcise location shall be defined on Material Placement Record. MPR shall be available for verification by Certifying Authority,
and/or Authorized Inspection Agency, and/or Owner.
Type Traceability: Supplier shall maintain a system to identify material throughout manufacture and ensure
119 II
traceability to a material certificate.
120 III Compliance Traceability: Supplier shall maintain a system of traceability that shall enable issue of Certificate of Compliance.
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11251 SS PLATE CHECK valve Rev. T01.xls]SS PLATE CHECK VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11252 Sht 1 of 3
Communications Piping Class: AG01 & AP01
POTABLE WATER
SMALL BORE STAINLESS STEEL
Development of Muscat & Salalah International Airports GLOBE VALVE DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender ######## PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
DESCRIPTION SPECIFIED VENDOR DATA REV
PLANT SPECIFIC DATA
1 AMBIENT TEMPERATURE °C 0 / +55
2 HUMIDITY
3 ENVIRONMENT
4 AREA CLASSIFICATION
VALVE
5 SERVICE POTABLE WATER
6 TYPE GLOBE
7
8 DESIGN
9 FLUID (Type and phase) WATER,
10 BODY SIZE RANGE / RATING DN15 - DN20, Class 800
11 PRESSURE barg 12.5
12 TEMPERATURE °C -10 / 75
13 STANDARDS / CODES ASME B16.34, BS EN 12266
14 OPERATION HANDWHEEL
15 DIMENSIONAL STANDARD Manufacturer's standard
16 ENDS SCREWED NPT FEMALE
17 BONNET OS&Y, BOLTED
18 STEM OS&Y
19 TRIM SWIVELLING NEEDLE OR PLUG TYPE DISK
20 SEATS RENEWABLE
21 MATERIAL
ASTM A351 Gr. CF8M / A182 Gr. F316/F316L
22 BODY Note 1 (yes/no) NO
BS1504 316 Gr.C16
23 BONNET ASTM A182 Gr. F316SS
24 STEM SS 316
25 BONNET JOINT SPIRAL WOUND SS316+GRAPHITE
26 SEATS SS 316 HARD FACED
27 PACKING GRAPHITE
28
SUPPLEMENTARY REQUIREMENTS:
29 PROTECTION
30 FIRE SAFE BS EN 12266 (yes/no) No
31 ANTI STATIC DEVICE (BS 5146) (yes/no) No
32 NON DESTRUCTIVE TESTING (NDE) (yes/no) Yes
33 PRESSURE RETAINING PARTS (yes/no) Yes
34 NDE PROCEDURE *)
35 ACCEPTANCE CODE SEE TABLE 2
36 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
37 HYDROSTATIC TEST (as per ANSI B16.34) (yes/no) Yes
38 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
39 FUNCTIONAL TEST WITH ACTUATOR (yes/no) N/A
40 PAINTING (yes/no) N/A
41 INSPECTION LEVEL 2
CERTIFICATION:
42 PRESSURE CONTAINING PARTS EN 10204 3.1 Traceability Level 2
43 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
44 PRESSURE TEST Test certificate
45 FIRE TEST to API 6FA N/A
46 DOUBLE BLOCK AND BLEED TEST N/A
47 FUNCTIONAL TEST WITH ACTUATOR N/A
48 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
49 WETTED PARTS CONFORMANCE WITH ANSI/NSF 61 Certificate of Conformance
50 TOTAL VALVE SUPPLY Statement of Compliance
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11252Potable water SS Globe SB valve Rev. T01.xls]PW SS SMALL BORE GLOBE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11252 Sht 2 of 3
Communications Piping Class: AG01 & AP01
POTABLE WATER
SMALL BORE STAINLESS STEEL
Development of Muscat & Salalah International Airports GLOBE VALVE DATA SHEET
51 Table 1: INSPECTION LEVELS
Radiographic and/or Magnetic Particle Visual/Dimensional
Inspection Valve
Ultrasonic Inspection Dye Pen. Inspection Inspection
level Type
52 Per Table 2 Per Table 2 Per Table 2
53 Percent Coverage Percent Coverage Percent Coverage
Cast 100% RT/UT 100% 100% 100% 100% 100%
1 Forged 100% UT 100% 100% 100% 100% 100%
54 Fabricated 100% RT/UT 100% 100% 100% 100% 100%
Cast Nil Nil Nil Nil 100% 100%
2 Forged Nil Nil Nil Nil 100% 100%
55 Fabricated 100% RT/UT All welds All welds All welds 100% 100%
56
57
58
59 Table 2: NDE Standards & Acceptance Levels
Testing Acceptance Severity
Standard
60 Activity Criteria Levels
Categories C, D, E
Visual MSS-SP-55 MSS-SP-55
61 not accepted
ASME Shrinkage category
Radiography Annex B
62 B16.34 'C' to be level 2
ASME
Ultrasonic Annex E
63 B16.34
ASME Linear indications
MPI Annex C
64 B16.34 12 mm long max.
ASME Linear indications
Dye Penetr. Annex D
65 B16.34 12 mm long max.
66 Notes:
67 1. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
68
69 IDENTIFICATION
2. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
70 for nominal diameter.
3. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
71 in the purchase order with lettering 12 mm high.
4. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
72 attached securely with corrosion resistent wire.
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11252Potable water SS Globe SB valve Rev. T01.xls]PW SS SMALL BORE GLOBE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11252 Sht 3 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11252Potable water SS Globe SB valve Rev. T01.xls]PW SS SMALL BORE GLOBE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11253 Sht 1 of 3
65 Notes: (cont'd)
7. Weld
66 repairs of
67 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
68 IDENTIFICATION
Valves shall
9.
be marked
69
as
All per MSS
valves
10.
shall be
70
provided
In addition
11.
each valve
shall be
71
provided
In addition,
12.
each valve
shall be
permanently
72
marked with
73 DOCUMENTATION
74 At Bid stage:
75 Data sheet identified by valve ID and drawings of valve and actuator with material listing, dimensions, weight etc.
76 Maximum velocity for the valve.
77 Details of how the liner is locked into the body, and how it is sealed around the stem.
78 Proof of cavitation check - fully open.
79 Upon Contract:
80 Qualified Welding Procedure Specifications
81 Non Destructive Examination Procedures
82 With Supply:
83 Material Certification Dossier incl. Material Test Records
84 Welding Records
85 Non-Destructive Examination Records
86 As-built Drawings
87
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11253_SS_Ball_valve_Screwed Rev T01.xls]CS BALL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11253 Sht 3 of 3
Communications Piping Class: AP01 & AP02
STAINLESS STEEL
SCREWED BALL VALVE DATA
Development of Muscat & Salalah International Airports
SHEET
88
89
90
91
92
93
94
95
96
97 Notes: (cont'd)
98 13. Supplier shall submit with bid details of lever, hand wheel, and gearbox operators for all valve sizes.
99 14. Valves 8" and larger shall be gear operated.
15. Gear operator shall be totally enclosed waterproof type, packed with suitable lubricant.
100
Thay shall be fitted with one or more easily accessible grease nipples.
16. Valve rotational stops shall be independent of the lever on lever operated valves, i.e. if lever is removed from the valve,
101
the valve shall not be allowed to rotate.
17. To prevent incorrect operation, the mounting of gear operators shall be such that a correct flow passage is assured,
102
and the valve can be fully opened or closed.
103 18. There shall be no possibilty of turning the ball past 90 deg. fully closed or fully open.
104 19. Maximum force to operate valves shall be 350 N.
20. In addition to the above the valves shall be fitted with the gear boxes when the following brake torques are exceeded at
maximum differential pressure across the valve seat:
105
Lever maximum torque 150 Nm with Maximum lever length 450 mm.
Hand wheel maximum torque 150 Nm with Wheel maximum diameter 750 mm.
106 21. Maximum breake out and close torque necessary to operate any valve at max. differential pressure shall not exceed 205 Nm.
107 22. With tha valve in open position levers, if fitted, shall be parallel with the pipe.
108 23. Position indicators shall be provided on non-wrench operated valves. The details of idicator shall be included with the bid.
109 24. Break torque for each valve size shall be verified during test.
110
111
112
113
114
115
116
117 Traceability Levels:
Full Traceability : Material shall be uniquely identified and its history tracked from manufacture through stockist to Supplier.
