Utilization (EU) %
Dry Weather Utilization %
Comments Jan-14 Feb-14 Mar-14 Apr-14 May-14
31 28 31 30 31
30 28 31 30 31
lower due to covered by rain and down code 1.25 1.25 1.25 1.25 1.25
- - - - -
10 minutes per shift 0.33 0.33 0.33 0.33 0.33
- - - - -
- - - - -
- - - - -
1 hour every friday 0.13 0.14 0.16 0.13 0.16
30 minutes per week 0.07 0.07 0.07 0.07 0.07
- - - - -
- - - - -
10 minutes per shift 0.33 0.33 0.33 0.33 0.33
- - - - -
0.5 hour per day 0.50 0.50 0.50 0.50 0.50
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
1.0 - - - -
1.0
30 31 31 30 31 30 31 365
29 29 31 30 31 30 30 359
Date 13-Dec-14
Pit 01 K0131 K0133
dist 1
dist 2
dist 3
dist max 0 0
Pit 07 K0136 K0177
dist 1 0.000
dist 2 0.000
dist 3
dist max 0.000 0
Pit Sari K0139 K0141
dist 1 2191.998
dist 2 2058.169
dist 3 2058.169
dist max 2191.998 0
02-Dec-14 03-Dec-14 04-Dec
Distance Dumping Elevation Distance Dumping Elevation Distance
2,009.95 RL 100 100.30 2,056.44 RL 100 100.70 2,141.02
1,951.07 RL 80 81.30 1,490.83 RL 80 85.30 1,704.20
2,961.63 RL 100 100.30 2,035.10 Bundwall IM 36.10 2,606.87
DOWN DOWN
1,577.17 Bundwall IM 36.30 1,620.61 Bundwall IM 36.10 1,604.25
DOWN DOWN
2,211.35 Bundwall IM 36.30 2,254.82 Bundwall IM 36.10 2,232.68
0.000 0.000
K0142 K0145 K0140 K0136
2583.782 2504.773 2676.081
2537.487 2497.467 2636.970
2537.487 2524.778 2636.970
0 2583.782 2524.778 2676.081
`
04-Dec-14 05-Dec-14 06-Dec-14
Dumping Elevation Distance Dumping Elevation Distance
RL 100 100.80 1,868.73 RL 100 100.40 2,117.58
RL 80 80.80 1,844.82 RL 80 100.40 2,151.31
RL 80 80.80 3,044.81 RL 100 100.40 1,949.28
2,540.45 2,513.53
2,467.71
08-Dec-14 09-Dec-14 10-Dec-14
Dumping Elevation Distance Dumping Elevation Distance
RL 100 101.20 2,066.52 RL 100 101.00 1,049.73
RL 50 Selatan 46.40 973.14 RL 50 Selatan 47.10 1,015.72
Bundwall IM 35.50 1,883.84 Bundwall IM 37.00 1,744.79
2,504.03 2,432.43
10-Dec-14 11-Dec-14 12-Dec-1
Dumping Elevation Distance Dumping Elevation Distance
RL 50 Selatan 49.50 1,028.57 RL 50 Selatan 42.80 1,206.31
RL 50 Selatan 49.50
Bundwall IM 37.30 1,602.77 Bundwall IM 31.36 1,764.21
-
-
-
RL 100 100.90 2,319.19 RL 100 95.85 724.01
IM Bawah 370.00 2,094.01 RL 100 95.85 1,185.99
-
Bundwall IM 37.30 1,728.32 Bundwall IM 31.36 2,532.59
Bundwall IM 37.30 1,057.08 IM Bawah 62.78 1,172.96
-
IM Bawah 37.00 833.71 IM Bawah 62.78 1,372.79
1,523.38 829.91
RL 60 WD 07 67.70 2,880.35 RL 60 WD 07 59.60 2,003.08
RL 60 WD 07 67.70 2,794.63 RL 60 WD 07 59.60 2,566.18
RL 60 WD 07 67.70 2,990.97 RL 60 WD 07 59.60 2,684.61
2,885.83 2,465.71
12-Dec-14 13-Dec-14
Dumping Elevation Distance Dumping Elevation
RL 50 Selatan 49.60 2,148.84 RL 100 Selatan 101.20
-
Bundwall IM 39.10 1,376.44 IM Bawah 39.00
-
-
-
Waterfill (97.60) 1,897.27 IM Bawah 39.00
IM Bawah 39.70 2,132.18 Camp Lama RL 60 60.00
-
RL 50 Selatan 49.60 2,933.90 RL 100 Selatan 101.20
IM Bawah 39.70 1,337.12 IM Bawah 39.00
-
IM Bawah 39.70 1,775.78 Camp Lama RL 60 60.00
1,046.27
RL 70 WD 07 69.00 2,192.00 RL 70 WD 07 & Dump Soil 70.50
RL 70 WD 07 69.00 2,676.08 RL 70 WD 07 70.50
RL 70 WD 07 69.00 2,524.78 RL 70 WD 07 70.50
2,494.16
-
-
-
-
-