118 I The prcise location shall be defined on Material Placement Record. MPR shall be available for verification by Certifying
Authority, and/or Authorized Inspection Agency, and/or Owner.
Type Traceability: Supplier shall maintain a system to identify material throughout manufacture and ensure
119 II
traceability to a material certificate.
120 III Compliance Traceability : Supplier shall maintain a system of traceability that shall enable issue of Certificate of Compliance.
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11253_SS_Ball_valve_Screwed Rev T01.xls]CS BALL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11254 Sht 1 of 3
Communications Piping Class: ALL CLASSES
INSTRUMENT ISOLATION
Development of Muscat & Salalah International Airports 2-WAY BALL VALVE DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 0 / +55
2 HUMIDITY
3 ENVIRONMENT
4 AREA CLASSIFICATION
VALVE
5 SERVICE GENERAL
6 TYPE SS BALL VALVE, REDUCED PORT
7
8 DESIGN
9 FLUID (Type and phase) WATER,
10 BODY SIZE RANGE / RATING ½" to 1½", PN16
11 BALL FREE SWIVELING
12 TRIM CONSTRUCTION ROTATING STEM
13 STANDARDS / CODES ASME B1.20.1
14 OPERATION 1/4 TURN, HAND LEVER
15 FLOW PATTERN ON-OFF (2-WAY)
16 ENDS THREADED NPT(F) OR TUBE ENDS
17 BODY BOLTED
18 STEM ADJUSTABLE STEM PACKING
19 MATERIAL
ASTM A276 Gr. 316/316L / A351 Gr.CF3M
20 BODY Note 1 (yes/no) No
BS 1504 316 C16 /BS970 316 S16
21 BALL ASTM A276 Gr. 316 / BS 970 316 S16
22 STEM ASTM A276 Gr. 316 / BS 970 316 S16
23 SEAT RING ASTM A276 Gr. 316 / BS 970 316 S16
24 STEM SEALS REINFORCED PTFE
25 SEATS REINFORCED PTFE
26 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
SUPPLEMENTARY REQUIREMENTS:
27 PROTECTION
28 FIRE SAFE BS EN 12266 No (yes/no)
29 ANTI STATIC DEVICE (BS 5146) No (yes/no)
30 NON DESTRUCTIVE TESTING (NDE) Yes (yes/no)
31 PRESSURE RETAINING PARTS Yes (yes/no)
32 NDE PROCEDURE *)
33 ACCEPTANCE CODE SEE TABLE 2
34 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
35 HYDROSTATIC TEST (as per BS EN 12266) (yes/no) Yes
36 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
37 FUNCTIONAL TEST WITH ACTUATOR (yes/no) N/A
38 PAINTING (yes/no) No
39 INSPECTION LEVEL 2, (Note 2, 4)
CERTIFICATION:
40 PRESSURE CONTAINING PARTS EN 10204 3.1, Note 1 Traceability Level 2
41 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
42 PRESSURE TEST Test certificate
43 FIRE TEST to BS EN 12266 N/A
44 DOUBLE BLOCK AND BLEED TEST N/A
45 FUNCTIONAL TEST WITH ACTUATOR N/A
46 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
47 TOTAL VALVE SUPPLY Statement of Compliance, Note 2, 4
Notes: 1. For valves of welded construction, the following additional requirements applies:
- NDE on welds and welding acc. to Code.
- Welding procedure qualification records and NDE records for welds to be incl. in documentation.
2. Inspection Level 1 for rating >PN20 and Inspection Level 2 for rating ≤PN20
3. Material certificate EN 10204 3.1
4. For Inspection Level 1 valves, Inspection during fabrication, Release Note shall be issued by Certifying Agency.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11254 Instrument isolation Ball valve Rev. T01.xls]INSTR. ISOLATION BALL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11254 Sht 2 of 3
Communications Piping Class: ALL CLASSES
INSTRUMENT ISOLATION
Development of Muscat & Salalah International Airports 2-WAY BALL VALVE DATA SHEET
48 Table 1: INSPECTION LEVELS
Radiographic and/or Visual/Dimensional
Inspection Valve Dye Pen. Inspection
Ultrasonic Inspection Inspection
level Type Per Table 2
49 Per Table 2 Per Table 2
50 Percent Coverage Percent Coverage Percent Coverage
Cast 100% RT/UT 100% 100% 100% 100% 100%
1 Forged 100% UT 100% 100% 100% 100% 100%
51 Fabricated 100% RT/UT 100% 100% 100% 100% 100%
Cast Nil Nil Nil Nil 100% 100%
2 Forged Nil Nil Nil Nil 100% 100%
52 Fabricated 100% RT/UT All welds All welds All welds 100% 100%
53 Notes: (cont'd)
5. When gas testing is called for, valves shall be subject to shell / body and seat gas pressure tests at
maximum design pressure for 15 minutes.
Testing shall be performed on one valve to qualify other sizes and ratings as per fire test standard BS EN 12266
Testing shall be performed with nitrogen/1% helium mix with external leakage measured with a mass spectrometer.
54 Acceptance criteria shall be: Body / shell: No leakage, Seats: 10 scc / cm. dia. / min
55 6. Where applicable, valves shall have butt weld ends non-destructively tested in accordance with BS 5998, Fig. 1.
56 Table 2: NDE Standards & Acceptance Levels
Testing Acceptance Severity
Standard
57 Activity Criteria Levels
Categories C, D, E
Visual MSS-SP-55 MSS-SP-55
58 not accepted
ASME Shrinkage category
Radiography Annex B
59 B16.34 'C' to be level 2
ASME
Ultrasonic Annex E
60 B16.34
ASME Linear indications
Dye Penetr. Annex D
61 B16.34 12 mm long max.
62
63 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
64 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
65 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
66 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
67 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
68 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
69 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested carbon steel
ii) Vibroetching on alloy or stainless steel or titanium
70 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
71 DOCUMENTATION
72 At Bid stage:
73 Data sheet identified by valve ID and drawings of valve and actuator with material listing, dimensions, weight etc.
74 Maximum velocity for the valve.
75 Details of how the liner is locked into the body, and how it is sealed around the stem.
76 Proof of cavitation check - fully open.
77 Upon Contract:
78 Qualified Welding Procedure Specifications
79 Non Destructive Examination Procedures
80 With Supply:
81 Material Certification Dossier incl. Material Test Records
82 Welding Records
83 Non-Destructive Examination Records
84 As-built Drawings
85
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11254 Instrument isolation Ball valve Rev. T01.xls]INSTR. ISOLATION BALL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11254 Sht 3 of 3
INSTRUMENT ISOLATION
Development of Muscat & Salalah International Airports 2-WAY BALL VALVE DATA SHEET
86
87
88
89
90
91
92
93
94
95 Notes: (cont'd)
96 13. Supplier shall submit with bid details of lever, hand wheel, and gearbox operators for all valve sizes.
97 14. Valves 8" and larger shall be gear operated.
15. Gear operator shall be totally enclosed waterproof type, packed with suitable lubricant.
98
Thay shall be fitted with one or more easily accessible grease nipples.
16. Valve rotational stops shall be independent of the lever on lever operated valves, i.e. if lever is removed from the valve,
99
the valve shall not be allowed to rotate.
17. To prevent incorrect operation, the mounting of gear operators shall be such that a correct flow passage is assured,
100
and the valve can be fully opened or closed.
101 18. There shall be no possibilty of turning the ball past 90 deg. fully closed or fully open.
102 19. Maximum force to operate valves shall be 350 N.
20. In addition to the above the valves shall be fitted with the gear boxes when the following brake torques are exceeded at maximum
differential pressure across the valve seat:
103
Lever maximum torque 150 Nm with Maximum lever length 450 mm.
Hand wheel maximum torque 150 Nm with Wheel maximum diameter 750 mm.
104 21. Maximum breake out and close torque necessary to operate any valve at max. differential pressure shall not exceed 205 Nm.
105 22. With tha valve in open position levers, if fitted, shall be parallel with the pipe.
106 23. Position indicators shall be provided on non-wrench operated valves. The details of idicator shall be included with the bid.
107 24. Break torque for each valve size shall be verified during test.
108
109
110
111
112
113
114
115 Traceability Levels:
Full Traceability : Material shall be uniquely identified and its history tracked from manufacture through stockist to Supplier.
116 I The prcise location shall be defined on Material Placement Record. MPR shall be available for verification by Certifying Authority,
and/or Authorized Inspection Agency, and/or Owner.
Type Traceability: Supplier shall maintain a system to identify material throughout manufacture and ensure
117 II
traceability to a material certificate.
118 III Compliance Traceability : Supplier shall maintain a system of traceability that shall enable issue of Certificate of Compliance.
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11254 Instrument isolation Ball valve Rev. T01.xls]INSTR. ISOLATION BALL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11255 Sht 1 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11255 GENERIC PSV Rev. T01.xls]PSV-XXXX
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11255 Sht 3 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11255 GENERIC PSV Rev. T01.xls]PSV-XXXX
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11256 Sht 1 of 1
Communications Piping Class: N.A.
RUBBER BELLOW
FLEXIBLE JOINT
Development of Muscat & Salalah International Airports
DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ NHA KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D APPR'D COUNTRY OF ORIGIN *)
ID DESCRIPTION SPECIFIED VENDOR DATA REV
PLANT SPECIFIC DATA
1 AMBIENT TEMPERATURE °C 0 /+55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
5 PROCESS SPECIFIC DATA
6 EROSIVE SERVICE (YES/NO) NO
7 SERVICE EQUIPMENT CONNECTIONS
8
9 DESIGN SPECIFIC DATA
10 DESIGN CODE EN 13480, ISO 4126
11 NOMINAL SIZE REFER TO EXPANSION JOINT SCHEDULE
12 AVAILABLE BUILD-IN LENGTH (mm) REFER TO EXPANSION JOINT SCHEDULE
13 FLANGES BS EN 1092-1, Type 11, RF B1
14 DESIGN PRESSURE (barg) 16
15 DESIGN TEMPERATURE (deg C) 0 /75
16 CORROSION ALLOWANCE (mm) NIL
17 BELLOWS DOUBLE SPHERE WITH REINFORCING RING
18 BACKING FLANGE SPLIT, INTERLOCKED
19 CONTROL RODS WITH OVERSIZE SPHERICAL WASHERS
AND RUBBER BUSHINGS
20 NUMBER OF CONTROL RODS *)
21
22 MINIMUM ALLOWABLE MOVEMENTS
23 ANGULAR (deg) REFER TO EXPANSION JOINT SCHEDULE
24 ELONGATION (mm) REFER TO EXPANSION JOINT SCHEDULE
25 COMPRESSION (mm) REFER TO EXPANSION JOINT SCHEDULE
26 TRANSVERSE (mm) REFER TO EXPANSION JOINT SCHEDULE
27 MATERIAL SPECIFIC DATA
28 BELLOWS
KEVLAR CORD REIFORCED EPDM
WITH MOULDED-IN SOLID STEEL
RETENTION RINGS AND REINFORCING RING
29 BACKING FLANGE A351 CF8M / BS 1504 316 C16
30 CONTROL RODS A276 GR. 316 / BS 970 316 S16
31
32 INSPECTION AND TEST
33 HYDROSTATIC TEST PRESSURE ACCORDING TO CODE
34 OTHER TESTING
35 WELDING 100% ULTRASONIC
36
37 CERTIFICATION TO EN 10204
38 MATERIALS 3.1
39 PRESSURE TEST STATEMENT OF COMPLIANCE
40 WETTED PARTS CONFORMANCE WITH ANSI/NSF 61 Yes/No NO
41 TOTAL SUPPLY STATEMENT OF COMPLIANCE
42
43
44
45
46
47
48 NOTES
49
50
51
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
Path: C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11256 Rubber expansion bellow Rev. T01.xls]DSsht.1
Sultanate of Oman
Ministry of Transport &
Doc. Number: AL-905-P-11257 Sht. 1 / 1 Rev.
Communications Piping Class: AC02
Path: C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11257 Hot formed bend Rev. T01.xls]DSsht.1
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11258 Sht. 1 / 1 Rev.
Piping Class: AC02
Communications
Path: C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11258 Isolating Coupling Rev. T01.xls]DSsht.1
Sultanate of Oman
Ministry of Transport & DOC. Number.: AL-905-P-11259 Sht: 1 / 1 Rev
Piping Class: AC02
Communications
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV. DESCRIPTION DATE PREP'D CHK'D APP'D APP'D COUNTRY OF ORIGIN *)
LI. NO: DESCRIPTION SPECIFIED VENDOR DATA *) Rev
1 INSTALLATION / PROCESS DATA
2 SERVICE General 2
3 MAX. OPERATING PRESSURE (barg) 12.5
4 TEMPERATURE RANGE (deg C) 0 / 55
5 INSTALLATION / LOCATION INDOOR, BELOW GROUND
6 SOUR SERVICE - NACE MR0175 (YES/NO) NO
7 EROSIVE SERVICE (YES/NO) NO
8
9
10 DESIGN SPECIFIC DATA
11 DESIGN CODE EN 13480 / ASME B16.34
12 NOMINAL SIZE REFER TO PURCHASE ORDER
13 PRESSURE RATING PN 16
14 FACE TO FACE DIMENSIONS BS EN 558-1, Basic series 1
15 FLANGES BS EN 1092-1, Type 11, RF B1
16 DESIGN PRESSURE (barg) 16
17 DESIGN TEMPERATURE (deg C) -10 /75
18 CORROSION ALLOWANCE (mm) 1.3
19 MESH SIZE (mm) 1.0
20 PRESSURE INSTRUMENT CONNECTIONS HOLD
21 DRAIN VALVE Yes / No Yes ref. AL-905-P-11245 2
22
23
24 MATERIAL SPECIFIC DATA
25 BODY A216 GR. WCB
26 SCREEN SS316
27 COVER A216 GR . WCB / A105
28 GASKET SS316 + GRAPHITE
29 PLUG, BOSSES A105
30 BOLTING A193 GR. B7 / A194 GR. 2H
31
32 INSPECTION AND TEST
33 HYDROSTATIC TEST PRESSURE ACCORDING TO CODE
34 OTHER TESTING MPI ON BODY AND COVER
35 WELDING 100% ULTRASONIC
36
37 CERTIFICATION TO EN 10204
38 MATERIALS 3.1
39 TOTAL SUPPLY STATEMENT OF COMPLIANCE
40
41
42 NOTES
43
44
45
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
Path: C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11262 Y-Strainer Rev T01.xls]DSsht.1
Sultanate of Oman
Ministry of Transport &
Doc. Number: AL-905-P-11262 Sht 2 of 2
Communications
Piping Class: AC01 & AC02
Path: C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11262 Y-Strainer Rev T01.xls]DSsht.1
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11263 Sht 1 of 3
Communications Piping Class: AC01 & AC02
DATA SHEET
Development of Muscat & Salalah International Airports COMMISSIONING SET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LAH KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR*D APPR*D COUNTRY OF ORIGIN *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
VALVE
5 SERVICE (Located at) CHILLED WATER
CS BUTTERFLY VALVE COMPLETE WITH
6 TYPE
METERING STATION
7
8
9 DESIGN BS EN 593
10 FLUID (Type and phase) WATER,
11 BODY SIZE RANGE / RATING DN50-DN300, PN 16
12 PRESSURE barg 12.5
13 TEMPERATURE °C -10 / 75
14 STANDARDS / CODES ASME B16.34, BS EN 12266
15 OPERATION DOUBLE REGULATING GEAR OPERATION
16 VALVE DIMENSIONAL STANDARD BS EN 558-1 / ASME B16.10 T9, C 3 & 4
17 ENDS BS EN 1092-1 Type 11, RF B1
18 BODY Fully Lugged, Lugs tapped ISO 261/262
19 STEM ANTI-BLOW-OUT PROOF
20 MATERIALS
21 BODY Note 1 (yes/no) ASTM A216 Gr WCB / BS 1504-161 Gr. 480 No
22 DISC ASTM A182 Gr. F316L / BS 1503 316 S11
23 STEM ASTM A182 Gr. F316L / BS 1503 316 S11
24 SEAL RETAIN RING ASTM A182 Gr. F316L / BS 1503 316 S11
25 STEM SEALS GRAPHITE
26 ORIFICE PLATE STAINLESS STEEL
27 RETAINING RING STAINLESS STEEL
SUPPLEMENTARY REQUIREMENTS:
28 PROTECTION
29 FIRE SAFE BS EN ISO 12266 Yes (yes/no)
30 ANTI STATIC DEVICE (BS 5146) Yes (yes/no)
31 NON DESTRUCTIVE TESTING (NDE) Yes (yes/no)
32 PRESSURE RETAINING PARTS Yes (yes/no)
BS EN 12266-1
33 NDE PROCEDURE *)
34 ACCEPTANCE CODE SEE TABLE 2
35 CHARPY IMPACT TEST acc. to BS EN 10045 (yes/no) No
36 HYDROSTATIC TEST (as per BS EN 12266) (yes/no) Yes, Body: 18,8 barg, Seats 6 barg. Soft seated min. 15 minutes up to DN300