4 16-Dec-14 17-Dec-14
Elevation Distance Dumping Elevation Distance
17-Dec-14 18-Dec-14
Dumping Elevation Distance Dumping Elevation
19-Dec-14 20-Dec-14
Distance Dumping Elevation Distance Dumping Elevation
21-Dec-14 22-Dec-14
Distance Dumping Elevation Distance Dumping Elevation
23-Dec-14 24-Dec-14
Distance Dumping Elevation Distance Dumping
25-Dec-14 26-Dec-14
Elevation Distance Dumping Elevation Distance Dumping Elevation
27-Dec-14 28-Dec-14
Distance Dumping Elevation Distance Dumping Elevation
29-Dec-14 30-Dec-14
Distance Dumping Elevation Distance Dumping Elevation
DAILY SETTING FLEET
PT PETROSEA ABN
TANGGAL : 14-Dec-14 DS `
Loader Hauler PDTY
Jenis Distance MATCH
PIT No. Material (Km) FACTOR Remark
C/N Type Dump Area QTY Travel Spd Loader
2.20 18 1.03
1 K0159 300T RL 70 Selatan Pasir 8 900
2.20 18 1.03
2 K0160 300T RL 70 Selatan Pasir 8 900
1.60 18 0.96
3 K0161 300T Bundwall IM Ripping 6 900
1.90 18 1.00
4 K0135 250T Bundwall IM Ripping 6 750
PIT 1
2.20 18 0.90
5 K0143 250T RL 60 Camp Lama Ripping 6 750
3.00 18 0.96
6 K0154 250T RL 70 Selatan Ripping 8 750
2.00 18 0.96
7 K0173 200T RL 60 Camp Lama Ripping 4 500
1.70 18 1.02
8 K0177 200T Bundwall IM Non Ripping 4 500
WD 7 2.20 20 1.06
9 K0139 250T Ripping 7 800
WD 7 2.60 20 0.95
10 K0145 250T Ripping 7 800
PIT SARI
WD 7 2.50 20 0.97
11 K0140 250T Ripping 7 800
WD 7 2.60 20 0.95
12 K0136 250T Ripping 7 800
TOTAL TRUCK PIT 1 50
TOTAL TRUCK PIT 18.7
SARI 28
TANGGAL : 15-Dec-14 DS `
Loader Hauler PDTY
Jenis Distance MATCH
PIT No. Material (Km) FACTOR Remark
C/N Type Dump Area QTY Travel Spd Loader
1.30 18 1.09
1 K0159 300T RL 70 Selatan Pasir 6 900 Lewat jalan belakang fuel station
2.20 18 1.03
2 K0160 300T RL 100 Selatan Pasir 8 900 BREAKDOWN
1.60 18 0.96
3 K0161 300T Bundwall IM Ripping 6 900
1.90 18 1.00
4 K0135 250T Bundwall IM Ripping 6 750
PIT 1
1.80 18 1.03
5 K0143 250T RL 60 Camp Lama Ripping 6 750
3.00 18 0.96
6 K0154 250T RL 70 Selatan Ripping 8 750
2.20 18 0.90 Dumping di Bundwall IM saat mulai ekspose Seam 6, jika ekspose
7 K0173 200T Bundwall IM Ripping 4 500 seam 12 D dumping di RL 60 Camp Lama
2.00 18 0.96
8 K0177 200T RL 60 Camp Lama Ripping 4 500 BREAKDOWN
WD 7 2.20 20 1.06
9 K0139 250T Ripping 7 800
WD 7 2.60 20 0.95
10 K0145 250T Ripping 7 800
PIT SARI
WD 7 2.50 20 0.97
11 K0140 250T Ripping 7 800
WD 7 2.60 20 0.95
12 K0136 250T Ripping 7 800
TOTAL TRUCK PIT 1 48
TOTAL TRUCK PIT 18.74
SARI 28
TANGGAL : 15-Dec-14 NS `
Loader Hauler PDTY
Jenis Distance MATCH
PIT No. Material (Km) FACTOR Remark
C/N Type Dump Area QTY Travel Spd Loader
2.20 18 1.03
1 K0159 300T RL 100 Selatan Pasir 8 900
1.30 18 0.90
2 K0160 300T RL 50 Selatan Pasir 5 900 Lewat jalan belakang fuel station
1.60 18 0.96
3 K0161 300T Indomining Bawah Ripping 6 900
1.90 18 1.00
4 K0135 250T Indomining Bawah Ripping 6 750
PIT 1
2.10 18 0.93
5 K0143 250T RL 70 Camp Lama Ripping 6 750 BREAKDOWN
3.00 18 0.84
6 K0154 250T RL 100 Selatan Ripping 7 750
2.20 18 0.90
7 K0173 200T Indomining Bawah Ripping 4 500
2.00 18 0.96
8 K0177 200T RL 70 Camp Lama Ripping 4 500
WD 7 2.20 20 0.91
9 K0139 250T Ripping 6 800
WD 7 2.60 20 0.81
10 K0145 250T Ripping 6 800