37 TEST AS DOUBLE BLOCK AND BLEED (yes/no) N/A
38 FUNCTIONAL TEST WITH ACTUATOR (yes/no) N/A
39 PAINTING (yes/no) Yes See page 3.
40 INSPECTION LEVEL 2, (Note 2, 4)
CERTIFICATION:
41 PRESSURE CONTAINING PARTS EN 10204 3.1, Note 1 Traceability Level 1
42 OTHER WETTED PARTS / NON-PRESSURE PARTS EN 10204 2.2 Traceability Level 3
43 PRESSURE TEST Test certificate
44 FIRE TEST TO BS EN 12266 Test certificate
45 DOUBLE BLOCK AND BLEED TEST N/A
46 FUNCTIONAL TEST WITH ACTUATOR N/A
47 ELECTRICAL AND NON-ELECTRICAL CERTIFICATION N/A
48 TOTAL ASSEMBLY Statement of Compliance, Note 2, 4
Notes: 1. For valves of welded construction, the following additional requirements applies:
- Carbon equivalent shall be determined according to: CE=C+Mn/6+0,04 or CE=C+Mn/6+(Cr+Mo+V)/5+(Cu+Ni)/15
- NDE on welds and welding acc. to Code.
- Welding procedure qualification records and NDE records for welds to be incl. in documentation.
2. Inspection Level 1 for rating >PN20 and Inspection Level 2 for rating ≤PN20
3. Material certificate EN 10204 3.1
4. For Inspection Level 1 valves, Inspection during fabrication, Release Note shall be issued by Certifying Agency.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11263_Commissioning_set Rev. T01.xls]Lined butterfly valve
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11263 Sht 2 of 3
DATA SHEET
Development of Muscat & Salalah International Airports COMMISSIONING SET
49 Table 1: INSPECTION LEVELS
Radiographic and/or Magnetic Particle Visual/Dimensional
Inspection Valve
Ultrasonic Inspection Dye Pen. Inspection Inspection
level Type
50 Per Table 2 Per Table 2 Per Table 2
51 Percent Coverage Percent
Coverage Percent Coverage
Cast 100% RT/UT 100% 100% 100% 100% 100%
1 Forged 100% UT 100% 100% 100% 100% 100%
52 Fabricated 100% RT/UT 100% 100% 100% 100% 100%
Cast Nil Nil Nil Nil 100% 100%
2 Forged Nil Nil Nil Nil 100% 100%
53 Fabricated 100% RT/UT All welds All welds
All welds 100% 100%
54 Notes: (cont'd)
5. When gas testing is called for on Valve Data Sheet, valves shall be subject to shell / body and seat gas pressure tests at
maximum design pressure for 15 minutes.
Testing shall be performed on one valve to qualify other sizes and ratings as per fire test standard BS 6755 Pt. 2
Testing shall be performed with nitrogen/1% helium mix with external leakage measured with a mass spectrometer.
55 Acceptance criteria shall be: Body / shell: No leakage, Seats: 10 scc / cm. dia. / min
56 6. Where applicable, valves shall have butt weld ends non-destructively tested in accordance with BS 5998, Fig. 1.
57 Table 2: NDE Standards & Acceptance Levels
Testing Acceptance Severity
Standard
58 Activity Criteria Levels
Categories C, D, E
Visual MSS-SP-55 MSS-SP-55
59 not accepted
ASME Shrinkage category
Radiography Annex B
60 B16.34 'C' to be level 2
ASME
Ultrasonic Annex E
61 B16.34
ASME Linear indications
MPI Annex C
62 B16.34 12 mm long max.
ASME Linear indications
Dye Penetr. Annex D
63 B16.34 12 mm long max.
64 Notes: (cont'd)
7. Weld repairs of castings shall be in accordance with welding procedures and qualification test records complying with ASME IX
65 and reviewed by the Purchaser prior to use, NDE and acceptance levels as per Table 2.
66 8. Cracks, hot tears, planar defects and all defects exceeding the severity levels in Table 2 shall be unacceptable.
67 IDENTIFICATION
9. Valves shall be marked as per MSS SP-25 using bar (gauge) and °C units for pressure and temperature and inches
68 for nominal diameter.
10. All valves shall be provided with a stainless steel tag plate securely attached to the valve showing the Tag No. referenced
69 in the purchase order with lettering 12 mm high.
11. In addition each valve shall be provided with non-corrodible metal tag 50mm x 20mm with the Purchase Order Number,
Item Number, Inspection Release Certificate Number and Heat Number stamped in the metal tag
70 attached securely with corrosion resistent wire.
12. In addition, each valve shall be permanently marked with the Inspection Release Certificate Number and Heat Number by:
i) Light stamping (low stress or dot stamps) on non-impact tested carbon steel
ii) Vibroetching on alloy or stainless steel or titanium
71 iii) Etching on impact tested carbon steel or (i) above prior to final heat treatment
72 DOCUMENTATION
73 At Bid stage:
74 Data sheet identified by component ID and drawings of valve and assembly with material listing, dimensions, weight etc.
75 Maximum velocity for the assembly.
76 Proof of cavitation check - fully open.
77
78 Upon Contract:
79 Qualified Welding Procedure Specifications
80 Non Destructive Examination Procedures
81 With Supply:
82 Material Certification Dossier incl. Material Test Records
83 Welding Records
84 Non-Destructive Examination Records
85 As-built Drawings
86
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11263_Commissioning_set Rev. T01.xls]Lined butterfly valve
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11263 Sht 3 of 3
Communications Piping Class: AC01 & AC02
DATA SHEET
Development of Muscat & Salalah International Airports COMMISSIONING SET
87
88
89
90
91
92
93
94
95
96 Notes: (cont'd)
97 13. Supplier shall submit with bid details of hand wheel and gearbox operators for all valve sizes.
98 14. Butterfly valve shall be equipped with double regulating gear.
15. Gear operator shall be totally enclosed waterproof type, packed with suitable lubricant.
99
Thay shall be fitted with one or more easily accessible grease nipples.
16. To prevent incorrect operation, the mounting of gear operators shall be such that a correct flow passage is assured,
100
and the valve can be fully opened or closed.
101 17. There shall be no possibilty of turning the disk past 90 deg. fully closed or fully open.
102 18. Maximum force to operate valves shall be 350 N.
In addition to the above the valves shall be fitted with the gear boxes when the following brake torques are exceeded at maximum
103 19. differential pressure across the valve seat:
Hand wheel maximum torque 150 Nm with Wheel maximum diameter 750 mm.
104 20. Maximum breake out and close torque necessary to operate any valve at max. differential pressure shall not exceed 205 Nm.
105 21. Position indicators shall be provided on non-wrench operated valves. The details of idicator shall be included with the bid.
106 22. Break torque for each valve size shall be verified during test.
107
108
109
Dry Film Thickness
110 PAINTING Class Material Color
min. (micron)
Two pack epoxy
111 First coat 100 Contrast
barrier coat
Acrylic polyurethane RAL 9002,
112 Second coat 50
topcoat Gray White
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11263_Commissioning_set Rev. T01.xls]Lined butterfly valve
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11264 Sht 1 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11264_CS_DP_CV Rev T01.xls]DIFF. PRESS. CONTROL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11264 Sht 3 of 3
100
101
102
103
104
105
106
107
108
109
Dry Film Thickness
110 PAINTING Class Material Color
min. (micron)
Two pack epoxy
111 First coat 100 Contrast
barrier coat
Acrylic polyurethane RAL 9002,
112 Second coat 50
topcoat Gray White
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11264_CS_DP_CV Rev T01.xls]DIFF. PRESS. CONTROL VALVE
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11265 Sht 1 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11265_MAG_FLOWMETER Rev T01.xls]MAG FLOWMETER
Sultanate of Oman
Ministry of Transport & Doc. Number: AL--905-P-11265 Sht 3 of 3
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11265_MAG_FLOWMETER Rev T01.xls]MAG FLOWMETER
Sultanate of Oman
Ministry of Transport &
Doc. Number: AL-905-P-11266 Sht 1 of 1
Communications
DATA SHEET
Development of Muscat & Salalah International Airports PRESSURE GAUGE
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ OSM KWM NIER MANUFACT. & MODEL NO.*)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
EQUIPMENT SPECIFIC DATA
5 SERVICE (Located at) Chilled water system
6
7
8 DESIGN MANUFACTURER
9 FLUID (Type and phase) Water
10 PRESSURE bar(g) 12.5
11 TEMPERATURE °C 75
12 ELEMENT TYPE Bourdon
13 BLOW OUT PROTECTION Solid front and full blow-out at back
14 ACCURACY Certified Class 1 acc. to EN837
15 SCALE 1.25* Maximum scale value
16 CALIBRATED RANGE bar(g) 0-15
17 OVERRANGE PROTECTION > or = DESIGN PRESSURE
18 DIAL SIZE mm 100
19 DIAL COLOUR White
20 DIAL MARKING (Dual scale Bar + PSI) Black / Red
21 FILL Glycerine
22
23 MATERIAL
24 HOUSING 316L SS
25 BOLTING 316L SS
26 SOCKET 316L SS
27 LENS Shatterproof glass
28
29
30 CONNECTION ½" NPT
31
32
33
34
35
36
37
38
39
40
41
42
43
44 IDENTIFICATION
45 TAG NO SS Tag engraved or screwed on body
46
47 CERTIFICATION
48 PRESSURE RETAINING PARTS EN 10204 2.1
49 ELECTRICAL N.A.
50 TOTAL SUPPLY Statement of Compliance
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11266_Pressure_gauge Rev T01.xls]Press. Gauge
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11267 Sht 1 of 1
Communications Piping Class: N.A.
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11270_Pressure_transmitter Rev T01.xls]Press. Transmitter
Sultanate of Oman
Ministry of Transport &
Doc. Number: AL-905-P-11271 Sht 1 of 1
Communications
DATA SHEET
PRESSURE DIFFERENTIAL
Development of Muscat & Salalah International Airports TRANSMITTER
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LVHA KWM NIER MANUFACT. & MODEL NO.*)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
EQUIPMENT SPECIFIC DATA
5 SERVICE (Located at) Chilled water system
6 TYPE Smart Type
7
8 DESIGN
9 FLUID (Type and phase) Water
10 PRESSURE barg 16
11 TEMPERATURE °C -10 / 75
12 ELEMENT TYPE Diaphragm, Capacitive cell
13 CALIBRATED RANGE barg 1-15
14 ACCURACY Certified Class 1 acc. to EN 837
15 REPEATABILITY +/- 0.1%
16 SPAN AND ZERO ADJ. ( ext. / int. ) External
17 OVERRANGE PROTECTION > or = DESIGN PRESSURE
18 OUTPUT LIMITATION *)
19 REVERSE POLARITY PROTECTION Yes
20
21 MATERIAL
22 BODY 316L SS
23 BOLTING 316L SS
24 ELEMENT Hastelloy C-276 / INCONEL or Equal
25 ENCLOSURE 316 SS
26 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
27 CONNECTION
28 ELECTRICAL M20*1,5 mm ISO INT.
29 PROCESS ½" NPT Female
30
31
32 MOUNTING (2" yoke with backplate and bolts)
33
34 FLANGE MOUNTED 2-VALVE MANIFOLD No
35
36 PROTECTION
37 ENCLOSURE Min. IP55
38 ELECTRICAL N.A.
39
40 TRANSMISSION
41 SUPPLY 24 VDC
42 SIGNAL 4-20 mA, HART protocol
43 OUTPUT METER Yes
44
45 IDENTIFICATION
46 TAG NO SS Tag engraved or screwed on body
47
48 CERTIFICATION
49 PRESSURE RETAINING PARTS EN 10204 2.1
50 ELECTRICAL N.A.
51 TOTAL SUPPLY Statement of Compliance
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11271_Pressure_DIFF_transmitter Rev T01.xls]Press. Diff. Transmitter
Sultanate of Oman
Ministry of Transport &
Doc. Number: AL-905-P-11272 Sht 1 of 1
Communications
PRESSURE SWITCH
Development of Muscat & Salalah International Airports DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ OSM KWM NIER MANUFACT. & MODEL NO.*)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
EQUIPMENT SPECIFIC DATA
5 SERVICE (Located at) Chilled water system
6 CONFIGURATION Dual setpoint
7
8 DESIGN MANUFACTURER
9 FLUID (Type and phase) Water
10 PRESSURE bar(g) 12.5
11 TEMPERATURE °C 75
12 ELEMENT TYPE Diaphragm, Capacitive cell
13 CALIBRATED ADJUSTABLE RANGE bar(a) 0.03 - 1.2
14 ACCURACY +/- 0.5% max cal. range
15 REPEATABILITY +/- 0.1%
16 SPAN AND ZERO ADJ. ( ext. / int. ) External
17 OVERRANGE PROTECTION > or = DESIGN PRESSURE
18 OUTPUT LIMITATION *)
19 REVERSE POLARITY PROTECTION Yes
20 MATERIAL
21 HOUSING 316L SS
22 BOLTING 316L SS
23 ELEMENT Hastelloy C-276 / INCONEL or Equal
24 COVER 316 SS, TAMPER PROOF
25 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
26 CONNECTION
27 ELECTRICAL M20*1,5 mm ISO INT.
28 PROCESS ½" NPT Female
29
30
31 MOUNTING (2" yoke with backplate and bolts)
32
33 FLANGE MOUNTED 2-VALVE MANIFOLD No
34
35 PROTECTION
36 ENCLOSURE Min. IP55
37 ELECTRICAL N.A.
38
39 TRANSMISSION
40 SUPPLY 24 VDC
41 SIGNAL SPDT, volt-free contact
42 OUTPUT METER Yes
43
44 IDENTIFICATION
45 TAG NO SS Tag engraved or screwed on body
46
47 CERTIFICATION
48 PRESSURE RETAINING PARTS EN 10204 2.1
49 ELECTRICAL N.A.
50 TOTAL SUPPLY Statement of Compliance
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11272_Pressure_switch Rev T01.xls]Press. Transmitter
Sultanate of Oman
Ministry of Transport &
Doc. Number: AL-905-P-11273 Sht 1 of 1
Communications
FLOW SWITCH
Development of Muscat & Salalah International Airports DATA SHEET
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ OSM KWM NIER MANUFACT. & MODEL NO.*)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