PIT SARI
WD 7 2.50 20 0.83
11 K0140 250T Ripping 6 800
WD 7 2.60 20 0.81
12 K0136 250T Ripping 6 800
TOTAL TRUCK PIT 1 46
TOTAL TRUCK PIT 18.69
24
SARI
TANGGAL : 16-Dec-14 NS `
Loader Hauler PDTY
PIT No. Jenis Distance MATCH Remark
C/N Type Dump Area Material (Km) QTY Travel Spd Loader FACTOR
2.20 18 0.97
1 K0159 300T RL 100 Selatan Pasir 8 950
1.20 18 0.90
2 K0160 300T RL 50 Selatan Pasir 5 950 Lewat jalan belakang fuel station
1.60 18 0.96
3 K0161 300T Indomining Bawah Ripping 6 900
1.60 18 0.93
4 K0135 250T Indomining Bawah Ripping 5 750 gunakan 6 HD jika expose seam 5 utara
PIT 1
2.10 18 0.93
5 K0143 250T RL 70 Camp Lama Ripping 6 750 BREAKDOWN
2.70 18 0.91
6 K0154 250T RL 50 Selatan Ripping 7 750 gunakan 8 HD jika dumping di RL 100 selatan
1.73 18 1.06
7 K0173 200T Indomining Bawah Ripping 4 500
1.74 18 1.06
8 K0177 200T RL 70 Camp Lama Ripping 4 500
WD 7 2.20 20 0.91
9 K0139 250T Ripping 6 800
WD 7 2.60 20 0.81
10 K0145 250T Ripping 6 800
PIT SARI
WD 7 2.50 20 0.83
11 K0140 250T Ripping 6 800
WD 7 2.60 20 0.81
12 K0136 250T Ripping 6 800
TOTAL TRUCK PIT 1 45
TOTAL TRUCK PIT 18.70
24
SARI
TANGGAL : 16-Dec-14 NS `
Loader Hauler PDTY
PIT No. Jenis Distance MATCH Remark
C/N Type Dump Area Material (Km) QTY Travel Spd Loader FACTOR
1.20 18 0.90
1 K0159 300T RL 50 Selatan Pasir 5 950
2.20 18 0.97
2 K0160 300T RL 100 Selatan Pasir 8 950 Lewat jalan belakang fuel station
1.60 18 0.96
3 K0161 300T Indomining Bawah Ripping 6 900
1.90 18 1.00
4 K0135 250T Indomining Bawah Ripping 6 750
PIT 1
Seam 14 Ramp 0.90 18 1.02
5 K0143 250T Ripping 4 750 backfill seam 14 permanent ramp
permanent
2.70 18 0.91
6 K0154 250T RL 50 Selatan Ripping 7 750 gunakan 8 HD jika dumping di RL 100 selatan
1.73 18 1.06
7 K0173 200T Indomining Bawah Ripping 4 500
1.74 18 1.06
8 K0177 200T RL 70 Camp Lama Ripping 4 500
WD 7 2.20 20 0.91
9 K0139 250T Ripping 6 800
WD 7 2.60 20 0.81
10 K0145 250T Ripping 6 800
PIT SARI
WD 7 2.50 20 0.83
11 K0140 250T Ripping 6 800
WD 7 2.60 20 0.81
12 K0136 250T Ripping 6 800
TOTAL TRUCK PIT 1 44
TOTAL TRUCK PIT 18.71
24
SARI
TANGGAL : 17-Dec-14 DS `
Loader Hauler PDTY
PIT No. Jenis Distance MATCH Remark
C/N Type Dump Area Material (Km) QTY Travel Spd Loader FACTOR
1.20 18 0.90
1 K0159 300T RL 50 Selatan Pasir 5 950
2.20 18 0.97
2 K0160 300T RL 100 Selatan Pasir 8 950 Lewat jalan belakang fuel station
1.60 18 0.96
3 K0161 300T Indomining Bawah Ripping 6 900
1.90 18 1.00
4 K0135 250T Indomining Bawah Ripping 6 750
PIT 1
Seam 14 Ramp 0.90 18 1.02
5 K0143 250T Ripping 4 750 Breakdown (backfill seam 14 permanent ramp)
permanent
3.10 18 0.94
6 K0154 250T RL 100 Selatan Ripping 8 750
1.73 18 1.06
7 K0173 200T Indomining Bawah Ripping 4 500
1.74 18 1.06
8 K0177 200T RL 70 Camp Lama Ripping 4 500
WD 7 2.20 20 0.91
9 K0139 250T Ripping 6 800
WD 7 2.60 20 0.81
10 K0145 250T Ripping 6 800
PIT SARI
WD 7 2.50 20 0.83
11 K0140 250T Ripping 6 800
WD 7 2.60 20 0.81
12 K0136 250T Ripping 6 800
TOTAL TRUCK PIT 1 45
TOTAL TRUCK PIT 18.70
24
SARI
TANGGAL : 5-Dec-14 DS `
Loader Hauler
Jenis Distance MATCH
PIT No. Material (Km) FACTOR Remark
C/N Type Dump Area Type QTY QTY