EQUIPMENT SPECIFIC DATA
5 SERVICE (Located at) Chilled water system
6 CONFIGURATION Dual setpoint
7
8 DESIGN MANUFACTURER
9 FLUID (Type and phase) Water
10 PRESSURE bar(g) 12.5
11 TEMPERATURE °C 75
12 ELEMENT TYPE Diaphragm, Capacitive cell
13 CALIBRATED ADJUSTABLE RANGE bar(a) 0.03 - 1.2
14 ACCURACY +/- 0.5% max cal. range
15 REPEATABILITY +/- 0.1%
16 SPAN AND ZERO ADJ. ( ext. / int. ) External
17 OVERRANGE PROTECTION > or = DESIGN PRESSURE
18 OUTPUT LIMITATION *)
19 REVERSE POLARITY PROTECTION Yes
20 MATERIAL
21 HOUSING 316L SS
22 BOLTING 316L SS
23 ELEMENT Hastelloy C-276 / INCONEL or Equal
24 COVER 316 SS, TAMPER PROOF
25 SOUR SERVICE (NACE-MR-01-75) (yes/no) No
26 CONNECTION
27 ELECTRICAL M20*1,5 mm ISO INT.
28 PNEUMATIC ¼" NPT
29 PROCESS ½" NPT Female
30
31 MOUNTING (2" yoke with backplate and bolts)
32
33 FLANGE MOUNTED 2-VALVE MANIFOLD No
34
35 PROTECTION
36 ENCLOSURE Min. IP55
37 ELECTRICAL N.A.
38
39 TRANSMISSION
40 SUPPLY 24 VDC
41 SIGNAL 4-20 mA, HART protocol
42 OUTPUT METER Yes
43
44 IDENTIFICATION
45 TAG NO SS Tag engraved or screwed on body
46
47 CERTIFICATION
48 PRESSURE RETAINING PARTS EN 10204 2.1
49 ELECTRICAL N.A.
50 TOTAL SUPPLY Statement of Compliance
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11273_Flow_switch Rev T01.xls]Press. Transmitter
Sultanate of Oman
Ministry of Transport &
Doc. Number: AL-905-P-11274 Sht 1 of 1
Communications
DATA SHEET
Development of Muscat & Salalah International Airports ULTRASONINC LEVEL TRANSMITTER
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LVHA KWM NIER MANUFACT. & MODEL NO.*)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
EQUIPMENT SPECIFIC DATA
5 SERVICE (Located at) Chilled water system
6 TYPE Ultrasonic, Narrow beam
7
8 DESIGN
9 FLUID (Type and phase) Water
10 PRESSURE RATING barg 2
11 TEMPERATURE RATING °C 0 / 80
12 TEMPERATURE COMPENSATION Automatic
13 CALIBRATED RANGE Metres 20
14 DEAD BAND Metres 0.5
15 ACCURACY +/- 0.25% calibrated range
16 BEAM WIDTH cm *)
17 BEAM ANGLE ° *)
18 MEMORY Non-volatile
19 CALIBRATION Target, calibration wire
20 LOCAL DISPLAY Yes/No Yes
21
22
23
24
25 MATERIAL
26 HOUSING 316L SS
27 TRANSDUCER 316L SS
28 SEALS EPDM
29
30
31 CONNECTION
32 ELECTRICAL M20*1,5 mm ISO INT.
33 PROCESS CONNECTION Flange 150# Size vendor to advise
34
35
36 PROTECTION
37 ENCLOSURE Min. IP55
38 ELECTRICAL N.A.
39
40 TRANSMISSION
41 SUPPLY 24 VDC
42 SIGNAL 4-20 mA, HART protocol
43 OUTPUT METER Yes
44
45 IDENTIFICATION
46 TAG NO SS Tag engraved or screwed on housing
47
48 CERTIFICATION
49 PRESSURE RETAINING PARTS EN 10204 2.1
50 ELECTRICAL N.A.
51 TOTAL SUPPLY Statement of Compliance
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11274_US_Level_transmitter Rev T01.xls]Level Transmitter
Sultanate of Oman
Ministry of Transport &
Doc. Number: AL-905-P-11275 Sht 1 of 1
Communications
DATA SHEET
RADIO CAPACITANCY
Development of Muscat & Salalah International Airports LEVEL SWITCH
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LVHA KWM NIER MANUFACT. & MODEL NO.*)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D COUNTRY OF ORIGIN
APPR'D *)
PLANT SPECIFIC DATA REV
DESCRIPTION SPECIFIED VENDOR DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
EQUIPMENT SPECIFIC DATA
5 SERVICE (Located at) Chiolled water system
6 TYPE Radio frequency balanced impedance bridge
7
8 DESIGN
9 FLUID (Type and phase) Water
10 PRESSURE RATING barg 2
11 TEMPERATURE RATING °C 0 / 80
12 TEMPERATURE COMPENSATION Automatic
13 CALIBRATION On-board
14 FUSE mA On-board *)
15 FAIL SAFE Selectable, high or low level
16 RF Frequency *)
17 PROBE LENGTH Metres 0.15
18
19
20
21
22
23
24
25 MATERIAL
26 HOUSING 316L SS
27 PROBE 316L SS
28 SEALS Viton
29
30
31 CONNECTION
32 ELECTRICAL M20*1,5 mm ISO INT.
33 TANK ENTRY 3/4" NPT
34
35
36 PROTECTION
37 ENCLOSURE Min. IP55
38 ELECTRICAL N.A.
39
40 TRANSMISSION
41 SUPPLY 240 VAC / 24 VDC
42 SIGNAL SPDT, volt-free contact
43
44
45 IDENTIFICATION
46 TAG NO SS Tag engraved or screwed on housing
47
48 CERTIFICATION
49 PRESSURE RETAINING PARTS EN 10204 2.1
50 ELECTRICAL N.A.
51 TOTAL SUPPLY Statement of Compliance
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11275_RF_Level_switch Rev T01.xls]RF Level Switch
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11277 Sheet 1 of 1
Communications Piping Class: AC01 & AC02
DATA SHEET
Development of Muscat & Salalah International Airports AUTOMATIC AIR VENT
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ NHA KWM NIER MANUFACT. & MODEL NO. *)
REV. DESCRIPTION DATE PREP'D CHK'D APP'D APP'D COUNTRY OF ORIGIN *)
LI. NO: DESCRIPTION SPECIFIED VENDOR DATA *)
1 INSTALLATION / PROCESS DATA
2 SERVICE CHILLED WATER SYSTEMS
3 MAX. OPERATING PRESSURE (barg) 12.5
4 TEMPERATURE RANGE (°C) 0 / 55
5 INSTALLATION / LOCATION INDOOR
6 SOUR SERVICE - NACE MR0175 (YES/NO) NO
7 EROSIVE SERVICE (YES/NO) NO
8
9
10 DESIGN SPECIFIC DATA
11 DESIGN CODE EN 13480 / ASME B31.3
12 NOMINAL CAPACITY @ 21°C (l/s) 90
13 PRESSURE RATING PN 16
14 CONNECTIONS ¾" MALE NPT
15 DESIGN PRESSURE (barg) 16
16 DESIGN TEMPERATURE (°C) 0 /75
17 CORROSION ALLOWANCE (mm) NIL
18 ISOLATION VALVE Yes / No YES, BALL TYPE
19
20
21
22
23 MATERIAL SPECIFIC DATA
24 BODY AISI 316 Ti (CrNi 1.4571)
25 FLOAT AISI 316 Ti (CrNi 1.4571)
26 COVER AISI 316 Ti (CrNi 1.4571)
27 VALVE BALL AISI 440 C
28 FLOAT VALVE SEAT AISI 316 Ti (CrNi 1.4571)
29 FLOAT VALVE CONE EPDM
30 COVER 'O' RING VITON
31 BALL VALVE SEATS PTFE
32 STEM SEAL PTFE
33 INSPECTION AND TEST
34 HYDROSTATIC TEST PRESSURE ACCORDING TO CODE
35 OTHER TESTING Dye penetrant on body and cover
36
37
38 CERTIFICATION TO EN 10204
39 MATERIALS 2.2
40 TOTAL SUPPLY STATEMENT OF COMPLIANCE
41
42
43 NOTES
44
45
46
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
Path: C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11277 Automatic air vent Rev T01.xls]DSsht.1
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11278 Sht 1 of 1
Communications Piping Class: N.A.
QUARTER-TURN
Development of Muscat & Salalah International Airports ELECTRIC VALVE ACTUATOR
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LVHA KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D APPR'D COUNTRY OF ORIGIN *)
ID DESCRIPTION SPECIFIED VENDOR DATA REV
PLANT SPECIFIC DATA
1 AMBIENT TEMPERATURE °C +10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
INSTRUMENT DESIGN DATA
ACTUATOR
5 TYPE Electric actuator
6 DOUBLE ACTING / SPRING RETURN Double acting
7 VALVE MAX. STATIC SHUTOFF DELTA P 1000 kPa
8 FAIL POSITION N.A.
9 SUPPLY, electrical /voltage 3 ph., 415 VAC, 50 Hz
10 POWER SUPPLY ALLOWABLE TOLERANCE +10% / -15%
11 REQUIRED TORQUE (MIN) Nm In accordance with valve requirements
12 VALVE TRAVEL TIME, min./max. (sec) 3 Sec. / 1,5 * Nominal Bore in inches
13 ANTI-CONDENSATION HEATER (yes/no) Yes
14 ACTUATOR CONTROL DIAGRAM Yes
15 MOUNTING (Vertical/Horizontal) Vertical & Horizontal, ISO 5211
16 Classification - Mechanical & Electrical N.A.
LOCAL CONTROL
17 MANUAL CONTROL (yes/no) Yes
18 HAND SWITCH FOR LOCAL/0/REMOTE (yes/no) Yes
19 PUSHBUTTON OPEN/CLOSE (yes/no) Yes
20 MANUAL OVERRIDE (yes/no) Yes, Handwheel, Non-clutch
21 VALVE POSITION INDICATION (yes/no) Yes
LIMIT SWITCHES
22 FOR OPEN AND CLOSED POSITION (yes/no) Yes
23 CONTACT TYPE SPDT (potential free shift over contact)
ADJUSTABLE (yes/no) Yes, Synchronised with valve shaft for motor
24
and manual operation
25 TAMPER PROOF (yes/no) Yes
26 TORQUE LIMIT SWITCH Adjustable over the entire torque range
CONTACT TYPE SPDT (potential free shift over contact)
27 RATING 0.5 A 24 VDC
28 HOUSING 316 SS / impact resist. thermo plastic IEC 92-101
29 CONNECTION M20 * 1,5 mm ISO INT
30 PROTECTION, enclosure Min. IP55
31 Classification - electrical N.A.
REMOTE VALVE POSITION INDICATION
32 POSITION INDICATION (yes/no) Yes
33 TYPE Position transmitter 4-20 mA
34 RATING N/A
35 HOUSING N/A
36 CONNECTION N/A
37 PROTECTION, enclosure Min. IP55
38 Classification - electrical N.A.
PUSH BUTTON
39 P/B TYPE (yes/no) N/A
40 RATING Min. 24 VDC/5A
41 HOUSING Impact resistant thermo plastic to IEC 92-101
42 CONNECTIONS M20 * 1,5 mm ISO INT
43 PROTECTION, enclosure Min. IP55
44 Classification - electrical N.A.
IDENTIFICATION
45 All items to be individually tagged by labels screwed/glued
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11278 Electric quarter turn valve actuator Rev. T01.xls]Actuator
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11279 Sht 1 of 1
Communications Piping Class: N.A.
Path: C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11280 Suction strainer Rev T01.xls]DSsht.1
Sultanate of Oman
Ministry of Transport &
Doc. Number: AL-905-P-11280 Sht 2 of 2
Communications
Piping Class: AC01 & AC02
SUCTION STRAINER
FOR CONDENSER PUMPS
Development of Muscat & Salalah International Airports
DATA SHEET
Path: C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11280 Suction strainer Rev T01.xls]DSsht.1
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11281 Sht 1 of 1
Communications Piping Class: N.A.
DATA SHEET
Development of Muscat & Salalah International Airports
MERCURY THERMOMETER
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ OSM KWM NIER MANUFACT. & MODEL NO.*)
REV DESCRIPTION DATE PREP'D CHK'D APPR*D APPR*D COUNTRY OF ORIGIN *)
ID DESCRIPTION SPECIFIED VENDOR DATA REV
PLANT SPECIFIC DATA
1 AMBIENT TEMPERATURE °C 10 / +55
2 HUMIDITY % 95
3 ENVIRONMENT SALIFEROUS
4 AREA CLASSIFICATION SAFE
EQUIPMENT SPECIFIC DATA
5 SERVICE (Located at) Chilled water
6 TYPE Mercury in steel
7 MANUFACTURER *)
8
9 DESIGN
10 ELEMENT TYPE Burdon tube
11 STEM Adjustable angle
12 STEM THREAD M20 x 1.5 (Male)
13 STEM LENGTH / O.D. To suit thermowell
14 TEMPERATURE RANGE °C 0 - 120
15 ACCURACY ± 1% OF FULL SCALE
16 DIAL SIZE mm 100
17 DIAL COLOUR White
18 DIAL MARKINGS Black
19 LENS Shatterproof glass
20 EXTERNAL ZERO ADJUSTMENT Yes/No No
21 BULB DIAMETER mm 10
22
23 MATERIAL
24 CASE 316 SS
25 PROBE 316 SS
26 BULB 317 SS
27
28
29 STEM LENGTH
30
31
32 SPRING LOADED (yes/no) No
33 INTERCHANGEABILITY RTD IEC-60751 class B Yes
34 TC ANSI C96.1 N.A.
35
36
37
38
39
40
41
42
43
44
45
46
47
48 THERMOWELL BS IEC 61520 Standard drawing refer to special specification 3100
49
50 CERTIFICATION
51 PRESSURE RETAINING PARTS EN 10204 2.1
52 ELECTRICAL N.A.
53
54 IDENTIFICATION TAG. NO. SS Tag screwed/glued on body
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
C:\61400\Data sheets\June 1 2008\Data sheets\Detailed design\Data sheets T01\[AL_905_P_11281_Mercury thermometer Rev. T01.xls]Temperature indicator
Sultanate of Oman
Ministry of Transport Doc. Number: SE-962-P-11282 Sheet 1 of 2
CONDENSATE TRANSFER
Development of Muscat International Airport SUBMERSIBLE CENTRIFUGAL PUMP
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Tender 01.08.2008 PZ LLM KWM NIER MANUFACT. & MODEL NO. *)
REV DESCRIPTION DATE PREP'D CHK'D APPR'D APPR'D COUNTRY OF ORIGIN *)
ID DESCRIPTION SPECIFIED VENDOR DATA REV
PLANT SPECIFIC DATA
1 AMBIENT TEMPERATURE (NORMAL / MAX) °C 25 / 50
2 HUMIDITY (NORMAL / MAX) % 60 / 95
3 ENVIRONMENT EXPOSED, SALIFEROUS
4 AREA CLASSIFICATION ZONE 0 (SAFE)
5 DESIGN SEISMIC LOAD ACC. TO UBC1997 ZONE 2A
GENERAL
6 NUMBER OF PUMPS (One pump per tank) See drg. no. SE-963-000-P-44731
7 TAG NUMBERS See drg. no. SE-963-000-P-44731
PROCESS SPECIFIC DATA
8 SERVICE (Location) CONDENSATE COLLECTION SYSTEM
9 FLUID WATER
10 PUMPING TEMPERATURE ºC 5-35
11 SPECIFIC GRAVITY AT °C kg/m³ 999.7
12 VISCOSITY AT 10 °C cP 1.31
13 VAPOUR PRESSURE AT 10 °C bar(a) 0.012
14 NPSH AVAILABLE (Maks.value corresponds to full tank) m Water 0 - 3.2
PUMP HEAD CURVE
15 SHUT-OFF HEAD m Water VENDOR DATA
16 OPERATING POINT CAPACITY l/s See drg. nr. SE-963-000-P-44731
17 OPERATING POINT HEAD m Water See drg. nr. SE-963-000-P-44731
18 NPSH REQUIRED m Water N.A.
19 EFFICIENCY MININUM % 77.5
20 EFFICIENCY IN BEST EFFICIENCY POINT (BEP) % VENDOR DATA
21 CAPACITY AT BEP l/s See drg. nr. SE-963-000-P-44731
22 HEAD AT BEP m Water VENDOR DATA
CONSTRUCTION
23 DESIGN PRESSURE, MINIMUM bar(g) 10
24 DESIGN TEMPERATURE °C 120
25 TEST PRESSURE bar(g) ACCORDING TO STANDARD
26 NOZZLES FLANGE TYPE BS EN 1092-1
27 NOZZLES RATING PN16
28 NOZZLES FACING 11 RF B1
29 MAXIMUM SOLID PARTICLE SIZE mm 10
30 SUCTION NOZZLE SIZE in./mm N.A.
31 SUCTION NOZZLE POSITION END SUCTION
32 DISCHARGE NOZZLE SIZE in./mm VENDOR DATA
33 DISCHARGE NOZZLE POSITION VERTICAL
34 NUMBER OF STAGES VENDOR DATA
35 IMPELLER TYPE: OPEN/CLOSED/OVERHUNG/BETWEEN BRG. CLOSED
36 DIAMETER mm VENDOR DATA
37 RATED MAX / MIN mm VENDOR DATA
38 ROTATION (viewed from CPLG) CW/CCW VENDOR DATA
39 BEARING - TYPE RADIAL / TRUST RADIAL
40 LUBRICAT.: Ring Oil/Flood/Oil Mist/Flinger/Pressure Flood
41 RATED LIFE TIME MINIMUM hrs 200,000
42
43
44
45
46
47
48
49
50
51
52
*) All INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY.
C:\61400\Data sheets\T01\Attachment to Spec 3100 -data sheets incl list\Excel files\[SE_962_P_11282 Condensate Transfer Pump Rev T01.xls]Data sheet
Sultanate of Oman
Ministry of Transport Doc. Number: SE-962-P-11282 Sheet 2 of 2
CONDENSATE TRANSFER
Development of Muscat International Airport SUBMERSIBLE CENTRIFUGAL PUMP
ID DESCRIPTION SPECIFIED VENDOR DATA REV
MATERIALS
53 CASING / COVER AISI 316
54 IMPELLER AISI 316 / FIberglass reinforced nylon
55 SHAFT HIGH TENSILE STAINLESS STEEL
56 CASE WEAR RINGS REPLACEABLE LEAD-FREE BRONZE
57 IMPELLER WEAR RINGS LEAD-FREE BRONZE
58 SHAFT SLEEVE LEAD-FREE BRONZE
MECHANICAL SEALING REQUIREMENTS
59 TYPE VENDOR DATA
60 MANUFACTURER VENDOR DATA
61 MATERIAL CODE VENDOR DATA
ELECTRIC MOTOR AND TRANSMISSION
62 DESIGN, CONSTR., PERFORM., TESTING. STD. IEC OR NEMA
63 ENCLOSURE AND COOLING TYPE TEFC, IP 68
64 RATED POWER kW VENDOR DATA
65 POLE 4
66 RATED VOLTAGE / PHASE / FREQUENCY V/ph/Hz 415 / 3 / 50
67 RATED AMBIENT TEMPERATURE °C 50
68 INSULATION CLASS F
69 DESIGN MAX. TEMPERATURE RISE OF WINDING °C 50
70 TIME RATING NON-CONTINUOUS DUTY
71 MINIMUM ALLOWABLE NUMBER OF STARTS PER HOUR 25
72 SERVICE FACTOR (NEMA MOTOR) 1.15
73 SUITABLE FOR VFD (yes/no) N.A.
74 THERMISTORS (2 NOS. PER PHASE) (yes/no) YES
75 INSULATED NON-DRIVEN END BEARING (yes/no) NO
76 STARTING METHOD DOL
77 LOCKED ROTOR CURRENT (LRC) A VENDOR DATA
78 FULL LOAD CURRENT (FLC) A VENDOR DATA
79 MIN. EFFICIENCY AT 100% / 75% / 50% LOAD MINIMUM ACC. TO IEC 60034-30 ED.1
80 MIN. POWER FACTOR AT 100% / 75% / 50% LOAD 0.86 / 0.84 / 0.77
81 RATED SPEED rpm VENDOR DATA
82 DIRECTION OF ROTATION (ON PUMP COUPLING) VENDOR DATA
83 TRANSMISSION: DIRECT / GEAR / BELT DIRECT
84 COUPLING
85 MANUFACTURER VENDOR DATA
86 TYPE: SPACER / LIMITED END FLOAT HEAVY-DUTY FLEXIBLE SPACER
87 GUARD REMOVABLE
88 CABLE TYPE VENDOR DATA
STANDARDS AND SPECIFICATIONS
89 DESIGN CODE PUMP BS EN ISO 5199, BS EN 1092-2, ISO 1940
90 DESIGN CODE MOTOR EN/IEC 60034, IEC 60072, EN 50347
PROTECTIVE COATING
91 PROTECTIVE COATING N.A.
MOUNTING AND FIXATION
92
PUMP DIMENSIONS, PUMP and BASE (L x W) mm x mm VENDOR DATA
93 GUIDE BAR FOR LOWERING & LIFTING (Yes / No) YES,
94 FOUNDATION BOLTS (Yes / No) YES
95 INERTIA BASE (Yes / No) YES
96 FOOTPRINT mm x mm VENDOR DATA
97 SUPPORT Type INTEGRAL
98 PLINTH (Yes / No) NO
99 LIFTING CHAIN (Yes / No) YES
100
WEIGHTS
101 PUMP kg VENDOR DATA
102 BASE kg VENDOR DATA
103 ELECTRIC MOTOR kg VENDOR DATA
104 TOTAL kg VENDOR DATA
105 NOTES:
106
107
108
109
*) All INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY.
C:\61400\Data sheets\T01\Attachment to Spec 3100 -data sheets incl list\Excel files\[SE_962_P_11282 Condensate Transfer Pump Rev T01.xls]Data sheet
Sultanate of Oman
Ministry of Transport & Doc. Number: AL-905-P-11283 Sht 1 of 2
Communications Piping Class: ALL CLASSES
DATA SHEET
SPECIAL PIPING PART
Development of Muscat & Salalah International Airports
VENT AND DRAIN RING
REQ./P.O. NO.
CONTRACT NO.
T01 Issued for Review 31.12.2008 PZ TNA STJ NIER MANUFACT. & MODEL NO. *)
REV. DESCRIPTION DATE PREP'D CHK'D APP'D APP'D COUNTRY OF ORIGIN *)
LI. NO: DESCRIPTION SPECIFIED VENDOR DATA *) Rev
1 INSTALLATION / PROCESS DATA
2 SERVICE General
3 MAX. OPERATING PRESSURE (barg) 12.5
4 TEMPERATURE RANGE (deg C) 0 / 55
5 INSTALLATION / LOCATION INDOOR, BELOW GROUND
6 SOUR SERVICE - NACE MR0175 (YES/NO) NO
7 EROSIVE SERVICE (YES/NO) NO
8
9
10 DESIGN SPECIFIC DATA
11 DESIGN CODE EN 13480 / ASME B16.34
12 NOMINAL SIZE REFER TO PURCHASE ORDER
13 PRESSURE RATING PN 16
14 FACE TO FACE DIMENSIONS See sketch Page 2
15 FACING OF RING BS EN 1092-1, Type 11, RF B1
16 DESIGN PRESSURE (barg) 16
17 DESIGN TEMPERATURE (deg C) -10 /85
18 CORROSION ALLOWANCE (mm) 1.3
19 MESH SIZE (mm) 1.0
20 VENT AND DRAIN CONNECTION SIZE DN 25
21 DRAIN AND VENT VALVE Ref. AL-905-P-11245
22
23
24 MATERIAL SPECIFIC DATA
25 BODY ASTM A105 / BS1503 Gr. 221-490
26 NIPPLES ASTM A106 Gr.B / BS3602 Gr. HFS410
27
28
29
30
31
32 INSPECTION AND TEST
33 HYDROSTATIC TEST PRESSURE ACCORDING TO CODE
34 OTHER TESTING MPI ON BODY
35 WELDING 100% ULTRASONIC
36
37 CERTIFICATION TO EN 10204
38 MATERIALS 3.1
39 TOTAL SUPPLY STATEMENT OF COMPLIANCE
40
41
42 NOTES
43
44 Purchase Order will specify if both vent and drain connections are required.
45
*) ALL INCLUDING SHADED FIELDS TO BE COMPLETED BY SUPPLIER, REQUIREMENTS SPECIFIED NEXT TO SHADED FIELDS ARE COMPULSORY
Path: \\Ommufunc1\proj\61400\4_TEC\R_O_P_Equip._&_Utilities\13_Chilled_Water\06_AL_Specs\Data sheets\Dec 2008\[AL_905_P_11283 SPP Vent and drain ring Rev T01.xls]DSsht.1
Sultanate of Oman
Ministry of Transport &
Doc. Number: AL-905-P-11283 Sht 2 of 2
Communications
Piping Class: ALL CLASSES
DATA SHEET
Development of Muscat & Salalah International Airports
SPECIAL PIPING PART
VENT AND DRAIN RING
Notes:
1. OD to suit flange RF in accordance with BS EN 1092-1, Type 11 RF B1
2. ID to suit pipe.
3. Tag number shall hard stamped on ring body:
Tag number shall consist of: Nominal size, pipe material code (Piping Class designation) and fluid code
Example: DN100 ring in ductile iron Fire Fighting system 100-DI-FFW
Path: \\Ommufunc1\proj\61400\4_TEC\R_O_P_Equip._&_Utilities\13_Chilled_Water\06_AL_Specs\Data sheets\Dec 2008\[AL_905_P_11283 SPP Vent and drain ring Rev T01.xls]DSsht.1